- Diaphragm wall construction is very crucial for modern super structures like residential and commercial complexes with basements. These reinforced concrete walls provide the much required underground support and stability to the structure.
DIAPHRAGM WALL ANCHORING (Part-2) ┃ऐसा बेसमेंट दीवार का काम पहले नही देखा होगा ┃Anchor grouting & Stressing
In diaphragm wall construction, ground anchor bolts are used in order to link the structural and non-structural elements of the D-wall to the concrete. The process of casting these anchors into the diaphragm wall is known as Anchoring.
It involves anchor bolts, steel plates, sleeves and stiffeners to form the anchor on the diaphragm wall.
Anchoring ensures that these diaphragm walls are sturdy enough to keep these structures intact. Anchoring is one of the most important aspects of diaphragm wall construction.
Anchoring assists in transferring the tension and shear forces between these structural elements and provide lateral support to the diaphragm wall to sustain force from the top.
If anchoring is not done by diaphragm wall construction companies, then they have to increase the depth of the wall into the ground to almost double the size required.
Constructing a diaphragm wall without anchoring increases the cost of labor, the amount of concrete and steel used in the process, thus adding to the cost of the project.
In diaphragm wall construction, ground anchor bolts are used in order to link the structural and non-structural elements of the D-wall to the concrete.
The process of casting these anchors into the diaphragm wall is known as Anchoring. The Anchoring activity begins 7 days after the diaphragm wall panels are cast.
Anchoring process:
Anchoring is done post casting of the diaphragm wall. There are multiple levels of anchoring, with one anchor level in every basement. When the diaphragm wall cages are made, there are slots left open in equal distance on them. They are called anchoring sleeves. The distance maintained between them is ideally 5 meters. But the depth can be increased, given the quality of the soil the diaphragm wall construction companies are dealing with.
A drill rig is used to drill boreholes of 150 to 180 mm, at 15 to 30 degrees and the anchor tendon is put into the hole in the center. Upon completion of boring, the borehole is cleaned through compressed air. A low relaxation prestressed steel (LRPC) strand is inserted into the bore and the anchor is grouted.
The anchor head is then pre-tensioned by jacking after 7 to 10 days, and the anchor heads are set in place. The anchor is later distressed after the slab casting is done.
Equipments:
Equipments used are the advanced anchoring rigs, Casagrande C6, can drill up to 8 inches instead of the regular 6 inches, 4 of them, Long Boom Excavators, Conventional Anchoring Rigs.
Diaphragm wall construction polavaram Foundation Engineering
Diaphragm wall
Diaphragm wall steel
Diaphragm wall bbs
Diaphragm wall construction method statement
Diaphragm wall construction machine
Diaphragm wall construction process
Diaphragm wall construction steps
Diaphragm wall construction methodology
Diaphragm wall construction
Diaphragm wall ka construction in India
Diaphragm wall construction polavaram
Diaphragm wall excavation
Diaphragm wall waterproofing
New Advance construction technique and machinery
basement construction
Excavation of trench
Guide wall construction
Wall Concreting
Steel cage
Rolling Cover block
Congested area
Bentonite slurry and polymer mud
Clamshell machine
Grab machine
Retaining wall construction in basements
Construction Joint
anchor fasting in diaphragm wall
anchoring and prestressing
diaphragm wall post behavioural analysis
a concrete diaphragm wall
Top Most Video Playlist
1. DIAPHRAGM WALL CONSTRUCTION (Part-1)│ Execution on site│Advance Construction Technique & Machinery
• DIAPHRAGM WALL CONSTRU...
2. Waterproofing│पानी को अंदर घुसने न देनेवाला बेसमेंट वाटरप्रूफिंग│Basement waterproofing and its Types
• Waterproofing🚱 पानी को...
3. Rebaring work in concrete│On site methodology & costing│Epoxy chem. grouting│HILTI, FISCHER, RODFIX
• Rebaring work in concr...
4. Staircase Design and Construction │Minimum Space Required for Staircase │सीढ़ी बनाने का तरीका
• Rebaring work in concr...
#diaphragmwall #anchoring #skillcivilseries #construction #practicalknowledge #grouting #stressing #basement #anchorstressing #anchorgrouting #analysis #advanceconstructionmachinery #foundation engineering #sheet pile #retainingwall #concrete #learning #freshers #site execution #construction #basement construction #wallexcavation #wall #retainingwall construction #diaphragmwallconstructionsteps #retainingwallconstruction #viralvideo #viralshorts #cost #newtechnology #education #educational #gate2022 #ies #students #civilservices #civilengineer
Superb video. Make more videos of this type👍
Good Informative video❤❤
Very good information 👌
Knowledgeable video of anchoring. Keep it up
kudos! to you. Video is full of practical and technical information. must watch
Informative and Knowledgeable video
Very good
Most Information To Useful
Very useful information
Very informative and practical video
Good👍👍👍
Nice
Pritam kya krr Raha hai last me 😂
Isme kitna percentage profits ka business he ye sir?
Rate per metre
How much cost
please share cost analysis of anchoring
Sir anchor testing machine contractor deta h ya company k trf s dena hota h
Generally this serviced is provided by contractor itself otherwise as per contract
@@skillcivil182 ok sir
Sir how to calculate weight of strands
swedwire.se/en/products/steel-strand-calculator/
You can simply follow this on site to calculate weight of strand.
sorry for late reply.
Very nice information 👍👌👌👌👌👌