Marine Pile Driving - Marine Construction

แชร์
ฝัง
  • เผยแพร่เมื่อ 30 พ.ย. 2024

ความคิดเห็น • 29

  • @franker1111
    @franker1111 ปีที่แล้ว

    I do the same work. Love it. And love doing sheet piling if y'all need another man I'm in

  • @kevinthomas4720
    @kevinthomas4720 3 ปีที่แล้ว +1

    nice job reminds of the old days no safety equipment just build it .

    • @redrobbo1896
      @redrobbo1896 2 ปีที่แล้ว +1

      You think that's a good thing lol?

  • @baumanagement404
    @baumanagement404 3 ปีที่แล้ว

    Very successful documentary, excellent work

  • @paulb1150
    @paulb1150 7 ปีที่แล้ว +5

    To the people filming !
    TIME LAPSE !
    FILM WHOLE INSULATION !!
    COOL ! !

  • @salamalfadly4305
    @salamalfadly4305 4 ปีที่แล้ว +1

    Can you explain how to fixed the center of this piles ?

  • @Nurd68
    @Nurd68 6 ปีที่แล้ว +2

    Nice job!

  • @Devil7414
    @Devil7414 7 ปีที่แล้ว +2

    great video thank you

  • @marinaservices6436
    @marinaservices6436 7 ปีที่แล้ว +2

    Great video! Thank you for posting!

  • @대명건설기계조합
    @대명건설기계조합 4 ปีที่แล้ว

    장비 의힘인가.인간의 능력인가
    대단해요.

  • @larrysgarage1682
    @larrysgarage1682 4 ปีที่แล้ว

    Solid coral does not let a pile sink that rapidly. Extracting pile out of coral and redriving does nothing. Pile will go back into same hole.

  • @ecsean1415
    @ecsean1415 6 ปีที่แล้ว

    just a question. how do you clean inside a drive TSP. It is drived to a depth of 20m at sea. Thank you.

    • @ali13421342
      @ali13421342 6 ปีที่แล้ว +1

      no need for cleaning. depend to designe criteria most of them are open head piles. after completion of driving works, for prevention extra vibration the head going to clean for some meters for puring concrete.

    • @ecsean1415
      @ecsean1415 6 ปีที่แล้ว

      Ali Hossein our design needs to clean the TSP 3m deep though. anyways... thank you for your insights it was really very much appreciated. anyways, is if I need again your knowledge i will contact you again sir. thank you. have a nice one!

    • @MegaReception1
      @MegaReception1 5 ปีที่แล้ว +1

      Just stick a air lift in the pile and create a slury with a water jet and clean to the required depth.

  • @tonnyping
    @tonnyping 7 ปีที่แล้ว

    hi, how is the ground? are they all solid corals? I am interested how could vibratory hammer perform so well if the ground is not favourable.

    • @nathanallsup1224
      @nathanallsup1224 ปีที่แล้ว

      Just have to let the hammer eat it away

  • @garyforgette495
    @garyforgette495 5 ปีที่แล้ว +3

    If they would use a hydraulic excavator they could guide the pipe and not have to use I template with a crane

    • @marsh2202
      @marsh2202 4 ปีที่แล้ว

      Seems like the piles are too far out from the working platform for an excavator.

  • @allenwrench9005
    @allenwrench9005 6 ปีที่แล้ว +3

    NO PPE.WHY

    • @franker1111
      @franker1111 5 ปีที่แล้ว

      I was thinking the same

    • @franker1111
      @franker1111 5 ปีที่แล้ว

      I do the same kind of work.

  • @Joseph_Deering
    @Joseph_Deering 4 ปีที่แล้ว

    NO EAR PROTECTION lol

  • @mikewilks8017
    @mikewilks8017 3 ปีที่แล้ว

    pipe pile crooked as a country road.

  • @longsweep1
    @longsweep1 6 ปีที่แล้ว +1

    nice work!