    Is video me maine floor k liye mitti acha hain ya phir sand acha hain wo discuss kiya hain with fact....Video pura zaroor dekhna ..Thank you Guys❤️

ความคิดเห็น • 69

  • @jasvirkumar5817
    @jasvirkumar5817 3 ปีที่แล้ว +12

    you are the first and only person in the world who is recommending soil.

  • @anubhabnath8340
    @anubhabnath8340 ปีที่แล้ว +2

    Sir app bahat bade engineer hai (salam apko😅😅)👍👍👍

  • @snehal50samarpit
    @snehal50samarpit 2 ปีที่แล้ว +1

    Agar foundation pit me water pond bana kar usme crusher dust daala jaye to automatic compaction hoga?

  • @chhayasahu9757
    @chhayasahu9757 2 ปีที่แล้ว +1

    Sir columns k pits me stone dust daalna thik rahega ya murum

  • @Sonuans1900
    @Sonuans1900 2 ปีที่แล้ว +1

    stone dust vs river sand which is the good for backfilling?

  • @aliameen9023
    @aliameen9023 3 ปีที่แล้ว +1

    8 feet soil fill ker di .. layer by layer compact hi ki...ab kesy compact ho gi ...us me bara bara dheeela b ha
    Ab kia keron plz reply jaroor kerna

  • @nitinw125
    @nitinw125 3 ปีที่แล้ว +6

    After earth filling in plinth is rcc required to be done before laying tiles.

    • @UttuSrkTv
      @UttuSrkTv  3 ปีที่แล้ว +1

      No, it is not mandatory....if the soil is very loose then u can provide rcc for floor

  • @kaushikagt9006
    @kaushikagt9006 3 ปีที่แล้ว +1

    Do u know were can i get sand at lowest price. I stay in badarghat,Agartala

  • @sajujacob4350
    @sajujacob4350 3 ปีที่แล้ว +1

    can you tell me number of trucks required to fill a 1 acre land to 2 metres high, I'm in kerala

  • @RAAZTHEBAND1
    @RAAZTHEBAND1 3 ปีที่แล้ว +1

    Mery plot me to 7 feet tak soil fill ker di ha layer by layer compact kia hi nhi...ab kia keron is galati ko kesy sudharon
    Plz answere

  • @TheZintu
    @TheZintu 3 ปีที่แล้ว +1

    sir ji...sand ki jagah stone dust use kar sakte hai agar termites se bachana ho to?

  • @nagabalaram2197
    @nagabalaram2197 3 ปีที่แล้ว

    Dear sir Good morning
    Our new house construction mayy our father fill all colums of room fill black soil it full water p
    so kindly give your suggestion for we go with marble or simply like this only

  • @shashikanthshirke7531
    @shashikanthshirke7531 4 ปีที่แล้ว +1

    Which type earth soil. Black soil is good?

  • @nabinrawat2991
    @nabinrawat2991 4 ปีที่แล้ว

    Near by my house. Underground water tank is being built by digging inside ground floor room. The worker dug very near to edges of sides of room. After raising up the water tank bricklayer. Now while backfilling while compacting while putting water for compaction for every 1 feet the stones from stone layers of that house beneath plinth beam are falling due to water what should be done in that case? Should we put water or not while compacting?

  • @kumarprayash9867
    @kumarprayash9867 4 ปีที่แล้ว +1

    Sir ,kya cc road & interlocking tiles road me 0 .55 mtr depth me sand filling karana sahi hai ?

  • @kritikasingh1848
    @kritikasingh1848 3 ปีที่แล้ว +1

    Hello sir, mera ghar ban rha hai, us area me construction k samai kuch portion me pani bhara tha(daldal type se), footing ho gya hai, and plinth beam k lye 5' ht tak brickwork bhi ho gya hai, to aise area me filling sand se phle karna hai ya soil, aur kitne proportion me sand and soil filling kare, kuch logo ka yeh bhi kahna hai ki sand filling jada krna hai usse chuhe ni aate hai, please reply

    • @UttuSrkTv
      @UttuSrkTv  3 ปีที่แล้ว

      Pehle sand daalke daldal ko dry kijiye, uske baad mitti daal k compaction kijiye, upar ke 1 ft height se jyda sand nhi hona chahiye

  • @bhuwankantbhatti5053
    @bhuwankantbhatti5053 3 ปีที่แล้ว

    Contractor Chikni mitti Gira gya in the backfill. What will be the problems ? What are the solutions ?

