I appreciate your effort. Not easy to shoot a project site and speak continuously. However, a couple of things I would like to mention. 1) ln one of your early videos and in this video also, I found house keeping quite poor, especially below slab. You should take care while walking when materials are just scattered and not property stacked. 2) While concreting walls which is shown in this video, it should be poured in layers and not in one go as it is appearing. 3) I couldn't find any wooden planks over the slab reinforcements for the workers to walk and vibrators to keep, so that slab rebars should not get disturbed. 4) Hammering from outside is not recommended and not required when you will pour concrete in layers.
@@DCSITEENGINEER deck plan, beam bottom plan, cc plan, Beam corner plan, kicker plan, LS plan, PC plan for upstand, ECA plan, used in making Cad drawing.
Sir basically me mivan shuttering designing krta hu. Mujhe drawing me imagination krne me dikkat aati h kyuki kabhi site pe gya nhi Hu. Agar aap mivan shuttering me use hone wale sabhi component pe ek detailed video bnade toh cheeje kafi clear ho jayengi
Good hard work.. I'm happy to this video so much knowledge
Thank you❤🙏
Make video on 1st slab above last podium slab. Mivan can be used in very first slab where there will be now windows and partition walls.
Ok
Bahot badhiya bai....
I appreciate your effort. Not easy to shoot a project site and speak continuously. However, a couple of things I would like to mention.
1) ln one of your early videos and in this video also, I found house keeping quite poor, especially below slab. You should take care while walking when materials are just scattered and not property stacked.
2) While concreting walls which is shown in this video, it should be poured in layers and not in one go as it is appearing.
3) I couldn't find any wooden planks over the slab reinforcements for the workers to walk and vibrators to keep, so that slab rebars should not get disturbed.
4) Hammering from outside is not recommended and not required when you will pour concrete in layers.
Thank you for your appreciation, but i don't agree with your points sir
@@DCSITEENGINEER Ok. Upto you.
Dearsir would like to inform that your raining arrangement is very good. I appreciate.
Ok sir, I will try to maintain housekeeping, I like your comment, and thank you for your suggestions ❤
Dear sir.
I would like to infrom that you have not define as asequence of installation each amd evey component
Where it is
Mumbai
Sir ECA plan
Sorry plz tell me long form of ECA plan.
@@DCSITEENGINEER deck plan, beam bottom plan, cc plan, Beam corner plan, kicker plan, LS plan, PC plan for upstand, ECA plan, used in making Cad drawing.
Aap ko o plan chahiye kya
Sir basically me mivan shuttering designing krta hu. Mujhe drawing me imagination krne me dikkat aati h kyuki kabhi site pe gya nhi Hu. Agar aap mivan shuttering me use hone wale sabhi component pe ek detailed video bnade toh cheeje kafi clear ho jayengi
All mivan components wala video dekhlo l, agar us mai bhi debut hai to ye 9096297505 ye mera no. Hai call kar lo