    This video aims to correct the wrong practices on construction sites and improve the quality of work.
    _________________________________________________________________________________________________
    What is Fair use?
    Fair use is a legal doctrine or a Law that allows the reuse of copyright-protected material under certain circumstances without getting permission from the copyright owner.
    This video is edited under the Fair Use Law of TH-cam. No copyright infringement is intended. Credit to the owner of the Image, Video clip, Music background, etc.
    Credit to the owner of the video clip
    HOOK OF REBARS FOR FOOTING
    • PAANO MAG ESTIMATE NG ...

ความคิดเห็น • 958

  • @cesarcacayan6916
    @cesarcacayan6916 2 ปีที่แล้ว +23

    May mali sa footing foundation: walang compacted gravel bed (90% compaction density). Hindi binubuhos ang graba kapag naasinta ang footing rebar. Correct ka diyan, hindi tama ang preparation ng foundation sa video. Walang alam ang mga manggagawa sa tama rebar installation standard at kailangan ng direct supervision ng engineer. Para maiwasan ang pagasya ng labor sa pagkalas at reinstallation ng rebars. Dapat na basahin ng mangagawa ang structural notes and direction ng nakasaad sa plano. Hindi lahat ng construction ay magkapareo. Nasasaad sa structural notes and detail standards na gagamitin sa project
    Correct ka diyan. Ang vertical rebar ng mga poste ay dapat nasa ibabaw ng footing rebar.

  • @joshu5097
    @joshu5097 2 ปีที่แล้ว +3

    sir ipagpatuloy nyo lang ito malaking tulong ito sa mga walang alam na may ari ng bahay na may balak magbagawa para magkaroon ng good idea....
    salamat....

  • @junredoblado2171
    @junredoblado2171 2 ปีที่แล้ว +4

    Awesome Yong pagtatama sa maling ginagawa sa construction site. Na papansin ko ring pagmamadali at pagtitipid sa materyales sa construction. Maganda talaga magkaroon ang mga constructor or construction employee ng seminars para sa mga tama at Maling ginagagawa sa construction site. Meron din akong napansin Yong supervision ng LGU - DENR Engineering o kung sino man ang dapat mag supervise lalo na sa mga construction developer, kung tama ba Yong kanilang sawage system. Minsan sa mga drainage eh meron mga hindi MagandAng amoy walang patay na hayop doon. Parang sa ganitong system patungkol sa sawage system lalo na sa pagitan ng construction developer at engineering LGU Eh nagkakaroon ng something kaya patuloy ang Maling ginagawa sa konstruction site.....dapat talaga magkaroon ng malawak usapin sa ganyang pagmamalabis. Thank you sa ganitong content....... Awesome.....

  • @ecjtv6522
    @ecjtv6522 2 ปีที่แล้ว +5

    Yes sir saludo po ako sayo mahirap magtiwala sa mga vloger na gumgawa ng ganyan klase like constrution works

  • @arttellama2408
    @arttellama2408 2 ปีที่แล้ว +15

    Marami mali sa constrution dto sa pinas:
    1. Implementation ng construction codes, kaya hindi matibay, malimali, at substandard.
    2. Implementation ng city/municipal zoning and planning. No uniformity. Kaya masikip daanan, pangit at wala sa ayos mga lugar natin.
    3. Lack/no city sewage system kaya mabaho at marumi mga ilog natin.
    4. Lack of skills, knowledge, trainings, not certifified ay gumagawa n ng bahay, kaya di maayos pagkagawa at substandard.

    • @DP24PH
      @DP24PH 2 ปีที่แล้ว +1

      [DP] Adding to this is the issue of safety wherein most housing-related construction do not cordon-off properly with the GI-based wall/gate, leading to accidents.
      Plus, construction materials must be stored inside wherein most of construction materials are obstructing the sidewalk, bike lane, and drainage, leading to littering citation and other flood damages.

  • @nikohiroyagami8377
    @nikohiroyagami8377 2 ปีที่แล้ว +4

    Keep it up sir. Marami po matutunan di lang po mga engineering pati n din po mga foreman at mga magplano magpagawa ng bahay. Dahil po sa ganito video tataas po kalidad ng mga ginagawang mga bahay dito satin. Salamat po

  • @unitrendmarketing
    @unitrendmarketing 3 หลายเดือนก่อน +1

    its good to know that you are giving much info to our local plumbers how to plumb properly and not create polution. problem we have there is lack of information. i am a registered mechanical engineer there in philippines and a practicing mechanical engineer here in uk doing compliance for MEP services. if its combine sewage this must be tap from a drainage connected to water treatment plant with drainage interceptors, for surface water only, it must have a interceptor and the outfall is going to the river. this requires environmental permit. if there is no public connection going to the treatment plant for the septic tank this is connected to the fieldrain which what you show. some surface water are also connected to a soak away. this is the reason why our philippine rivers are poluted because of ignorance.

  • @purisimagayas5923
    @purisimagayas5923 2 ปีที่แล้ว +21

    Thank you sir for taking the time and having the courage to right the wrong. And also for sharing your expertise.