  • @srimantabanerjee452
    @srimantabanerjee452 3 ปีที่แล้ว +1

    Soil er bodole Slag ba Ash filling kore opore 6 inch Bali dile kono problem achhe? Ektu janale upokrito hotam..🙏

    • @UttuSrkTv
      @UttuSrkTv  3 ปีที่แล้ว

      Exactly bolte parbona...bt ami jatdur jani ash to aste aste decompose hoye kome jabe...tate dhalai er khoti hote pare.....soil use kara e best ...

  • @venkataramanna4931
    @venkataramanna4931 3 ปีที่แล้ว +1

    Sir I don't know hindi
    Which one best river sand or red sand best for building

    • @UttuSrkTv
      @UttuSrkTv  3 ปีที่แล้ว

      White sand is the best one

    • @shankerrai795
      @shankerrai795 2 ปีที่แล้ว

      River sand.

  • @ketannirwan5253
    @ketannirwan5253 4 ปีที่แล้ว +1

    I saw somewhere that the owner is filling baloo or morang river sand to do filling and he is saying that if you have basement room in your house its mandatory to do so as rain water will not come to that portion and saying earth sand or mitti will not settle as properly as morang or river sand do

  • @shubham_3699
    @shubham_3699 3 ปีที่แล้ว

    01. Khet ki mitti / 02. River ki mitti / 03. Stone crasher ki mitti ???? inme se bhraan ke liye kya shai rahta hai ????

  • @yameshwerprasadvishwakarma2607
    @yameshwerprasadvishwakarma2607 4 ปีที่แล้ว +1

    Sir maine apne ghar pr 100% sand use kiya hai abhi casting kare ya kuch aur

  • @mrinalkanti1946
    @mrinalkanti1946 4 ปีที่แล้ว +1

    Dada,
    Three story building er footing:
    1.Brick soling
    2. 5 inches RCC above brick.
    3. Then 8 inches RCC with double rod footing.
    4. Then Taper 6 inches.
    5. Taper top to below tie beam is 5 ft high. Tie beam PL e deoya.
    GL to PL 3 ft.
    GL pore 2 ft high kora hobe.
    Tahole, Tiebeam er height footing er top theke 5 ft kora ta kono mistake holo?
    Pls reply.

    • @UttuSrkTv
      @UttuSrkTv  4 ปีที่แล้ว +1

      That means only plinth beam provide kara hoyeche....underground kono beam provide kara hoyni......kara uchit chilo......earthquake load resistance er jonno underground beam(tie beam) khub important....

    • @mrinalkanti1946
      @mrinalkanti1946 4 ปีที่แล้ว

      @@UttuSrkTv Thank you Dada.
      Amar o tai doubt chilo.
      Tai taper er opore tie beam porjonto brick work er niche 125 er halka rcc dilam.

  • @mrajani6962
    @mrajani6962 2 ปีที่แล้ว

    Sir i need to fill 1000 sq ft area upto 5 feets height from ground level. Kindly suggest which material will be the best for said purpose please help. Lots of thanks to you sir.

  • @saqibsubhan8065
    @saqibsubhan8065 4 ปีที่แล้ว +2

    Can we use 40mm metal in the place of 4inch pcc

    • @UttuSrkTv
      @UttuSrkTv  4 ปีที่แล้ว

      Yes u can use...

  • @NandDDan
    @NandDDan 5 ปีที่แล้ว +1

    Sir kya stone ke dust se filling karna thik rahega.

    • @UttuSrkTv
      @UttuSrkTv  5 ปีที่แล้ว +1

      Yess..u can do it..

  • @elviralacerda2671
    @elviralacerda2671 4 ปีที่แล้ว +1

    Thanks for the informative video! Kindly advise as to why sand filling is required

    • @ranjibborah3274
      @ranjibborah3274 3 ปีที่แล้ว

      Last 9 inch Sand filling is required to stop breeding of white ant as this insect cannot make their house in sand.

