    0:23. Southend. I count 18 crates.
    0:34. Southend, east. Crane positioned to continue erecting the structure. Section of retaining wall left unbuilt for access.
    0:45. Southend, south. Make that 20 crates.
    1:03. Southend, south. Inside. Placing concrete for the mud slab.
    1:34. Southend, west. Bottom right. Short sections of the Level 2 perimeter beam with the glazing channel fixing lugs.
    Can only be for where the extension meets the original building, hard right at 1:43.
    1:56. GA, roof. Bottom right. Pair of small solar panels mounted to the parapet.
    2:32. Southend. Bottom. Trench north, and trench west of a column footing. Grade beam/strip footing construction possibly.
    2:54. Southend. Tank Farm. 4 overflow pipes fitted.
    3:17. BIW roof. Pipework crossing the ridge into Drivetrain. North end of this run seems to be in Casting. Right, at 13:46.
    4:50. Stamping. North-South Road. Cybertruck being towed backwards by a forklift.
    5:11. River Road. South. Electrical vault open. Linesman vehicles on site. Cables draped across the ground? Or is that a shadow.
    7:39. New EOL, west. Apron. Test track line markings.
    8:26. New EOL Supercharges. Line marking the stalls/bays.
    8:43. New EOL Superchargers. Hand-eye co-ordination. A+
    11:16. Westside. North-south road. Gave up waiting for the utility company to remove/relocate the final service.
    12:39. Westside. North-south road. Trenching for stormwater drains.
    13:21. Paint, apron. Cybertruck rear castings being crated up.
    13:55. Casting east, apron. Excavator fitted with a screw-head. Screw/auger piles likely to be installed in the suction excavated holes.
    There are some screw piles on site. Left at 11:54.
    14:22. BIW, apron. Ramp excavation. Small pipe uncovered.
    14:46. WOW yard. Bottom right. Super heavy duty low-loader. What have we missed? Again!
    15:18. Cathode, west. Apron. Square excavation. Pavement saw-cut for a trench towards Cathode.
    15:32. Cathode, west. Loading platform. Rubbish chute.
    16:36. Crash Test Track. Dunking bath. May have been sealed/painted inside. Rebar works for the pavement to be reinstated.
    16:52. Northend. Easement. Right. Excavation works.
    17:14. New switchyard/substation. Fence posts being placed.
    Temporary switchyard. Tanker to drain the oil from the transformer.
    18:22. BESS switchyard. Knife switches open. Megapacks isolated.

    • @franklinmargolis2051
      @franklinmargolis2051 2 หลายเดือนก่อน

      Any thoughts on how materials get into south extension if all windows, no loading bays, and walls from main building are intact? From Boring tunnel?

    • @eclecticmemes
      @eclecticmemes 2 หลายเดือนก่อน +1

      2:18 thru 2:36 So about what timestamp do you think the TBM will pop back up here?

    • @eclecticmemes
      @eclecticmemes 2 หลายเดือนก่อน +1

      I wonder if the California relocated office employees had an employee revolt and said that they needed to have windows for their office spaces and that is the main purpose of the Southern extension?????
      As pointed out elsewhere, there are practically no provisions on the Southern extension for truck loading docks for manufacturing line deliveries.........
      The sheer size of Air Conditioning that will be needed to cool that end of the facility is going to be ginormous! Texas summer heat plus southern sun exposure and those windows are going to push interior temps to 30 -40 C for sure, for sure.....

    • @eclecticmemes
      @eclecticmemes 2 หลายเดือนก่อน +1

      3:58 Has anyone else expressed shock at the lack of stairs/elevators for the parking garage? By my count, it looks like it's going to be 1 at each corner, and only one (for sure) possible two on the north side for a total of 5 or 6? For 12,000 cars and therefore 12,000 people at shift change???????

    • @DessieDoolan
      @DessieDoolan 2 หลายเดือนก่อน

      @@franklinmargolis2051 I think primarily through the existing building.
      My wild speculation is that the extension is for $25K/Model 2/unboxed vehicle to be produced in this open for all to see fully glazed factory.
      Various components built elsewhere in the factory, moved up to the extension in the same way castings, stampings, battery packs etc are moved into the current GA building.
      There are these 3 trenches being constructed away from the south wall that are located at what I think are almost subterranean door openings. Might be part of the plan to bring in materials through those also.
      The tunnel. Joe has some insider information that this is planned for new production vehicles only. Not to say it couldn't be used for shipping stuff through it, but that would mean extra handling to load onto smaller vehicles that would fit in tunnel.