    • @jessiepal-ag1855
      @jessiepal-ag1855 2 ปีที่แล้ว +2

      Oo nga,tama c sir,kung may contrata cya at cya pa ang nag aasis sa mga mang gagawa,e kaso ngayon kahit nga sa mga building may mang coraption na nangyayari dito pa kaya sa media makalikom lng ng like,subcription at viers ----

  • @joeyfeliciano9199
    @joeyfeliciano9199 2 ปีที่แล้ว +3

    Big YES naman jan. Hindi lahat ng nakikita ng mata ay tutuo o tama!

  • @allandizon5601
    @allandizon5601 2 ปีที่แล้ว +4

    galing, God bless you sir
    Tama at napaka importante ang payo mo sa lahat ng maling gawi.

  • @gnekotv
    @gnekotv 2 ปีที่แล้ว +10

    Tama ka brad. Nais ko rin sana gumawa ng mga info videos gaya neto para i-correct din ang mga maling practices on site. Nakikita ko rin on site mga maling practices nila na dapat tinatama ng mga On Field/SupervisingProfessionals.

  • @coolferds06
    @coolferds06 2 ปีที่แล้ว +1

    Very good advice. Thank you.

  • @federicomandac5794
    @federicomandac5794 2 ปีที่แล้ว +4

    Dapat lahat ng gawa ng foreman ay ma double check ng site Engr kung nasusunod ba lahat ng structural notes, importante yon at ito din dapat ma inspect ng structural Engr bago buhusan ng concrete para masigurado na nasunod lahat ang structural requirements, at dapat i certify ng structural Engr ang inspection report.

  • @martinosas9215
    @martinosas9215 2 ปีที่แล้ว +3

    More videos pa po engr. Very Informative

  • @joelcjabonete
    @joelcjabonete 2 ปีที่แล้ว +2

    Very informative.!!! Thanks for sharing this.!! 👍👍👍

  • @NicknVio
    @NicknVio ปีที่แล้ว +2

    Very informative CE-kabaro. Eto rin madals na problem namin dito sa pag-prepare namin ng mga plans bilang AR . Sa ibang munisipyo bawal mag discharge ng waste from septic tank sa abutting na lupa dahi sa Clean water act na basis. Sa ibang Munisipyo naman allowed at magandang gamitin etong napresent mo dito sa video. Sa case naman dito sa amin sa Baguio, allowed before pero dahil nag-exceed na ang population, di na kaya ng Treatment plant, binawal na these years. And mga house owners ay naka-depende nagyon sa "suction" na napaka mahal. Narealize ko, kanya kanya pala Local Code pag dating dito sa discharge ng septic tank. However, responsibility dapat ng isang Munisipyo or City na magprovide ng centralized Sanitary Treatment Facility sa nasasakopan as part of City/Urban or Community Planning para maka-connect sila dito for septic tank discharge. Dito dapat pumupunta mga Tax ng community. Thanks so much for sharing your knowledge. More power to your channel!

  • @aldrinlaura9660
    @aldrinlaura9660 2 ปีที่แล้ว +18

    iba tlga pag check ng engineer sumunod sa specification

  • @gdvictvmix2414
    @gdvictvmix2414 2 ปีที่แล้ว +4

    Thank for sharing this kind of video. Very interesting regarding how to make exact construction methods.

  • @bojiegrezula9213
    @bojiegrezula9213 2 ปีที่แล้ว +2

    Good job sir, isang hakbang na to para mas mabigyang linaw at ideya sila sa mga mali at dapat gawin pagdating sa ganitong aspeto. maraming salamat sir Godbless

  • @jerrygregorio1037
    @jerrygregorio1037 2 ปีที่แล้ว +2

    Salute to u sir,ganyan n ganyan dn Yong gnawa ko s isang project ng DMCI cunsunji, desiel power plant somewhere in iloilo city. Keep vlogging and educate some who wants to learn about Dat clip. More power God bleesed us.

  • @jerrycasana1157
    @jerrycasana1157 2 ปีที่แล้ว +3

    Thanks for sharing Sir

  • @joeluy5473
    @joeluy5473 2 ปีที่แล้ว +3

    Napaka informative po salamat

  • @ezekdaelo
    @ezekdaelo 2 ปีที่แล้ว +1

    Ang galing. Nice tips.

  • @jamesfrancis2144
    @jamesfrancis2144 2 ปีที่แล้ว +1

    salamat sa info sir. ituloy nyo lang ang pag educate sa mga kumukuha ng kaalaman sa socmed.

  • @ItsLeisure
    @ItsLeisure 2 ปีที่แล้ว +16

    Aron James Garcia-Thank you and please continue to provide more content related to any such correction that we can help to share and have them improve their skills and workmanship and professionalism.

    • @juliesalvador16
      @juliesalvador16 2 ปีที่แล้ว +2

      Next video po para sa mga p pag bend ng bakal ser james

    • @rauldelacruz7821
      @rauldelacruz7821 2 ปีที่แล้ว

      weyuopoeh vbvnnokrp

    • @rauldelacruz7821
      @rauldelacruz7821 2 ปีที่แล้ว

      weyei rekol uekindlopdlfdlogs

  • @GamilJoel1974
    @GamilJoel1974 2 ปีที่แล้ว +4

    Tama ka jan sir James hindi lahat ng napapanood sa you tube or social media ay tama. Dapat maging mapanuri ang tao. ... Tnx a lot sir James. 🙏🏼

    • @MrFUNKISTAH
      @MrFUNKISTAH 2 ปีที่แล้ว

      tulad ng napanood mo may mali din sa info nya hehehhhe

  • @romyturla5097
    @romyturla5097 ปีที่แล้ว +1

    Thank you po Engineer...salamat sa iyong educational video.

