CY ZJ10 Rail-less shingle roof mounting Racking system from Cy Solar Mounting

แชร์
ฝัง
  • เผยแพร่เมื่อ 23 ก.ค. 2015
  • With two parts only, flashing plate, and clamps,pre-assembled at factory.Easy to be installed, special clamps are adjustable, with high and low height adjustable, and back and front distance adjustable,make the total system keep one balance, the same level.

ความคิดเห็น • 9

  • @patriciamariemitchel
    @patriciamariemitchel 3 ปีที่แล้ว

    Nice to have all across even shingles to work with.😳

  • @junkvista61
    @junkvista61 ปีที่แล้ว

    It's much more appreciated if instead of music you tell us what to pay attention at each crew action. And the link to products is needed. People who watch this type of subject do not need music, they need information and how to do thing correctly.

  • @newmanew
    @newmanew 5 ปีที่แล้ว +1

    Good thing they wore hard hats indoors. Think how much better the PV system would work if they connected the wiring.

  • @beingatrainer7822
    @beingatrainer7822 5 ปีที่แล้ว

    good team work, appreciated
    .

  • @israndy
    @israndy 4 ปีที่แล้ว

    Nobody even commented on the clock continuing to run at normal speed while the workers were jumping from place to place and filmed at high-speed?

  • @adamgruber2342
    @adamgruber2342 5 ปีที่แล้ว +1

    Except roofs are outside ,u can’t just pick the shingle up..rookies..false hope

  • @joshfal6488
    @joshfal6488 5 ปีที่แล้ว +1

    I wish my roof had a floor to stand on while installing that 1st row. So many mistakes with your clock and editing. Notice scene changes at 2:11, 2:52, and 4:01. There is no way this was installed in 6 minutes. Great concept but you lose credibility when you use a video that proves deception.

  • @tracychen3518
    @tracychen3518  8 ปีที่แล้ว

    tracy@cy-solar.com