Rathoa Haryam Bridge Mangla dam Mirpur Kashmir longest bridge 5000 meters in Pakistan

แชร์
ฝัง
  • เผยแพร่เมื่อ 11 ต.ค. 2024
  • Rathoa Haryam Bridge Mangla dam Mirpur Azad Kashmir long bridge in Pakistan
    Rathoa Haryam Bridge Mirpur also known as Islamgarh bridge is a long bridge under construction in the Mirpur district of Azad Jammmu Kashmir in Pakistan.
    AZAD JAMMU & KASHMIR Rathoa Haryam Bridge: Length 5 km Long. Experts have said that 5 kilometers long, the bridge between Mirpur city and Islamgarh.
    The bridge will not only reduce the road link between Mirpur city and Islamgarh town to an unprecedented level but will also reduce traveling time for commuters between district headquarters of Mirpur and Kotli, as well as between Mirpur and Dadayal sub-division.
    The bridge will also open new vistas for the promotion of tourism in the region, the source added.
    Kashmir's Longest Bridge in Mirpur Pakistan is now nearing completion (June-2017) with the final 2 pillars left. This is the simulated design of how the final bridge will look like. The Haryam Rathoa Bridge is over 5000 meters Long and Spans the Mangla Dam in Azad Kashmir and has a suspension Bridge too.

ความคิดเห็น • 24

  • @AbdullahKhan-yc8el
    @AbdullahKhan-yc8el 2 ปีที่แล้ว

    Mashallah ❤️

  • @mukhtarbaig5366
    @mukhtarbaig5366 4 ปีที่แล้ว +1

    Allah bless Muslim Allah bless Pakistan

  • @sixexpress5334
    @sixexpress5334 3 ปีที่แล้ว

    My home land ❤️

  • @printmasterak
    @printmasterak 6 ปีที่แล้ว +1

    Wow amazing

  • @umarch5440
    @umarch5440 6 ปีที่แล้ว +1

    Mashallah sir

  • @AminKhan-xf7vt
    @AminKhan-xf7vt 5 ปีที่แล้ว +2

    Inshallaha 100 years time

  • @usamasandhu9217
    @usamasandhu9217 3 ปีที่แล้ว

    Please complete this

  • @farmanmalik6615
    @farmanmalik6615 4 ปีที่แล้ว

    Abhi Tak yai bridge complete nahin howa afsos ki bat hai Pakistan ka koe edara notice nahin lairaha

  • @Idrees_Azam_Official
    @Idrees_Azam_Official 5 ปีที่แล้ว

    Ye kab mukamal ho ga

  • @qazafirazaq575
    @qazafirazaq575 5 ปีที่แล้ว +2

    Why this this bridge is not compleet jet..??...is to do som thing with corruption??????

  • @theequalizertheequalizer3273
    @theequalizertheequalizer3273 5 ปีที่แล้ว

    Very big bridge

  • @muzzafarali4565
    @muzzafarali4565 4 ปีที่แล้ว

    Last minute vido is fake its not completed yet.

  • @arbabmir3424
    @arbabmir3424 4 ปีที่แล้ว

    They built this bridge wrong it's in a earthquake zone.And why they having trouble putting in the last segments.

  • @Ruby-su2ex
    @Ruby-su2ex 5 ปีที่แล้ว +1

    When they are going to complete this bridge

  • @shaidh1844
    @shaidh1844 3 ปีที่แล้ว

    disgraceful not been completed

  • @KKK07866
    @KKK07866 5 ปีที่แล้ว

    kiya yeh bridge complete ho .giya
    yaa chorooo ki Nazar ho gia

  • @KKK07866
    @KKK07866 5 ปีที่แล้ว

    BRIDGE STEEL UNDER Construction''TILL 2005 TO 2019
    VERY SAD....IS KI REPORT IMRAN KHAN TAK POCHNI CHAHEY