Consolidation: drained vs. undrained conditions.

แชร์
ฝัง
  • เผยแพร่เมื่อ 8 ต.ค. 2024

ความคิดเห็น • 16

  • @jhzsoaking
    @jhzsoaking ปีที่แล้ว +3

    This video was thorough and easy to follow and understand. Thank you very very much!

  • @twigsfloat2773
    @twigsfloat2773 2 ปีที่แล้ว +5

    I'm glad I came across this. I wish more Professors would take the time to actually slow down and explain this stuff. Maybe the ABET accreditation forces them to fit so much into their courses that they feel they don't have the time to explain anything very well. Great job, will definitely look up more from your channel.

  • @masterblake9
    @masterblake9 ปีที่แล้ว +1

    The syringe example really help me to understand. Thank you!

  • @labonigupta5085
    @labonigupta5085 4 หลายเดือนก่อน +1

    Awesome explanation

  • @praveenkrsahu6355
    @praveenkrsahu6355 3 ปีที่แล้ว +2

    Great work... Hats off...

  • @katherinecastle4135
    @katherinecastle4135 ปีที่แล้ว +1

    Very good explanation!

  • @Peter-bw5fr
    @Peter-bw5fr 5 หลายเดือนก่อน +1

    good sir

  • @matiullahkhan3804
    @matiullahkhan3804 2 ปีที่แล้ว +1

    Great .more geotechnical videos plz

  • @SL-uz5mi
    @SL-uz5mi 4 ปีที่แล้ว +1

    great explanation.thx for the vid

  • @matiullahkhan3804
    @matiullahkhan3804 2 ปีที่แล้ว +1

    What a music at the end..wawoo

    • @julitovaldes
      @julitovaldes  ปีที่แล้ว

      thank you! open.spotify.com/artist/3mxcteCYzahUw3PlwMqCTu

  • @abdullahhussein6568
    @abdullahhussein6568 ปีที่แล้ว

    How can we do conceptual sketches for over consolidation and under consolidated

    • @juliovaldes1416
      @juliovaldes1416 ปีที่แล้ว +2

      Overconsolidation: draw a "before soil removal" profile. It is 10m-thick with a point located at depth z = 4m, i.e., 6m above the bedrock. Then draw an "after soil removal" profile. It is 8m-thick because the top 2m of soil have been removed. The point is still 6m above the bedrock, but only 2m below the new ground surface.
      Underconsolidation: draw a transparent bucket full of water, with clay particles in the process of sedimenting inside.

    • @abdullahhussein6568
      @abdullahhussein6568 ปีที่แล้ว

      Could you please help me with that, I have a manuscript and they need me to add these two conceptual sketches@@juliovaldes1416

  • @qaimshah7936
    @qaimshah7936 3 ปีที่แล้ว +1

    sir can you please provide the slides