How to Measure Wind speed on workplace| Digital Anemometer Used| Wind speed and Stop work

แชร์
ฝัง
  • เผยแพร่เมื่อ 15 ก.ย. 2024
  • This is site demonstration how to use digital anemometer on site. what is allowable wind speed limit for crane and Work at height activities?
    #digital anemometer
    #wind speed limit
    #high wind
    #dynamic pressure
    #ground and hight wind velocity
    Anemometer device
    #safety issue
    #wind hazards
    following link
    • Foam Type Fire Extingu...
    Foam Type Fire Extinguisher Class A B | Advantage and Disadvantage
    • Contractors Safety Dis...
    Contractors Safety Discussion | safety compliance at workplace| Safety Rule| Contractor ka safety
    • Heavy Equipment|Roller...
    Roller Compactor Machine Use for Base course compaction/ Hazards Existing
    • Loader Safety Trainin...
    Loader Safety Training and Inspection on site /Hindi urdu
    • Crane Outrigger safety...
    Crane Outrigger safety /Nearmiss/Dangerous/Ground condition
    • Man Basket Safety Meas...
    Man Basket Safety Measure Awareness on site in hindi
    • Railway Safety Trainin...
    Railway Safety Training Indian / Saudi Railway/Safety on Track in hindi
    • IOSH Membership Grades...
    IOSH Membership Grades and Benefits Health and safety Professional in Hindi Urdu

ความคิดเห็น • 9

  • @allrounder8236
    @allrounder8236 3 ปีที่แล้ว +1

    Sir I am great fan of you from Pakistan, me ny abi nebosh igc exam dya Hua hy

  • @syedkhalid7998
    @syedkhalid7998 3 ปีที่แล้ว +1

    Can you suggest me how can I get more details regarding wind speed for all kinds of activities tower crane mobile crane manlift cantilever scaffold

    • @healthsafetysolution
      @healthsafetysolution  3 ปีที่แล้ว +1

      We can go through EHS manuals and manufacturer recommendation as well. Generally 44 Km/h for elevated equipment like man lift and for crane lifting 32 km/h

  • @samishaikh1785
    @samishaikh1785 3 ปีที่แล้ว +1

    Sir knotts m measure nhi krte ho?

    • @innocentbeas
      @innocentbeas 2 ปีที่แล้ว

      Knots marine k leyai krty hai

  • @shashankupadhyay3367
    @shashankupadhyay3367 3 ปีที่แล้ว

    How to get job after passing nebosh igc plz tell, and tell what is the scope of nebosh igc, i need a full detail video on this topic?Thank you.

  • @shashankupadhyay3367
    @shashankupadhyay3367 3 ปีที่แล้ว

    At what wind speed we need to stop work?

    • @healthsafetysolution
      @healthsafetysolution  3 ปีที่แล้ว

      Generally it is depend on design of elevated equipment and as well as client ESH standard, 44 Km/h for elevated equipment like man lift and for crane lifting 32 km/h