Transit at Scarborough Centre (April 2024)
ฝัง
- เผยแพร่เมื่อ 13 ต.ค. 2024
- Scarborough Town Centre Station is the main transit hub in Scarborough with multiple bus routes running to many points in the Eastern area of Toronto, with commuter & regional service provided by DRT, GO Transit, Rider Express, Megabus, and others. Express bus service has replaced Line 3, with frequent service between here and Kennedy Station, the eastern terminus of Line 2. It is expected to be the Eastern Terminus of the Scarborough Subway Extension when it opens, projected to be in 2030.
Buses seen include:
TTC
8435, 8446, 8462, & 8596 Route 21
1284, 1658, & 1681 on Route 38
3183 on Route 43
3163, 3276, 3304, 9214, & 9228 on Route 129
1315 on Route 130
1260 & 1575 on Route 131
1274, 3479, & 3650 on Route 133
1203 on Route 134
9402, 9410, 9429, & 9446 on Route 903
1503 on Route 938
9224 & 9234 on Route 939
3422, 9054, & 9063 on Route 985
3538, 3572, 3619, & 3627 on Route 996
GO
2489 & 8533 on Route 41
8547 on Route 92
2602 & 8385 on Route 94
DRT
6108 & 8471 on Route 920
Rider Express 22
Megabus DD42728
Thanks for watching! Subscribe to my channel here: / @cmc12scollection
If you enjoyed this video, give it a thumbs up and hit the bell so you know when my next video is published.
The cool thing about Scarborough Centre is that during the RT's time. It made massive headway to and from Kennedy Station and McCowan Station. The only thing that I never liked about the RT was how noisy it was. But it served as a vital transit Artery during its time.
Having been on the 903A myself multiple times. It's not a permanent solution. It's more of a bandaid fix until that damn extension opens. As a hopeful transit enthusiast. I sincerely hope the extension's construction doesn't drag on for long. I'm still waiting on the eventual opening of the Eglinton Crosstown LRT. But with how bogged down construction has been for it. I don't see it opening anytime soon
1681 I think you meant 1661