  • @DavidJohnson-tv2nn
    @DavidJohnson-tv2nn 2 หลายเดือนก่อน +7

    Thanks Brad!
    Megapacks:
    @ 18:06 Caution tape removed from the last 5 rows ( 20 Megapacks). Lots of vehicles in the yard.
    BESS substation:
    @ 18:20 12 switches open.
    @ 18:34 12 switches open.
    24 out of 24 switches to the megapacks are open. ALL megapacks offline.
    River road:
    @ 5:10 (Towards the bottom) Utility crew and open vault.
    EOL facility:
    West:
    @ 5:22 Getting ready to finish paving north/south road.
    @ 12:05 Working to pave and open at least 2 lanes of the north/south road. Which would allow a connection to Tesla road from the outbound lot.
    South:
    @ 8:26 and 8:41 Striping the pavement for the drive through or back in superchargers.
    Eastside of casting:
    @ 13:58 (Bottom, open vault by the white truck) Cable splicing complete. Bringing to an end a months long project to connect the factory to the new substation.
    However... Unknown if the east parking lot superchargers have been reconnected to power from the factory yet?
    Tesla Enclosure/Mega-vault:
    @ 17:13 Placing fence posts. Finally nearing completion.
    Temporary substation:
    @ 17:22 (Bottom) Tanker truck by the transformer. To remove oil?

  • @bhollar6515
    @bhollar6515 2 หลายเดือนก่อน +3

    Great work Brad! I count 106 CT vs 95 CT yesterday...hopefully many have been shipped out yesterday!

  • @chuckrenard1537
    @chuckrenard1537 2 หลายเดือนก่อน +6

    Awesome job Brad, Yeah, Cybertrucks everywhere. It doesn't look like the contractors are going to run out of work anytime soon.

    • @BTSloan70
      @BTSloan70 2 หลายเดือนก่อน

      If I were a betting man I would say a second factory will be built in the future. There is plenty of room on the Tesla property for it. Just look what they did in China.

    • @chuckrenard1537
      @chuckrenard1537 2 หลายเดือนก่อน

      An additional factory would be great. When were driving behind gas or diesel vehicles were breathing exhaust fumes even if you don't smell them. @@BTSloan70

  • @benguthrie49
    @benguthrie49 2 หลายเดือนก่อน +2

    Thanks Brad

  • @ohtoah
    @ohtoah 2 หลายเดือนก่อน +3

    Great Job.

  • @MrFoxRobert
    @MrFoxRobert 2 หลายเดือนก่อน +1

    Thank you!

  • @andreandre1051
    @andreandre1051 2 หลายเดือนก่อน +1

    Merci👍👍👍

  • @sammyk874
    @sammyk874 2 หลายเดือนก่อน +2

    Thanks!

    • @BTSloan70
      @BTSloan70 2 หลายเดือนก่อน +1

      Thank you for your support of this channel.

  • @mahitube143
    @mahitube143 2 หลายเดือนก่อน +1

    👍

  • @pfcrow
    @pfcrow 2 หลายเดือนก่อน +1

    13:20 Joe had said it looked like they might be crating up some of the casts for shipping, and you caught it. I wonder where they're shipping them off to?

    • @RanchReed
      @RanchReed 2 หลายเดือนก่อน

      Wonder if they store small percentage for repairs somewhere? One front casting might be going to the service center in Hollywood

  • @driveideasdad
    @driveideasdad 2 หลายเดือนก่อน +1

    Amazing! I’ll be in Austin in the next few weeks. Any idea how to get a tour?

    • @DessieDoolan
      @DessieDoolan 2 หลายเดือนก่อน +1

      Through the referrals program only as far as I know.

  • @roncolson7305
    @roncolson7305 2 หลายเดือนก่อน +1

    When is the power company gonna move that pole on the northwest corner so they can finish the road? Sheesh!

    • @sammyk874
      @sammyk874 2 หลายเดือนก่อน +1

      Guess they got tired of waiting!

    • @BTSloan70
      @BTSloan70 2 หลายเดือนก่อน +1

      Notice that the Paving is on the other street side from the pole.

    • @kkarllwt
      @kkarllwt 2 หลายเดือนก่อน +2

      They can stripe it down the middle.and 2 lane it. They need to get the trucks to the highway@@BTSloan70

    • @roncolson7305
      @roncolson7305 2 หลายเดือนก่อน

      @@BTSloan70 yeah but the plan is to have roadway where that pole is and it has been left there for months. Just strikes me as odd this hasn’t been taken care of.

    • @sammyk874
      @sammyk874 2 หลายเดือนก่อน

      @@roncolson7305 Still has something on it. Maybe it's the cable company and not power company.

  • @thewolfdoctor761
    @thewolfdoctor761 2 หลายเดือนก่อน +2

    Most of the workers must be on a coffee break.

  • @ChristianBlueChimp
    @ChristianBlueChimp 2 หลายเดือนก่อน +1

    4:50 Cybertruck being towed by a forklift - seems legit.

  • @user-lt7xk7qw8e
    @user-lt7xk7qw8e 2 หลายเดือนก่อน

    Like 4 Brad lmao, watcher 26, Elon can you spare 4 window panes for my house, need my shipping address lmao, nice look