Building in Ghana |First Floor Block Work Stage Two | Ep-38

แชร์
ฝัง
  • เผยแพร่เมื่อ 27 ต.ค. 2024
  • Please do NOT contact Steven ( Mason ) for Any masonry Work. || Steven is NO Longer with us ||

ความคิดเห็น • 20

  • @thequarshies753
    @thequarshies753 2 ปีที่แล้ว

    Thanks for sharing our story on your channel, we really appreciate you for the great work you're doing 🙏 .

    • @BrightandClara
      @BrightandClara  2 ปีที่แล้ว +1

      Kindness is my nature, helping you grow won't cost me a thing.....youre success is my desire......you've made it sir.....you and your family have worked hard and sacrificed soo much to reach this stage of your build. Congratulations 🎊.
      Shalom.
      Mr. Bright

    • @thequarshies753
      @thequarshies753 2 ปีที่แล้ว

      @@BrightandClara Thanks.

  • @Rosphil76
    @Rosphil76 2 ปีที่แล้ว

    You can do it brother you are already there to the top.

    • @BrightandClara
      @BrightandClara  2 ปีที่แล้ว

      Thanks alot madam....welcome back, its been a while....hope all is well with you.
      Thanks for watching

    • @Rosphil76
      @Rosphil76 2 ปีที่แล้ว

      @@BrightandClara is work this few weeks has been busy busy busy coz of Covid-19 infection rate rising again.

  • @proyouservicesltd3652
    @proyouservicesltd3652 2 ปีที่แล้ว

    Another great video.

  • @josephahiable5602
    @josephahiable5602 2 ปีที่แล้ว +1

    Thanks for sharing, mr Bright which one is the best way to save money is it by going for by day or giving it to the Mason as a contract from Block lying to roofing please. Because I did mine and to me I think I paid too much on my block work to the roofing. I paid ghc27,000 just to the Mason. Can't wait to see how much yours will be. Thanks so much Mr bright. Stay bless Shalom.

    • @BrightandClara
      @BrightandClara  2 ปีที่แล้ว +1

      Hmm Ghc 27,000 for just block work. I think it includes casting of the pillars and lentil as too, but even that, is too much....You should have reached out to me first. But nonetheless, let see how mine will end.

    • @josephahiable5602
      @josephahiable5602 2 ปีที่แล้ว

      @@BrightandClara yeah watching your channel and other channels you recommended has been eye opening for me a lot. Yes the ghc27,000 was to the block work, pillars, lentil and the 4 block work before roofing. Now am at my roofing stage and the estimate is another thing.

    • @BrightandClara
      @BrightandClara  2 ปีที่แล้ว

      @@josephahiable5602 let's link, for together we stand. We will guide each other. Please send me your contact details via email brightanthonio@outlook.com

  • @360residency9
    @360residency9 2 ปีที่แล้ว

    Hello brother, where did you buy your blocks for 4 cedis and did you buy it recently? Thanks 🙏🏽

  • @nanasiaw5944
    @nanasiaw5944 2 ปีที่แล้ว

    Hi Mr. Anthonio, where did you buy blocks recently for 4 Gh?

    • @BrightandClara
      @BrightandClara  2 ปีที่แล้ว

      Thanks for watching madam. Sometimes in April 16th 2022, that's when I bought the blocks. Price keeps changing tho.

  • @nighttrain6834
    @nighttrain6834 2 ปีที่แล้ว

    4ghc block ??? Bro hook me up.
    80ghc /day labor is a bit on the lower side of labor wages. Looks like your folks are low balling the laborers. Yes I get it, you want to save on cost, but please a befitting wage for these guys shouldn’t cost you an arm. Imagine having to carry 700 blocks for 80ghc? SMH
    The structure is coming along beautifully and I like your floor flooding remedies. It’s been brutal with these rains.
    Salute son!!!

    • @repteeclinton5414
      @repteeclinton5414 2 ปีที่แล้ว

      Bro you can add some of the money to them errrrrrr
      Ebi his budget and the guys too accepted
      After all the guys are not complaining oooo you are complaining boss chill kk

    • @BrightandClara
      @BrightandClara  2 ปีที่แล้ว +1

      Thanks for watching. Workmanship for labourers varies from where your construction is taking place.
      With regards to parking the blocks, mostly they charge 0.20 pecewes to 30 pecewes per block.
      In my case I had two labourers working with two masons....hence they only charged me an additional Ghc 80 cedis because of the height....if this was the ground floor, I didn't have to pay them.

    • @nighttrain6834
      @nighttrain6834 2 ปีที่แล้ว

      Awesome!! Thanks for the clarification. 👌🏾