One end of the pipe is attached to an orifice of small tank to prevent overflow of the water. The tank is kept on a stool. The other end is attached to a graduated scale. First of all the end with the graduated scale is taken to the Bench Mark and the reading on the scale is noted. Then it is taken to every point and the same reading is marked if it is to be in level with the Bench Mark or suitable graduation is marked according to the required level.
Thank you for acknowledging our efforts, Civil Guruji will continue providing content for Civil Engineers. Stay curious, stay supportive, and keep learning.
Hello Khush T Hum Bahut Khush Hai Ki Aap Ko hamari Mehnat Pasand aai. Hum isi tarah Civil Engineers ko Aaghe Badhate rahange. Keep Learning ,Keep Supporting.
Hello @rambahoransuryavanshi4271 Benchmark nikalne ke liye ek fixed point choose karte hain, jise datum kehte hain. Phir survey tools se us point se height ya level measure karte hain. Ye construction projects me accuracy ke liye zaroori hota hai. 📏😊
Thankyou sir good explanation 🎉❤
One end of the pipe is attached to an orifice of small tank to prevent overflow of the water. The tank is kept on a stool. The other end is attached to a graduated scale. First of all the end with the graduated scale is taken to the Bench Mark and the reading on the scale is noted. Then it is taken to every point and the same reading is marked if it is to be in level with the Bench Mark or suitable graduation is marked according to the required level.
Bhai ek number video banayi hai. Pura detail or efficiency ke sath samjhaya hai
Thank you sir ☺😊
Most welcome @debasishr7968
Very good explanation
Thank you for acknowledging our efforts, Civil Guruji will continue providing content for Civil Engineers. Stay curious, stay supportive, and keep learning.
Nice teaching style with sweet voice
Badhiya thaa
@vishalsonawane9541 Aapka bohot bohot shukriya! Aapka support hamesha humare liye important hai.
Nic sir ,gud explanation
Hello Khush T
Hum Bahut Khush Hai Ki Aap Ko hamari Mehnat Pasand aai. Hum isi tarah Civil Engineers ko Aaghe Badhate rahange.
Keep Learning ,Keep Supporting.
Very good yaar sir good good good
Thank you @creativeideascomedyandreal8466!
khushi hui sunke ki aapko video pasand aaya.
Good morning sir 🙏
Good morning
Level pipe accuracy:(+/-) 2mm, (lower and upper meniscus)
Maybe for more accurate: level pipe in square section.
Nice explanation sir 😊
Thanks for the explanation sir
Bro sab Like kro
👍
very well explained sir...thanks..
Nice sir
Thank you
Jitendra Meena
Hame bohat khusi hai ki aapko hamari mehnat pasand aai , Civilguruji isi tarah civil engineers ko aage badane ke liye mehnat karte rahega aur aap bhi knowledge dusro ko share karte rahe.
KEEP LEARING, KEEP SHARING.
Sewer line के बारे मैं और बता दीजिए
Sir crop field ka level water pipe se kaise dekhe
I have done this in construction of drainage line in our home.
sir stair ka level pipe level sai kese check karte hai botttom sain uska video banaye pless sir
Sir aap site pe kitna din kaam kiye hai plz bataiye
talab ka layout kaise kare
Rcc road ki paip leval kaise nikale. 🙏🏻
Nice
Sir new level pipe me Pani ek level pe Nahi rukta thoda upar niche rukta he or level out ho Kati he plzzz sir solw my problem thanks
Please watch this video 👇
th-cam.com/video/G5AQ0ae58r0/w-d-xo.html
Hope this video will help you.
Drainage system water level for ground please
Bench mark kaise nikale
Hello @rambahoransuryavanshi4271
Benchmark nikalne ke liye ek fixed point choose karte hain, jise datum kehte hain. Phir survey tools se us point se height ya level measure karte hain. Ye construction projects me accuracy ke liye zaroori hota hai. 📏😊
200mm niche kyu kare sir
Hii
Sir job buildo app ka problem kb solve hoga
Aaj Sam 6 baje ke liye session me aapko technology ke bare me sab bataya jayega
Ye mujhe pata tha gurudev mere ghar hai ye water lavel pipe
Why 200mm down
Floor level and slope
Gundu ke bare mai bhi bolo
😂
Samajh nhe aya bhai
That building seems illegal construction on which 3 hindutva flag is waving must be investigated