  • @maalat
    @maalat 6 หลายเดือนก่อน

    Thank you for the information.

  • @dominicbuilder
    @dominicbuilder 2 ปีที่แล้ว +4

    Good and correct advise to obtain standard construction practices...mahalaga ang technical supervision to create a strong dependable structure. Salamat sa mga correction na dapat sundin.

  • @hermogenestroncoso9909
    @hermogenestroncoso9909 ปีที่แล้ว +3

    Very informative presentation. Iba talaga pag licensed at experienced engr ang magturo. Galing!!!

    • @princessplays9957
      @princessplays9957 ปีที่แล้ว

      Paano Po yong matubig na Lugar gaya nang cotabato?thanks po

  • @user-fc4pp4df9q
    @user-fc4pp4df9q 6 หลายเดือนก่อน

    Thank sir sa npanuod kung lecture nyo.

  • @kinitotv2777
    @kinitotv2777 2 ปีที่แล้ว +2

    nice.
    mahusay po ang pag detalye nio at pag puna sa mga maling post sa mga video nila.
    hope marami pa po kayong video na mapuna at maitama para sa ikakaunlad ng ating industriya sa pag construction.

  • @iamsmartzed2256
    @iamsmartzed2256 2 ปีที่แล้ว +32

    I agree on your first video, to put perforated pipes, but in my construction experience, that would only work for a sandy or loose type of soil, but it won't work in long term on a loamy/clayish type of soils. With all the grime and sludge it would just clogged the perforated pipe in just few months of use.

    • @melchoranacion9994
      @melchoranacion9994 2 ปีที่แล้ว +6

      cguro po it will require greater cross sectional area ng gravel bed around the perforated pipe to compensate ung seepage rate ng other types of soil

    • @ismailrohaan
      @ismailrohaan ปีที่แล้ว +1

      Tama

  • @koreanohilaw8576
    @koreanohilaw8576 2 ปีที่แล้ว +6

    Sir yung sa mga bahay sa probincia ang mga septic tank is walang buhos yung flooring yun po kc naka sanayan d2

  • @jinnycanada8512
    @jinnycanada8512 ปีที่แล้ว +2

    Maraming salamat po sir sa dag2x kaalaman👍

  • @JBamboo
    @JBamboo ปีที่แล้ว +1

    leanings po salamat...dmi ko natutunan kahit di ako engr. pero valuable topic po ito.

  • @renalynlucas67
    @renalynlucas67 2 ปีที่แล้ว +3

    Tama kau jn sir,ako isa Rin akng construction boy lhat ng nsa Plano dapat sinusunod

  • @GabsRomano
    @GabsRomano 2 ปีที่แล้ว +4

    Very informative, keep sharing your knowledge and more power to your channel engr.

    • @ARONJAMESGARCIA
      @ARONJAMESGARCIA  2 ปีที่แล้ว

      Thank you Engr.😊

    • @vivroursolen6177
      @vivroursolen6177 2 ปีที่แล้ว +1

      @@ARONJAMESGARCIA sorry po ,pero may nakita ako na ang footing bago lagyan ng forms at rebars ay ni lagyan ng polyethylene sheets ito ay after the compaction. Paki comment po?

    • @leonardoespina480
      @leonardoespina480 2 ปีที่แล้ว

      @@vivroursolen6177 Tama Yan sir protection po Yan lalo na kung malapit sa tabing dagat sa ibang bansa. Ang bakal nila balot ng manipis na plastic ginagamit po Yun sa malapit sa tubig alat at kung chemical plant base po Yan sa experience ko sa ibang bansa

  • @dindotolentino6471
    @dindotolentino6471 2 ปีที่แล้ว +2

    Sir Salamat sa tamang impormasyon marami kc mima lang makagawa lang ng content sa TH-cam

  • @gregorioestioco6077
    @gregorioestioco6077 ปีที่แล้ว +1

    Ayos yan sir!!! Kadalasan po kasi hindi na masyado tinitignan if may mali or may part na kailangang iayos...Yung style na "pwede na"... If property na po ang pinaguusapan, syempre pinaghirapan ang perang ginamit, kaya magawa dapat nang tama...

  • @noside8469
    @noside8469 2 ปีที่แล้ว +3

    We keep on learning, no matter what the age...
    There are old and there are new
    Importante proper at tamang paraan

  • @krex23tv73
    @krex23tv73 2 ปีที่แล้ว +3

    Galing ng content mo idol

  • @elviraplandez5002
    @elviraplandez5002 2 ปีที่แล้ว +2

    Thank u po sa information sir..always watching your vlogs..godbless

  • @bhongmanglicmot2747
    @bhongmanglicmot2747 2 ปีที่แล้ว +1

    Correct sir aprub!👍

  • @jolomaniago1728
    @jolomaniago1728 2 ปีที่แล้ว +9

    Very informative presentations sir!
    Additional point outs lang if I may:
    1.) Baffle should be open vented as per code, hindi dapat extended yung pipe pataas sa clean out.
    2.) "Leaching Chamber" is yung open bottom chamber kung saan doon mag leach yung black water. The proper term is Secondary/Tertiary Chamber.
    3.) There are restrictions to the on site waste water treatment/Seepage pit, Generally : Lot area if there is no space for it and soil type/condition on site.
    Overall, It was a good watch !

