IS 456:Code explanation with amendment, IS 456:2000 specification for formwork or shuttering

แชร์
ฝัง
  • เผยแพร่เมื่อ 24 ธ.ค. 2024
  • In this lecture we learn in Hindi and English that what is the basic difference between formwork, Shuttering, Centering, Staging and scaffolding. According to IS-456:2000 Maximum Tolerance in formwork/Shuttering with fourth amendment. Kisi bhi structural element ka formwork kitne din tak rakhna chahiye Beam ka formwork ya shuttering kab tak rakhna chahiye,Column ka formwork ya shuttering kab tak rakhna chahiye, slab ka form work ya shuttering kab tak rakhna chahiye,
    IS Code Lecture Series
    Lecture-3
    Deflection control of beam
    Link:- • IS Code 456:2000 Speci...
    Lecture-2
    Beam
    Link:- • IS 456:2000 Code Speci...
    Lecture-1
    Column
    Link:- • IS 456 Code explainati...

ความคิดเห็น • 17