Impressive video presentation of the update of the CCLEX. The textual captions are very accurate and informative. Thank you Sir for the continuing update of your vlogs. More power and God bless.
The two halves of main bridge' central span will be connected in about 3.5 months time. That's around end of September till middle of October this year if no significant delays occur. That was the statement from a COWI personnel - COWI is CCLEC's Engineering Consultant.
Once again great views of the bridge and of Cebu City. Hopefully I will be able to visit PI soon after CCLX is finished and I will drive across it and walk across it also, if they will permit pedestrians onto the bridge. Do you know if or when the ground breaking for the 4th bridge will happen? Thanks bai and God bless.
When pedestrian were allowed to walk on Marcelo Fernan bridge, I was one of the early birds there, it was a cool experience. How much more with CCLEX? Pretty sure its gonna be fun, broh! With regards to the 4th, I still don’t have enough information to create a video but I am planning to visit the start point site soon. But when I looked at the architectural rendering, it connects to a coastal highway in mandaue north reclamation. Anyways, il be making a vlog about it soon. Thanks broh as always! 🤙🙂🇵🇭
Cebu will replace Metro Manila as the new iconic city of the Philippines, referring to the famous world's best Mactan Cebu International Airport and now the near completion of the longest, modern and beautiful iconic bridge in the Philippines
Hindi ako inhenyero civil pero curious lang ako: mas ok na design ba kung isa (1) lang ang tower sa gitna ng bridgedeck kaysa mag kapares (2) pylon sa labas ng bridgedeck na magkadikit ang dulo sa itaas? Mukhang malaki rin ang kinaing space ng matabang pylon - hindi ba delekado sa motorista na biglang kumipot ang lane? At saka kung isang hilera lang ang stay cables sa gitna ng tulay, mas stable ba ang single tower kaysa pair of towers? Kung may lateral force, tulad ng wind and earthquake, hindi ba subject to shear stress ang palibot ng pylon? At mas economical ba kung tig- isa lang ang pylon sa magkabilang span ng stayed cable bridge kaysa magpares o dalawa?
Kong 85m nlng ang kulang para magdugtong ang bridge malamang sa September or Early October magkadugtong na yan sa 6m per span sa bawat side sa duration ng 15days bawat kabit at buhos ng span. Credible na matatapos yan by the end of the year at 3 mos more para sa commissioning at finishes and touches.
daghan na gyud mga new sa Cebu, thanks for sharing this.
Hapit na jud mag daug...😊👌👍👍👍
Wow!!!! Cebu_😍
Abante mga Bisaya🏃🏃👈💪
Abante! 🙂
Very woderful presentation. Galing talaga. Appreciate it very much.
Really a big thanks for your appreciation of my work. Inspire me more! 🙌
Igsuon naka shout-out ka sa bag-ong upload cclex update 6 26 2021.🤙
Impressive video presentation of the update of the CCLEX. The textual captions are very accurate and informative. Thank you Sir for the continuing update of your vlogs. More power and God bless.
Your comments are very inspiring my friend! As always my big thanks! 🙌
@@Cebuano123 It's my pleasure Sir.
The two halves of main bridge' central span will be connected in about 3.5 months time. That's around end of September till middle of October this year if no significant delays occur. That was the statement from a COWI personnel - COWI is CCLEC's Engineering Consultant.
wow good news God bless you.
I also think so. Hoping for no more delays. 🙂
Once again great views of the bridge and of Cebu City. Hopefully I will be able to visit PI soon after CCLX is finished and I will drive across it and walk across it also, if they will permit pedestrians onto the bridge. Do you know if or when the ground breaking for the 4th bridge will happen? Thanks bai and God bless.
When pedestrian were allowed to walk on Marcelo Fernan bridge, I was one of the early birds there, it was a cool experience. How much more with CCLEX? Pretty sure its gonna be fun, broh! With regards to the 4th, I still don’t have enough information to create a video but I am planning to visit the start point site soon. But when I looked at the architectural rendering, it connects to a coastal highway in mandaue north reclamation. Anyways, il be making a vlog about it soon. Thanks broh as always! 🤙🙂🇵🇭
@@Cebuano123 Thanks
brah!
Hahaha nakaka exciting n matapos sya
It is! 😎
Nice Ang view sana laging kayo update CCLEX pa shout out camputhaw purok 4 lower sittio nangka laging kayo nonood from camputhaw purok 4 lower sittio nangka
Igsuon naka shout-out ang camputhaw p4 sa bag-ong upload cclex update 6 26 2021.🤙
This is a good update. Salamat.
Thanks a lot for watching and commenting! See you around! 🤙
Thanks sa update sir. Pa shoutout kos next vlog nimu❤
Yes sir sa saturday na vlog! 🙂🤙🇵🇭
karon 6pm upload imo shout out Sir!🙂
Very clear video presentation. Kudos
Salamat Sir! 🤙🙂
Igsuon naka shout-out ka sa bag-ong upload cclex update 6 26 2021.🤙
Cebu will replace Metro Manila as the new iconic city of the Philippines, referring to the famous world's best Mactan Cebu International Airport and now the near completion of the longest, modern and beautiful iconic bridge in the Philippines
good prayer and hope that Cebu will be like Singapore in size 6 times bigger than Singapore so room for development is huge.
@@internationaldirector2917 the Queen City of the South, the first capital of the Philippines
Malipay ta magtan-aw ining mga project na gitukod ba, dunay mga development karon nga panahon. Salamat Sir sa upload mo na video.
Igsuon Leo, naka shout out ka sa upload today around 4pm-6pm June 26, 2021. 🙂
@@Cebuano123 salamat Sir
Thanks again.
You are always welcome! Thanks too!
CEBUANO 123 YOUR THE BEST.
Thank you Sir! 🤙🙂🇵🇭
Hindi ako inhenyero civil pero curious lang ako: mas ok na design ba kung isa (1) lang ang tower sa gitna ng bridgedeck kaysa mag kapares (2) pylon sa labas ng bridgedeck na magkadikit ang dulo sa itaas? Mukhang malaki rin ang kinaing space ng matabang pylon - hindi ba delekado sa motorista na biglang kumipot ang lane? At saka kung isang hilera lang ang stay cables sa gitna ng tulay, mas stable ba ang single tower kaysa pair of towers? Kung may lateral force, tulad ng wind and earthquake, hindi ba subject to shear stress ang palibot ng pylon? At mas economical ba kung tig- isa lang ang pylon sa magkabilang span ng stayed cable bridge kaysa magpares o dalawa?
Kong 85m nlng ang kulang para magdugtong ang bridge malamang sa September or Early October magkadugtong na yan sa 6m per span sa bawat side sa duration ng 15days bawat kabit at buhos ng span. Credible na matatapos yan by the end of the year at 3 mos more para sa commissioning at finishes and touches.
Your calculation is feasible Sir. I also hope so that it connects before the start of the last quarter. 🙂🤙
👍👍👍
🙌🙌🙌
Igsuon naka shout-out ka sa bag-ong upload cclex update 6 26 2021.🤙
Sir not related sa vedio, pero may idea kb Kung natuloy Yung proposal na second runway sa Mactan airport?
Under construction na po actually, half-way done and will open in 2022 po.
It is underway. 🙂
Nice to hear,,diha man gud ko manakayan padulong Manila gikan Siquijor Kay barato ang pamasahe compare sa dumaguete. Salamat
Mahuman na ang CCLEX mga disyembre o basin 2022