    • @ARONJAMESGARCIA
      @ARONJAMESGARCIA  2 ปีที่แล้ว

      Thank for additional information Sir,👌🏽👌🏽

  • @juanpalaca3137
    @juanpalaca3137 2 ปีที่แล้ว +3

    Korek ka sir... Kaya karamihan sa manila noong nagtambay ako nakikta ko mali ang ginagawa nila mga septic tank doon itatapon sa istero.

  • @rbtech7520
    @rbtech7520 2 ปีที่แล้ว +1

    Napadaan lang po, Engineer.👍

  • @joselitojose3056
    @joselitojose3056 2 ปีที่แล้ว +2

    salamat po sir sa iyong magandang advise mabuhay ka po sir god bless po merry christmas happynew year po

  • @educaspe5887
    @educaspe5887 2 ปีที่แล้ว +4

    iyang video #2, ang kadalasan problema sa mga construction na walang engineer,
    may parte ng bakal sa pundasyon na nakadikit sa lupa, or loose ties,
    yung hindi mahigpit ang pagkatali,
    90% ng construction ng mga bahay na walang engineer ay ganyan ang problema,

  • @zzzzz8990
    @zzzzz8990 2 ปีที่แล้ว +3

    Kawawa naman ang mga titira sa ginawa ng ganitong worker. It probes of the common saying that A LITTLE KNOWLEDGE IS DANGEROUS. MARAMDAMAN MO SA PAGSASALITA NG WORKER SERYUSO SYA AT DEDICATED WORKER . KAYA LANG YUN MALILIIT NA STEP NA OMIT NYA MALIIT PERO DOON NAKASALALAY ANG TIBAY NG BAKAL AT NG BUONG STRUCTURE. SAYANG DI AKO NAGING ENGINEER.

  • @Sportsandnews1985
    @Sportsandnews1985 2 ปีที่แล้ว +2

    Npakalinaw na pagpaliwanag sir at siguradong may matutunan talaga Ang mga makapanuod ,, kompleto detalye ,salamat sir ngkaroon na namn ako ng ideya kung sakaling maybe ma incounter akong ganyan,,salamat sa pag share

  • @enricosilvio8427
    @enricosilvio8427 2 ปีที่แล้ว +1

    Many thanks po sa info Engr.

  • @nimfalaganapan5620
    @nimfalaganapan5620 2 ปีที่แล้ว +11

    The problem is systemic from the top... Meaning from start of building permits..Ang city/municipality puro collection lang ng building permit fees...wala na mang periodic building inspections...kung meron man...pagtapos na for occupancy permit...

    • @speedhunter7303
      @speedhunter7303 2 ปีที่แล้ว +1

      Totoo yan..eh pati yung city engineer substandard din..ugaling ‘pwede na yan’

    • @karage1035
      @karage1035 2 ปีที่แล้ว +1

      @@speedhunter7303 korek.. maraming mga bahay sa pinas ang "pwede na yan " lalo sa rural region. Walang standard. Kulang sa safety. Katulad ng electrical, sanitation at iba pa. Kaya pag nakaroon ng disgrasya,, Nag turuan na at sisihan.

  • @jaypaulcayabyab6775
    @jaypaulcayabyab6775 2 ปีที่แล้ว +4

    Kailangan dyan mag build ng leaching field para sa outlet ng septic tank

  • @laurojrgordula8836
    @laurojrgordula8836 2 ปีที่แล้ว +1

    Salamat engr sa kaalaman.

  • @dongayop9594
    @dongayop9594 ปีที่แล้ว

    Salamat sa pag share ng video

  • @benpung
    @benpung 2 ปีที่แล้ว +25

    In a very ideal setting, the soil absorption field is what is required. Unfortunately you cannot do that in a 10m x 10m (100sqM) lot or even a 250sqM lot... It can be done in the farm, but not in the city or subdivisions. It's the subdivision management and the government negligence is at fault here, they should have constructed a separate storm drainage and sanitary sewers connected to a waste treatment plant....

    • @FACE-PROFILERZ
      @FACE-PROFILERZ 2 ปีที่แล้ว +1

      Philippines are one of the poorest countries. We cannot afford such modern things. That's why we had our own and the ends goes to street. Here in California is way different as its very strict in regulations.

    • @80ivannoel
      @80ivannoel 2 ปีที่แล้ว

      Tama, may mga laws regarding sa tamang sanitary practises tayo na similar naman sa standards ng mga 1st world countries pero kulang sa implemantation. takot din mag-implement ang local government baka hindi na iboto sa next election or kulang sa tao or experts.

    • @benpung
      @benpung 2 ปีที่แล้ว +3

      @@FACE-PROFILERZ The funds for the creation of a functional waste water system is ingrained in your water bill. However the water utilities did not implement it. The two water concessionaires in Metro Manila is now has waste water treatment plants, however there are still no separate storm and sewer lines...

    • @arkikrist
      @arkikrist 2 ปีที่แล้ว

      agree
      yung perforated maganda yan pag malaki yung lot mo, much better to consult local sanitation code sa lugar. dito sa cebu 3 chamber septic yung minimum requirement para sa residence na di located sa loob ng subdivision.

