SOUTH LUZON EXPRESSWAY (SLEX) TOLL ROAD 4 (TR-4)
Project Description:
A new four (4)-lane toll road from Sto. Tomas, Batangas to Tayabas/Lucena City in Quezon, 66.74 km. long
The revised alignment is divided into six (6) packages as follows:
SECTIONS
LENGTH (km)
Package A: Santo Tomas, Batangas to Makban, Laguna
11.32
Package B: Makban, Laguna to San Pablo, Laguna
12.75
Package C: San Pablo, Laguna to Tiaong, Quezon
7.50
Package D: Tiaong, Quezon to Candelaria, Quezon
15.00
Package E: Candelaria, Quezon to Tayabas, Quezon
10.21
Package F: Tayabas, Quezon to Brgy. Mayao, Lucena, Quezon*
9.96
*Proposed TR4 Extension
Project Objectives:
This project aims to:
Improve the transport of goods and services from Southern Provinces to Manila and vice versa.
Shorten travel time, decongest, and reduce the volume of traffic plying the Pan Philippine Highway.
Enhance the economic efficiency of the existing South Luzon Expressway (SLEX), allowing to meet the increasing demand of traffic volumes due to the rapid growth of population, urbanization, and economic development of Quezon Province and adjoining provinces.
Project Benefits:
At the end of construction, the project is expected to:
Efficiently move people, products/goods and services to and from Laguna, Batangas, Quezon, and Bicol Region.
Reduce travel time along the 58-kilometer stretch between Sto. Tomas and Lucena from 4 hours to 1 hour.
Provide the motorists with safer and more convenient travel on modern tollway facilities like well-lit toll plazas, fiber optics, and CCTV cameras, among others.
Project Concessionaire:
SMC SLEX Inc. (formerly South Luzon Tollways Corporation)
Project Cost:
Php 13.10 Billion (subject to adjustment due to additional section, Package F)
Project Status:
Ongoing construction
Accomplishment based on IC’s Progress Report No. 95
Package TR4A: 11 %
Package TR4B: 35 %
Package TR4C: 49 %
Package TR4D: Not yet started
Package TR4E: 1 %
On-going ROW acquisition by the DPWH
Unconditional PTEs/WOP
Package TR4A: 81.57%
Package TR4B: 97.16 %
Package TR4C: 100 %
Package TR4D: 71.14 %
Package TR4E: 59.35 %
Total: 80.16 %
Project Alignment:
Project Timeline:
*TARGET DATE OF COMPLETION:
Package A : 2025
Package B : 2024
Package C : 2024
Package D : To be determined
Package E : 2024
Package F : Design Stage
Target date of completion is based on Independent Consultant’s (IC’s) Progress Report
thank u sa update..suabe road trip...👍☺️
Salamat din po sir Rolando sa panonood..
Magaganda ang mga aerial shots mo brod.
Salamat po sa Dios sis at sa panonood
Ok ang ibinahagi nyo mga lugar na ginagawa dini develop na project sa kalsada. Kaya pala ibang road matagal gawin kasi inaaral mabuti at pinapantay ito kaya may mga pinapatag na lupa pa. Ayos lods.
Opo tama po kayo dyan,maraming salamat po sa laging panonood,,God bless po
welcome po
Thank you for sharing an excellent video again.
You are always welcome boss,thank you for watching..
Thank you for sharing an excellent video again.
Super cool road trip excellent
Thank you for watching
Super cool road trip excellent
Thank you for watching idol
Hahaha 😆 I heard you my good Lad. You know most of the time I watched your videos and repeated many times. Yes I may watched your post silently but. I've never skipped the adds and always press the like button. Look mate most of the time my account is locked up by TH-cam due to my bloody comments on the other channels. But I always watching you. Always take care and enjoy. ❤
I highly appreciated po Doc yung solid support mo po at sa walang sawang panonood thank you po talaga,,ingat po kayo dyan,God bless po
Thanks for sharing lodi....baka pwede mo din lodi isali yung karugtong ng Eco Tourism road sa Candelaria going to batangas
Gud day po sir Greg cge po pasyalan ko po cguro next week sir plano po kc bumyahe to tayabas,,daanan ko po yan..salamat po
ditro po sir gang dulo
Thank you po
Boss paano po naging sto tomas interchange eh Barangay Makiling Calamba City, Laguna po yan vinivideo nyo???
Actually tanong ko rin po yan,hayaan nyo po tatanong po natin sa Sn Miguel corp cla po kc developer nyan e,,salamat po
Hindi nyo na po kailangan itanong yan sa San Miguel Sir, logic lang po sir gamitin natin paanong magiging Sto Tomas interchange yan eh lupang Calamba nga po yan?
Cla po kc nagbigay ng pangalan nyan maam alangan nman po ba baguhin natin or kung cno man,icheck nyo po sa google ang alignment at mga interchanges ng slex tr4 kung ayaw nyo po maniwala sa video natin,salamat po sa time nyo
Yung mga bata ngayon malamang mga binata na bago matapos yang TR4 na yan dahil sa bagal … dahil sa mga ROW issues 🤣🤣🤣
Opo boss lalo na po yang package A sto tomas to Makban,thank you boss