Thanks a lot for the informative webinar. I'd like to ask: what is meant by 'apportionment ratio' mentioned in an answer on a question about optimized operating parameters in CMOST.
Thank you for your question. Apportionment ratio refers to the ratio of the assigned water injection rate between two injector wells. For instance, suppose we have 2000 m3/day of water available, and we decide to implement an apportionment ratio of 1 to 3 between injector 1 and injector 2. This means that the injection rate of injector 2 will be three times higher than that of injector 1. Injector 2: 1500 m3/day Injector 1: 500 m3/day I hope this clarifies your inquiry.
Thanks a lot for the informative webinar. I'd like to ask: what is meant by 'apportionment ratio' mentioned in an answer on a question about optimized operating parameters in CMOST.
Thank you for your question.
Apportionment ratio refers to the ratio of the assigned water injection rate between two injector wells. For instance, suppose we have 2000 m3/day of water available, and we decide to implement an apportionment ratio of 1 to 3 between injector 1 and injector 2. This means that the injection rate of injector 2 will be three times higher than that of injector 1.
Injector 2: 1500 m3/day
Injector 1: 500 m3/day
I hope this clarifies your inquiry.