    • @seanjohn1032
      @seanjohn1032 2 ปีที่แล้ว +3

      eto ung na iisip ko sa first clip ng video, pag maliit lupa mo bawal ka na tlga mag tayo ng bahay na may cr.. hahahaha

  • @ItsLeisure
    @ItsLeisure 2 ปีที่แล้ว +3

    These are the good example the CORRECTIVE FACTORS base upon the real installation situation which are not conformance to IBC code.

  • @vince3vlog229
    @vince3vlog229 2 ปีที่แล้ว +1

    salamat sir sa tip sa video

  • @biklogtv5508
    @biklogtv5508 2 ปีที่แล้ว +2

    Maraming salamat idol sa mga info

  • @ItsLeisure
    @ItsLeisure 2 ปีที่แล้ว +4

    Video clip 2 rebar formworks needs to be at least 3" in high space. We call it Dobbies. Rebars must be at least 3" away from Dirt per IBC.

  • @silentwatcher1455
    @silentwatcher1455 2 ปีที่แล้ว +9

    Good presentation and accurate info.

    • @leirapada926
      @leirapada926 2 ปีที่แล้ว

      Ha good ,alam mba sinsabi mo

    • @teddyteorima4710
      @teddyteorima4710 ปีที่แล้ว

      @@leirapada926 Hindi Po ito dapat na sundin na posonegro may lagusan sa rever dahil pullution Po ito sA iBang ilog katulad Lang nilason nyo Ang mga tao

  • @murxart8323
    @murxart8323 2 ปีที่แล้ว +2

    Good job po. More on reaction videos pa po para maitama yung mga maling practice sa site. Keep it up

  • @helariojaspi3431
    @helariojaspi3431 ปีที่แล้ว +1

    Thank you sir very impormative

  • @ferdinandsagala918
    @ferdinandsagala918 2 ปีที่แล้ว +4

    Mali pati ung location ng links. Nasa ibaba nagsimula ung 5cm. Dapat kung saan nagsimula ung taas ng footing

  • @arveldasugo5166
    @arveldasugo5166 2 ปีที่แล้ว +5

    Tama ang observation ni engineer sa video clip 1 at 2, yung liquid waste galing sa leaching chamber ay pwede lng i tap sa sewer line na kokonekta sa STP or sewage treatment plant..paglabas ng tubig galing sa STP ay malinis na, yung sa video clip 2 additional ko lng ang concrete cover ng foundation ay 75mm..dapat compacted at least 90% passed sa density test pero inaangat namin ang passing percentage to 95% para safe na safe, yung gravel bedding or lean concrete dapat yun ang maauna before maglagay ng bakal..paalala po lamang "LITTLE KNOWLEDGE IS VERY DANGEROUS"

    • @reynaldobaclig6719
      @reynaldobaclig6719 2 ปีที่แล้ว

      Maraming mga karpintero o construction worker ang hindi sumusunod sa standardisation ...gaya na lsng ng septic tank construction.mostly dito sa pilipinas humuhukay lng ng malalim tapos tatakloban lng ng concrete ayos na...kaya ang under water system natin napopolute

    • @yanocaboto
      @yanocaboto ปีที่แล้ว

      Sa video clip #1, normal lng na magtap sa drainage line dahil effluent water na iun. Ang sludge ay naiwan na sa 1st at 2nd chamber which is pinahihigop sa malabanan. Anong sinasabi mo na STP? Meron ka bang nakitang stp sa mga residential areas? Wala db. Ang explanation sa video na ito ay theoretical lang. Iba ang actual application.

  • @trysomeart9111
    @trysomeart9111 2 ปีที่แล้ว +1

    very good informative, fact checker ng mga kamoteng builders

  • @reynoschicote
    @reynoschicote ปีที่แล้ว +1

    thank you sir. iba talaga pag licensed engineer ang magturo matibay ang logica.

  • @raymondomuk4806
    @raymondomuk4806 2 ปีที่แล้ว +5

    Sir sna MA feature nyo. Pwde ba maglagay nang steeldecking Ang isang bahay Lalo na pag ung bahay ay may exsisting na biga.ano po dapat Gawain

  • @akasnam2393
    @akasnam2393 2 ปีที่แล้ว +4

    yong ibang contructor kasi foreman lang walang engr,akalain mo CF nila mali na ang bending,bato pa ang spacer,stirrup malayo ang distance,walang graba sa ilalim diritso na buhos,tie beam 16mm gamit gang poste,yong dulo naman ng tie beam yon bang tagos kung baga sa poste makikita yan if tapos na ang buhos ay 20mm na,para sabihing gamit sa tie beam ay 20mm,sa totoo 16mm lang.

