This is by far the best announcement system on any of the lines. It also sounds the most natural and not stitched together. I know the S-Stock with the new CBTC system can announce some of these things, but it's nowhere near as good as the Victoria system.
2:58 tbf though some LO services terminate at BKG instead of BGV when the line between BKG and BGV is closed such as when there is planned engineering works. so until they update that shit, we'll just pretend that LO are only operating between BKG and BGV
This is by far the best announcement system on any of the lines. It also sounds the most natural and not stitched together. I know the S-Stock with the new CBTC system can announce some of these things, but it's nowhere near as good as the Victoria system.
There are thousands of disruption announcements on the Victoria line
Recently I heard
The Bakerloo line is part suspended between Piccadilly Circus and Elephant & Castle.
2:58 tbf though some LO services terminate at BKG instead of BGV when the line between BKG and BGV is closed such as when there is planned engineering works. so until they update that shit, we'll just pretend that LO are only operating between BKG and BGV
1:51 national rail services from everywhere are suspended
6:49
7:53 national rail from WHC? not since LO took over from LE in 2015 💀
0:37
Another Voice That Says Severe Delays 0:16
what about king’s cross st pancras? 10:46
King’s Cross is on the bank branch not the Charing Cross branch