(Under Replacement) Suite Elevator in Hotel "Hilton" in K.L. in Washington, USA

āđāļŠāļĢāđŒ
āļāļąāļ‡
  • āđ€āļœāļĒāđāļžāļĢāđˆāđ€āļĄāļ·āđˆāļ­ 9 āļ.āļž. 2025
  • This elevator was remain under construction, Yet it's somehow under mod or replacement, But I should know that it's actually being built.
    #elevator
    #hotel
    #hotelhilton
    Location (Undisclosed Location), K.L. City, 🇚ðŸ‡ļ (Washington State)
    Footage Recorded on: My main PC
    Footage recorded in: (Day 21) 21st January 2025

āļ„āļ§āļēāļĄāļ„āļīāļ”āđ€āļŦāđ‡āļ™ •