Prepping for concrete 69

แชร์
ฝัง
  • เผยแพร่เมื่อ 14 ต.ค. 2024
  • This is a time lapse video, where trenches are dug for the high voltage, low voltage, water and sewer lines. And those are installed, mostly, and reburied, mostly. The real headache was pounding eight foot long grounding rods into the undisturbed clay. That completely wore us out, but they are both fully inserted and a #4 ground wire run. This is for a new shop that I will have built by Morton Buildings.
    Day 38ish of build, video 1 of 2

ความคิดเห็น •