  • @sanjeevrawat1831
    @sanjeevrawat1831 4 ปีที่แล้ว

    Mitti nhi mil rahi ho to ret ka prayog Karene ya ya FIR makan ke tuta hua West material ka prayog Foundation mein karo kripya jankari de

  • @milanpati4885
    @milanpati4885 3 ปีที่แล้ว

    sir mugha mistry bola well ka le a 1;6. recatio. please reply to me

    • @UttuSrkTv
      @UttuSrkTv  3 ปีที่แล้ว

      1 : 4

    • @milanpati4885
      @milanpati4885 3 ปีที่แล้ว

      @@UttuSrkTv sir i contact with you

  • @rajarshiray4760
    @rajarshiray4760 5 ปีที่แล้ว +1

    amader contractor ekebare 3 foot mati fele die6e, or upore 1 inch sada bali fele6e, er por ekebare jol die bosabe bol6e, thik thak hbe tate ??

    • @UttuSrkTv
      @UttuSrkTv  5 ปีที่แล้ว

      1 inch bali safe na....minimum 6 inch bali dite bolo...

    • @rajarshiray4760
      @rajarshiray4760 5 ปีที่แล้ว

      ok, bolbo.. thanks... r o ki6u qs janar thakle ekhane ask korbo pore..

    • @UttuSrkTv
      @UttuSrkTv  5 ปีที่แล้ว +1

      @@rajarshiray4760 sure..

    • @rajarshiray4760
      @rajarshiray4760 5 ปีที่แล้ว

      2 tola bari r khetre rrc coloumn, tie beam,roof e koto grade e casting kora uchit ?

    • @UttuSrkTv
      @UttuSrkTv  5 ปีที่แล้ว

      @@rajarshiray4760 M20 grade, mane 1:1.5:3 ratio

  • @rumkighosh168
    @rumkighosh168 4 ปีที่แล้ว +1

    What about fly ash filling instead of soil

  • @abdulmuqsit9786
    @abdulmuqsit9786 3 ปีที่แล้ว

    Mujhey bas apse kuch advice chaiye

  • @venkataramanna4931
    @venkataramanna4931 3 ปีที่แล้ว

    I don't know hindi
    Which one is best sand or soil filling

    • @UttuSrkTv
      @UttuSrkTv  3 ปีที่แล้ว +1

      Soil ....bt u need to compact the soil properly making layers.....fill soil at 1 feet height & then compact thoroughly....repeat the process upto plinth level....Hope i could make u understand my point...

  • @enagandulasagar2333
    @enagandulasagar2333 3 ปีที่แล้ว

    Which is best sand or mitti

  • @anupravadatta3247
    @anupravadatta3247 4 ปีที่แล้ว

    my contractor saying use sand filling completely and said can’t use soil also here other people always use rough sand for filling completely.i don’t have any idea about civil engineering so I never know the fact please reply me that what should I do

    • @UttuSrkTv
      @UttuSrkTv  4 ปีที่แล้ว +1

      Fill with soil & compact well layer by layer...fill 1 feet soil ,compact very well & then again fill soil & repeat the steps......sand filling should not be more than 6 inch thick..

  • @ramashankarsaroj5677
    @ramashankarsaroj5677 ปีที่แล้ว

    कुछ लोग कहते हैं कि पूरा ही सेंड सीलिंग करो क्या यह सही है

  • @invinciblehero122
    @invinciblehero122 4 ปีที่แล้ว

    I have got soil filling about 4 feet hight from ground level and one foot layer of soil has been compacted upon filling ...now contractor is saying to fill sand to cover 5 inch and then brick ballast will be used

  • @ramashankarsaroj5677
    @ramashankarsaroj5677 ปีที่แล้ว

    Good.

  • @musarratkhan1920
    @musarratkhan1920 4 ปีที่แล้ว

    But my contractor has told to fill 50 percent sand

  • @anubhabnath8340
    @anubhabnath8340 ปีที่แล้ว

    You are recommended soil😂😂

  • @Nikhil-z9y
    @Nikhil-z9y 2 ปีที่แล้ว

    Contractor has asked for complete sand filling

  • @abdulmuqsit9786
    @abdulmuqsit9786 3 ปีที่แล้ว

    Bhai ap mujhsey baat kar saktey ho call mein 10 se 15 minute tak

  • @ksnegi7849
    @ksnegi7849 ปีที่แล้ว

    RBM

  • @abdulmuqsit9786
    @abdulmuqsit9786 3 ปีที่แล้ว

    Ap apna number do mujhey or ap kab free ho tab bolna me apko call karunga