I I'm very disappointed in the poor work that was allowed to be done by the NWA.. At this stage, the entire senior management of the NWA should have resigned. Because it's a disgrace..
Who forgot to add the geotextile fabric to the original scope of work? Why didn't the scope of work include proper drainage and sidewalks? Why didn't the scope of work include provisions to widen the roads?
Bro, by now, you should realize that inadequate scope of work and poor oversight are the root causes to most of the problems on this section. That's where the residents were mostly short changed, and what you should focus on. The contractors could have certainly done better in some cases. However, some things are definitely outside of their control.
How can that be Good work for Seafort look at the at the condition of the road up the police station the top section fix and the part going to reggae falls fix and in the middle is a mess people fi do the right thing and just fix the road good 🤧
The government is laying pipelines for water, drains, and improving the roads .....rain falling daily..... stop the click baiting.... roads can't fix in rain....
The quality of some of the work sucks. It has been less than two years since most of the roads has been paved and already they have to redo them, and I have a feeling it's just a matter of time before they will need to redo more. If I'm correct they have paved the section in Lysson by the the Golden Shore Hotel at least three times already, that's the definition of poor quality of work. For the record I'm referring to the local contractors. The Chinese are not perfect but I have more confidence in their work.
I think you'll should complain a lot more and a lot louder... I do notice that you'll do not name the contractors who are responsible for the shoddy work even though you'll know who they are. Just mention X company paved this section in your videos. I understand you'll have gotten to know some of the workers but facts are facts. I think it's ridiculous that these companies are not able to pave a road correctly with all the knowledge that's out there for free.
One layer of asphalt go on that road. You are overreacting. I remember when colts did pamphlet to kingston I the 1990s and no work over was done on the road then and nobody complained when the road start to sink. Here, we see rework going on I the road. A lie Miva tell? This is a different contract and it has to be done over. A we same one did say we want local contractors to do the work, you klarity big up the local contractors all while but now you complaining. Since you cool with them why you don't link them and ask them wasdup?
Thanks!. Keep doing what you are doing.
Thanks!
Thanks to you Sir Gel
Keep doing what you are doing because there are no one looking out for us in St. Thomas thanks
I I'm very disappointed in the poor work that was allowed to be done by the NWA.. At this stage, the entire senior management of the NWA should have resigned. Because it's a disgrace..
We are watching from afar and are seeing the progress. Maybe you need to take a step back so you can see better.
True mi g them at the top of the n.w.a dont know how to fix road we need to get the minster of works to tell us when them going to fix the road
Who forgot to add the geotextile fabric to the original scope of work? Why didn't the scope of work include proper drainage and sidewalks? Why didn't the scope of work include provisions to widen the roads?
Talk di truth 👏🏽
Bro, by now, you should realize that inadequate scope of work and poor oversight are the root causes to most of the problems on this section. That's where the residents were mostly short changed, and what you should focus on. The contractors could have certainly done better in some cases. However, some things are definitely outside of their control.
clarity u nuh hear see di contractors responsible for the repairs of the roads for up to two year?Just relax and observe my yout.
How can that be Good work for Seafort look at the at the condition of the road up the police station the top section fix and the part going to reggae falls fix and in the middle is a mess people fi do the right thing and just fix the road good 🤧
So much land space and it's so narrow and no proper drainage. Bush everywhere and no maintainance or sidewalk area.
Lately, it would seem you have been used!! Where's the praise for the miles and miles of improvements!!
Since you wise up what are you going to do?
You seem to want everything to be completed simultaneously.
The government is laying pipelines for water, drains, and improving the roads .....rain falling daily..... stop the click baiting.... roads can't fix in rain....
You know nothing bout quality Road work! You've never seen anything like this before. If you have; tell us where.
The quality of some of the work sucks. It has been less than two years since most of the roads has been paved and already they have to redo them, and I have a feeling it's just a matter of time before they will need to redo more. If I'm correct they have paved the section in Lysson by the the Golden Shore Hotel at least three times already, that's the definition of poor quality of work. For the record I'm referring to the local contractors. The Chinese are not perfect but I have more confidence in their work.
I think you'll should complain a lot more and a lot louder... I do notice that you'll do not name the contractors who are responsible for the shoddy work even though you'll know who they are. Just mention X company paved this section in your videos. I understand you'll have gotten to know some of the workers but facts are facts. I think it's ridiculous that these companies are not able to pave a road correctly with all the knowledge that's out there for free.
One layer of asphalt go on that road. You are overreacting. I remember when colts did pamphlet to kingston I the 1990s and no work over was done on the road then and nobody complained when the road start to sink. Here, we see rework going on I the road. A lie Miva tell? This is a different contract and it has to be done over.
A we same one did say we want local contractors to do the work, you klarity big up the local contractors all while but now you complaining. Since you cool with them why you don't link them and ask them wasdup?
Tell you what you can GO AND ASK THEM YOURSELF