    • @rollyhernandez5762
      @rollyhernandez5762 2 ปีที่แล้ว +1

      Alam nyo kc iba ang expirience ng mfa workers sa kompanya kompara sa mga gumagawa lang ng mga bahay kagaya ng foreman kung mga ex abroad yan cgurado pulido magpatrabaho yan kc sanay na yan na mga engineer at quality control ang nakaka sama kung dto lang sa pinas at mga bahay ang ginagawa medyo kulang pa talaga sa kaalaman

  • @jeanmonsingchannel
    @jeanmonsingchannel 2 ปีที่แล้ว +2

    Thank you for sharing

  • @emzsantillan1207
    @emzsantillan1207 2 ปีที่แล้ว +1

    Thank you for sharing👍Sending my full supports👍😍

  • @budzosana
    @budzosana 2 ปีที่แล้ว +3

    dapat d senesemento ang flooring sir pra d madli mapuno yan ang maling nkasanayan jan s parteng maynila,sabagay pra kumita c malabanan dto s amin s pangasinan walang floring pra masipsip ang tubig at matagal mapuno kht 20 yrs d pa puno ang me flooring baka 5 yrs or 10yrs puno na need na c malabanan f mapuno hehhe

  • @julyparin4432
    @julyparin4432 2 ปีที่แล้ว +4

    Ah sir siguro sa mga buildings or high rise pwede o dapat lagyan ng sewage filter pagkalabas from leaching chamber, pero sa mga subdivisions or house construction diretso ang pipe from leaching to drainage pipe or imbornal. No need for filter dahil nakadesign ang mga drainage pipe to catch waste from every household. Kaya nga may leaching kasi sya na ang sumasala anuman ang lumabas going drainage.

  • @nardcastro9903
    @nardcastro9903 ปีที่แล้ว

    Salamat sir at ibinibigay nyo ang tamang papaparaan sa construction. Malaki maitutulong sa akin lalo na tungkol sa bakal dahil dati akong steelman sa malaking kompanya sa Manila.

  • @JoSimpleWorks
    @JoSimpleWorks 2 ปีที่แล้ว

    Good job sir! Thank you sa pagtutuwid!

  • @silentwatcher1455
    @silentwatcher1455 2 ปีที่แล้ว +4

    You lack one more info on footing. Footing is needed to distribute the load from the column to ground uniformly.

  • @ItsLeisure
    @ItsLeisure 2 ปีที่แล้ว +5

    Any forms of waste contaminated are not applicable to any bypass illegal tap without any jurisdiction authorithy consultation & approval. There must be a certain codes that needs to abide per IBC. Especially the waste contaminated are coming from residentials. Video Clip 1 is the accurate explanation how to secure your own waste management.

    • @eliseorey5174
      @eliseorey5174 2 ปีที่แล้ว +2

      Ang engineer naito marunong lng s papel at drawing pero s aktuwal n pggawa hindi alam .tumigil k na lng iba n ang may experience kesa dun s ngpapaturo pa.

    • @ItsLeisure
      @ItsLeisure 2 ปีที่แล้ว

      @@eliseorey5174 agree

    • @jayveevaldez5795
      @jayveevaldez5795 2 ปีที่แล้ว

      It is true that the efluent must not be tapped towards the public storm drainage system. It should be tapped towards the public sewer system. In the absence of public sewer system, do not attempt to tap your effluent elsewhere. Septic drainfields are no longer encouraged unless you have full monitoring of your GES or the General Effluent Standards setforth by the DENR. The GES should comply the tolerance before discharging towards the septic drainfields. Otherwise, water tables might be contaminated in the process resulting to adverse health conditions of the persons within the certain radius of contamination. Have your sludge be siphoned by an authorized waste water collector by the DENR like your local water service provider in the absence of public sewage collection system.

    • @olimpiaconcepcion3138
      @olimpiaconcepcion3138 2 ปีที่แล้ว +2

      @@eliseorey5174 tama po ang expirience malaking bagay yan sa construction pero ang kaalaman para sa longlife project lalo na sa malalaking construction ay nasa mga engineers ang architect lamang .

    • @shulamgilead5382
      @shulamgilead5382 2 ปีที่แล้ว +1

      How about legalities? Bawat building na tinatayo ay dapat dumadaan sa Munisipyo para sa building permit. Of course they need to submit a blue print pero kung negligent ang kinauukulan at hindi na mag-iinspect, magkakasakit na lang tayo at masisira ang kapaligiran. Ganyan talaga pag 3rd world thinkers...basta basta trabaho.

  • @allviralph52566
    @allviralph52566 2 ปีที่แล้ว +2

    good idea technical quality work.

  • @IGORIDERVLOG
    @IGORIDERVLOG 2 ปีที่แล้ว +1

    thank ulit lods, napaka informative lahat ng video mo.salamat sa pag share

  • @marlonalcantara71
    @marlonalcantara71 2 ปีที่แล้ว +4

    Dapat specified ang depth the filter rock under perforated 4" pipes. Also specified that above the perforated pipes, geotextile should be on the top to gilter the dirt or small particles that may seep down to filter rock and clog them. The space between filter rock must be maintain to allow the gray water to pass. The area or size of leaching gield or you called "private treatnent system" must be compute based on the the natural absorbtion rate of the underneath soil in inches per hour. If the leaching field is too small for the daily waste water discharge of the facility or structure, it will not work and end up over-flowing the septic tank.

  • @jayven8619
    @jayven8619 2 ปีที่แล้ว +7

    Correction, di rin pwede na gumamit ng rebar spacer, mali po yun. Dapat concrete spacer tlga with the same strength ng structural member. Pag rebar, mangangalawang katagalan at papasukin na din ng tubig yung rebars sa loob.

    • @MrFUNKISTAH
      @MrFUNKISTAH 2 ปีที่แล้ว

      wala pa ata experience kulang pa kaalaman, pag pasensyahan nyo na

  • @domeng1231
    @domeng1231 2 ปีที่แล้ว +1

    AJG good job very informative Ang topic mo.

