ขนาดวิดีโอ: 1280 X 720853 X 480640 X 360
แสดงแผงควบคุมโปรแกรมเล่น
เล่นอัตโนมัติ
เล่นใหม่
What a very informative video, every detail 💯
Where does that pipe for recycled water go or connected
Great video, thanks
2:50 is that pipe left open or where does it go thereafter?
Outside of the roof where you can see it
Best video ive seen so far ao easy to understand should i use copper piping or poly pipe as this is cheaper let me know thanks Trev
thank you do you also have solar geyser install
wow! clean & clea video tnx from S.A
First good video I've found! Thanks!Is this up to date for all current regulations?
The prv is situated outside the tray. The hot outlet does not come up and over the geyser, the vacuum breaker is outside the tray.
When the thermostat is connected, is it necessary to turn it of and then set it to the required temperature? Just to make sure it switch on!
Can this geyser be installed vertical?
shouldnt the hot water vacuum breaker be over the tray?
Awesome video bro
Great video!!!
Great video
I noticed no mention of R1 lagging, which is required by IOPSA?
The eletrical housing cover on the geyser has come lose and hot water is spraying from it (not alot). Is the geyser done or worth a fix
Solar direct flap panel?
The Prv needs to be at least 100mm above the geyser the next person to go for maintenance on the Prv will have to drain that whole geyser because of syphon more over the Prv is outside of the tray
Fantastic video. Very clear and accurate. ❤❤❤
The eletrical housing cover on the geyser has come lose and hot water is spaying from it (not alot). Is the geyser done or worth a fix
👍👍👍👍👍👍
Thanks for the info. Great video
What a very informative video, every detail 💯
Where does that pipe for recycled water go or connected
Great video, thanks
2:50 is that pipe left open or where does it go thereafter?
Outside of the roof where you can see it
Best video ive seen so far ao easy to understand should i use copper piping or poly pipe as this is cheaper let me know thanks Trev
thank you do you also have solar geyser install
wow! clean & clea video tnx from S.A
First good video I've found! Thanks!
Is this up to date for all current regulations?
The prv is situated outside the tray. The hot outlet does not come up and over the geyser, the vacuum breaker is outside the tray.
When the thermostat is connected, is it necessary to turn it of and then set it to the required temperature? Just to make sure it switch on!
Can this geyser be installed vertical?
shouldnt the hot water vacuum breaker be over the tray?
Awesome video bro
Great video!!!
Great video
I noticed no mention of R1 lagging, which is required by IOPSA?
The eletrical housing cover on the geyser has come lose and hot water is spraying from it (not alot). Is the geyser done or worth a fix
Solar direct flap panel?
The Prv needs to be at least 100mm above the geyser the next person to go for maintenance on the Prv will have to drain that whole geyser because of syphon more over the Prv is outside of the tray
Fantastic video. Very clear and accurate.
❤❤❤
The eletrical housing cover on the geyser has come lose and hot water is spaying from it (not alot). Is the geyser done or worth a fix
👍👍👍👍👍👍
Thanks for the info. Great video