Hi Jason. Congrats for your MAXIMO tutorial. I´m writing you from Spain. I´m a new user of MAXIMO and I´ve a doubt. I found in a P&ID a safety valve (PSV) never installed in field (is a drawing mistake of the EPC Enginerring company). What status will be the correct status in MAXIMO?. PSV Bill of Material is assigned and the valve is located in our Warehouse. Thanks a lot
Hi Jose, I'd leave it in Pending until it was approved to he added to the configuration. Once its approved, installed or not, I'd approve the Item Master. The asset record can be made and that can be in a status like Not Ready until its installed. Let me know if you'd like me to clarify. Good luck!
Hi Jason. Congrats for your MAXIMO tutorial. I´m writing you from Spain. I´m a new user of MAXIMO and I´ve a doubt. I found in a P&ID a safety valve (PSV) never installed in field (is a drawing mistake of the EPC Enginerring company). What status will be the correct status in MAXIMO?. PSV Bill of Material is assigned and the valve is located in our Warehouse. Thanks a lot
Hi Jose, I'd leave it in Pending until it was approved to he added to the configuration. Once its approved, installed or not, I'd approve the Item Master. The asset record can be made and that can be in a status like Not Ready until its installed. Let me know if you'd like me to clarify. Good luck!