  • @y.e.s.updates668
    @y.e.s.updates668 2 ปีที่แล้ว

    Tnx po for sharing ur knowledge..God bless!

  • @FACE-PROFILERZ
    @FACE-PROFILERZ 2 ปีที่แล้ว +4

    Ok rin yung septic tank idea ng Japan.
    The building roof collects rain water that flushes their toilets.
    Tapos diretso sa septic tank. Tatlo o apat na division ang tank.
    Main, secondary 1 and secondary 2. Tapos dun sa last tank merong Water Lily sa ibabaw harvesting the leaves for the cow to eat.
    Yung ugat ng Water Lily cleans and purifies the water. Naglagay rin sila ng Tilapia to eat the algae.
    Sabi nung engineer/designer pag kinain namin yung Tilapia kumpleto na ang cycle.

    • @allnighterist
      @allnighterist 2 ปีที่แล้ว +1

      May link video po kayo nung system na yan? Mukang Interesting po kasi.

    • @FACE-PROFILERZ
      @FACE-PROFILERZ 2 ปีที่แล้ว

      @@allnighterist Ha'mo research ko yan. Narito kasi ako sa California at nabasa ko yang Japanese architectural designer sa Popular Science Magazine.
      Maganda subukan sa pinas yan kasi malaya tayo on regulation, dito mahigpit.
      Wala kaming septic tank sa lote namin.
      Sa Olongapo where I used to live nakita ko pa nung ginawa yun in the 70s sa bahay namin.

    • @valiantinviato3794
      @valiantinviato3794 2 ปีที่แล้ว +1

      Wooow.. complete cycle na. Food web.. 😁😁

    • @FACE-PROFILERZ
      @FACE-PROFILERZ 2 ปีที่แล้ว

      @@valiantinviato3794 Accordig naman sa Leviticus God commanded us to eat fish na merong palikpik at kaliskis. Dr. Arturo Arboleda (sa youtube) explain why Tilapia and others na merong kaliskis means lumalabas ang pawis nila or toxin sa katawan ng fish.

  • @marvinblogs6747
    @marvinblogs6747 2 ปีที่แล้ว +3

    😀😀Kilala ko po yong mga vlogger na ito boss yong isa me eng. Laging kasama yan ibig sabihin mali sya😀😀😀 yong mga ibang nag cocoment dito iwan😀😀

    • @hazelvlog7150
      @hazelvlog7150 2 ปีที่แล้ว +1

      Tanungin mo c garcia pakita nya septictank nya sa bahay nya mismo kung ganyang sinasabi nya sa vlog nya tingan natin kung kaya nya. Cgurado sa drinage din ang baksak nyan hahaha.

    • @randypedrosa9725
      @randypedrosa9725 2 ปีที่แล้ว

      may iba kasing engineer bro na kahit Mali si foreman tikom nlang ang bibig dhil sa pakisama at ang iba nman minsan malakas magpainom si foreman Kay engineer.. Hahaha

  • @leonilodelosreyes6035
    @leonilodelosreyes6035 2 ปีที่แล้ว +1

    Thank you sir..!

  • @gemdvl6058
    @gemdvl6058 2 ปีที่แล้ว +1

    ang galing mo lods ha iba talaga kung may sapat na knowledge about construction

  • @qtythandle
    @qtythandle 2 ปีที่แล้ว +3

    In theory and principle lang po meron, pero in reality bihira lang po nangyayari yan.

  • @silverjanuary8501
    @silverjanuary8501 2 ปีที่แล้ว +3

    Pgkasabe palang ng 1 inches alam ko ng mali hehehe. Mabuti nacorrect nyo po d2 ang maling idea.

  • @hiddenninja7792
    @hiddenninja7792 2 ปีที่แล้ว

    Salamat Lodi sa construction information.

  • @hazelvlog7150
    @hazelvlog7150 2 ปีที่แล้ว +3

    Unang una merun b tayong mga treatment plant sa pinas? Mag pakita k nga sa mga video mo n ganung cnasabi dyan sa vodeo mo ang ginawa mo naka hangang sa video at salita k lng hind mu naman kaya gawin sa mga project mo. Hihintayin k yan sa content mo kung kaya mo pani dinindigan ang nasa video mo nayan

    • @kadraftsman4374
      @kadraftsman4374 2 ปีที่แล้ว +1

      kya nga sir..prove nya muna bago tyo maniwala.wala nmn masama kung makabuti sa environment ntin..ang problema kasi wala nmn treatment plant ang pilipinas...pagmasdan nya ung mga residential d2 sa pinas...may provided ang residential developer ng sewer drainage pra doon mag tap ang mga lot owner..pero tanungin mo sila saan nila bibagsak ung provided sewer drainage ng boung residential? sa ilog din yan pustahan pa tyo.

    • @alfonzoacoba4938
      @alfonzoacoba4938 2 ปีที่แล้ว

      @@kadraftsman4374 meron Po sa Baguio mahirap gumawa septic tank doon kaya mayroon Sila sewerage treatment plant pipena lng nagkokonect sa inodoro papunta sa planta

    • @hazelvlog7150
      @hazelvlog7150 2 ปีที่แล้ว +1

      @@kadraftsman4374 c aron garcia sa salita lng yan tingnan mo hind maka sagot hahaha. Baka ang bahay nya mismo ganyang design n ginawa n kabayan. Baka sa salita nya lng kayang gawin yan.

