Communication Schemes in Distance Protection DUTT & PUTT | Permissive Under Reach Transfer Trip

แชร์
ฝัง
  • เผยแพร่เมื่อ 28 พ.ย. 2024

ความคิดเห็น • 16

  • @karuppusamy3883
    @karuppusamy3883 6 หลายเดือนก่อน +1

    bro please explain red 670 abb relay full configuration

  • @khajamian9190
    @khajamian9190 ปีที่แล้ว +1

    Good evening brother, in case reverse zone fault , due to CT error , if sub Y assume the fault as zone 1, it's already tripping substation Y.. substation X is prevented by zone 2 pick up verification..how to safe substation Y from tripping Incase of CT error

    • @baranitechtamil
      @baranitechtamil  10 หลายเดือนก่อน

      if the fault current is high even CT malu operated but still voltage drop occurs and it will trip by voltage protection too. but fault isolation time will be high

  • @Eng853
    @Eng853 4 ปีที่แล้ว +1

    Anna,Auto reclosure&Pole discrepancy timing and their coordination pathi sollunga.

  • @Praveenkumar-rq9dj
    @Praveenkumar-rq9dj 4 ปีที่แล้ว +1

    Super sir

  • @saravananmohan3438
    @saravananmohan3438 4 ปีที่แล้ว +1

    Bro directional over current and earth fault relay videos podunga

  • @balakabimuki2023
    @balakabimuki2023 ปีที่แล้ว

    What is direct trip send, receive??? How this scheme working???

  • @dhaneshv5446
    @dhaneshv5446 4 ปีที่แล้ว +1

    Mutual compensation solunga bro

  • @RaviKumar-kk2by
    @RaviKumar-kk2by 3 ปีที่แล้ว +1

    What is the difference between PUTT and POTT where we will use this application bro

    • @baranitechtamil
      @baranitechtamil  3 ปีที่แล้ว

      only different is permissible check for U - it considered zone-1 pickup and for O it considered zone-2 pickup