WES Installation at 160 Front Street, Toronto

แชร์
ฝัง
  • เผยแพร่เมื่อ 27 ม.ค. 2022
  • James Pecz joined the contractor PCL Construction to install the WES3 wireless evacuation system at a premiere address in Toronto’s Financial District, 160 Front Street West, which is a 46-story structural steel-framed commercial office tower that is slated for completion in late 2023.
    A major benefit of the WES3 is how scalable the system is, so even large projects like this can be protected without a problem. Having a solution that is both time and cost effective has never been more important, and when it comes to safety there can be no compromise.
    Learn more:ramtechglobal....

ความคิดเห็น •