  • @fannyandres3056
    @fannyandres3056 2 ปีที่แล้ว +20

    Septic tank is considered primary sewer treatment tank... Like in manila direct to sewer line kasi meron silang sewer line... Sa pag kaka alam ko pasensya ka na... un mga walang sewer line na city combined drainage/sewer line system ang mga iyan, kaya me septic tank rqmt... Meron namang stp na ang rqmt kasi above 10k sq.m. na area ng bldg/struct. Ung mga na una pa na nagawa na sa ibang city meaning mali? hindi ka pa tao nun ginawa un ganun directa sa drainage ang eff.

    • @jubzl8592
      @jubzl8592 2 ปีที่แล้ว +2

      Correct. Dependent siya sa local government din. May sari-sarili silang standard and requirements. Tulad ng nasa video... it appears na walang pwesto para sa gusto mong leaching area and mukhang yan ang code nila sa lgu.

    • @echckaravhotski8092
      @echckaravhotski8092 2 ปีที่แล้ว

      tama

    • @russell383
      @russell383 ปีที่แล้ว

      @@jubzl8592 yung nasa video pang malakihang lote, e pano yung maliit lng space, tama po kayo

    • @freyakhal8796
      @freyakhal8796 ปีที่แล้ว +2

      Kaya nga pinalala nyo ang polusyon sa manila hnd pa nga sya pinanganak nun pero mas tama ang planning nya kayo kasi hnd nyo iniisip na sinisira nyo kalikasan lalo kakatawa ka.

    • @buildexvlog6920
      @buildexvlog6920 ปีที่แล้ว

      ​@@freyakhal8796 I agree kaya dito sa taiwan pati canal dito andaming Tilapia kasi sumusunod sila sa tamang pagdisposed ng dumi.

  • @yuekadere
    @yuekadere 2 ปีที่แล้ว +1

    good idea informative & educational...

  • @KaVinceTV
    @KaVinceTV 2 ปีที่แล้ว +2

    Maraming salamat sir madami n nmn ako natutunan tungkol sa constraction

  • @EvendimataE
    @EvendimataE 2 ปีที่แล้ว +6

    ANG PROBLEMA KSE MADAMING CONSTRUCTION WORKERS SA PINAS SA EXPERIENCE LANG NA TUTO...MAS MAGANDA MAY FORMAL SCHOOLING PARA TAMA TALAGA ANG MA TUTUTUNAN...SA AMERICA AT CANADA MAY TINATAWAG SILANG APPRENTICESHIP PROGRAM....HABANG NAG WWORK KA MAY TIME NA PAPASOK KA SA SCHOOL...EVERY YEAR TATAAS KA NG ISANG STEP..SYEMPRE TATAAS DIN ANG SWELDO AT MAG LLEVEL UP ANG TRAINING....KARANIWAN 4 YRS SA PLUMBER, ELECTRICIAN , CARPETENTERS ETC....YUNG IBA NAMAN 2 YRS LANG TULAD NG PINTOR AT BRICK LAYERS....KAYA PAG MAY LISENSYA NA SYEMPRE BIGATIN NA....DEPENDE KUNG ANONG TRADE PERO KADALASAN MGA 2X OR 3X NG MINIMUM ANG SWELDO

    • @glenpox1
      @glenpox1 2 ปีที่แล้ว +1

      Sir my point ka po pero in reality d2 sa pinas di mu talaga pwd ikumpara ang apol sa aratilis...unang una para sa ating mga karaniwang kapatid na construction worker moslty di sila qualified sa ibang trabaho dahil kadalasan atleast college level ang hinahanap karamihan sa kanila di nakapag tapos kung gagastos mn sila pam paaral ay para nlang sa anak nila, pangalawa di lahat ng nagpagawa ng bahay ay maka afford sa mga professional fees ng engr at architect minsan ang may ari pa mismo ang mag suggest na gawan mu nalang ng paaraan para makatipid.

    • @PABLOESCOBAR-vz3sz
      @PABLOESCOBAR-vz3sz 2 ปีที่แล้ว

      @@glenpox1 tama

    • @dengplenos7958
      @dengplenos7958 ปีที่แล้ว

      Meron naman po tlaga dati pa civil eng tech or civil tech sa mga tech schools like tup

    • @ivyprado130
      @ivyprado130 7 หลายเดือนก่อน

      hirap sating mga pinoy..mahilig ikumpara tayu sa ibang bansa..pinulaan mo pa mga workers ng pinas..taga pokpok at taga pala .kuha kp ng lesensya..hahajaja..ikotin mo boung pinas.ganayan.puso negro..yan ganyan na sabi mo..don mo daihin sa mga bansa na inakumpara mo sa pinas.

  • @AA-ridertech
    @AA-ridertech 2 ปีที่แล้ว +1

    Salamat po sir...Malaking 2lung ito sa amin god bless

  • @jaymanaloto2067
    @jaymanaloto2067 2 ปีที่แล้ว +2

    More power engr.happy new year sayo.

  • @JUNLIRAYCREATIONS
    @JUNLIRAYCREATIONS 2 ปีที่แล้ว +2

    great descussion sir.⭐⭐⭐⭐⭐

  • @kabangka
    @kabangka 2 ปีที่แล้ว +1

    sakto idol... salamat for correcting some mistake of construction workers sa pagawa ng mga septic tank...