Top 4 solar Questions from customers | Clarifying solar panel doubts | Danny Techie Talks

แชร์
ฝัง
  • เผยแพร่เมื่อ 22 ส.ค. 2024
  • Contact Person : Mr. Blessing
    Contact number/WhatsApp : 8778828090 (Only Chennai, Chengalpattu, Kanchipuram Tiruvallur district)
    • Best Single phase sola... - Video full link
    Minimum 3kw and above projects only (We are NOT doing any government subsidy projects)
    we are doing solar business for Last 7 years in Chennai and installing on-grid for all companies and in homes. we are providing best prices for all types of solar panels, inverters, and batteries in and around Chennai, Chengalpattu, Kanchipuram, Tiruvallur district send your contact number in 8778828090 or msg in insta/FB Danny techie talks. Please watch all videos to learn about solar, please don't call us for asking doubts.
    link- • Best Single phase sola...
    #solar system,
    #solar,
    #solarsystem,
    #solarpanel
    #solarpower
    #solarpanels
    #bestsolar
    #enphase
    #bestinverterforhome
    #bestsolar
    #ongrid
    #waaree
    #microinverter
    #bifacialsolarpanel
    #bifacial

ความคิดเห็น • 45

  • @SenthilKumar-eh9kl
    @SenthilKumar-eh9kl 7 หลายเดือนก่อน +2

    Need is the purpose of invention in between two panel keep heavy single phase change over switch and make it series or parllel

  • @dannycbe949
    @dannycbe949 7 หลายเดือนก่อน +2

    Excellent video.
    So many practical points covered.
    Thankyou sir!!

  • @ramaeeesparks
    @ramaeeesparks 6 หลายเดือนก่อน +2

    Bro solar pannel podrathu one of the main reason economical and second one is sustainability. On-grid mattum potta, namma kitta solar irunthum.. power ku EB depend panni than iruka vendi iruku. One of the main purposae defeat aguthae. EB power illatha time la generate agura power kooda wastea thana pogum.

  • @solaikumar1612
    @solaikumar1612 6 หลายเดือนก่อน +1

    உங்களைச் சந்தித்து மிக்க மகிழ்ச்சி வாழ்த்துக்கள்🎉🎊

  • @vinodm6372
    @vinodm6372 4 หลายเดือนก่อน

    Good explanation.. what's the solution in November/ December during power cut?

  • @vu2rjw
    @vu2rjw 2 วันที่ผ่านมา

    hybrid is the best system

  • @loghankumar6666
    @loghankumar6666 7 หลายเดือนก่อน +1

    20 x 8 container house ku solar panels use pannalaamaa

  • @shankarkrupa
    @shankarkrupa หลายเดือนก่อน

    so no off-grid means no solution for people in rented apartments 😢 Perhaps will a 0 5kw or 1kw off-grid solution be suitable for rented apartment people?

    • @DannyTechieTalks
      @DannyTechieTalks  หลายเดือนก่อน +1

      Apartment peoples are fighting with each other while installing the panel’s so please ask prior permission to association before calling any solar installers.

  • @gayathridevi6222
    @gayathridevi6222 6 หลายเดือนก่อน

    Could you please tell How to cancel or modify net meter application if needed.

  • @foodfood4214
    @foodfood4214 7 หลายเดือนก่อน +1

    அண்ணா நீங்க சொல்றது ஆப் கிரேட் ஓகே ஆனா நீங்க அத கொஞ்சம் மாத்தி பண்ணுங்க எப்படி அப்படின்னா சோலார் பேனல் இருந்து எப்படி கண்ட்ரோல் போட்டு சார்ஜ் பேட்டரி குடுங்க சாதா சைனி ப்ராஜெக்ட் எடுத்து சைன் இன்வெர்ட்டர் எடுத்து ஆர்டினரி அஞ்சு கிலோமீட்டர் போட்டு விடுங்க போன் நம்பர் ஃபெயில் மாடல் கிடையாது

  • @kelangovan5597
    @kelangovan5597 5 หลายเดือนก่อน

    Excellent brief explanation ❤

  • @gmanoj26
    @gmanoj26 7 หลายเดือนก่อน

    2. Inverter can be over loaded 1:2 ratio and it's allowed as per the reputed brand investers data sheet. If we install the DC capacity more than recommended then that will be a problem. If we are overloading within the the range, we can complain the service engineer and get the warranty

    • @DannyTechieTalks
      @DannyTechieTalks  7 หลายเดือนก่อน

      Yes as per inverter norms it will accept but service engineers are not accepting . I’ll not make my coustmer to suffer while inverter is in warranty so I spoke about this point in my video.

    • @balamurugansakthivel5924
      @balamurugansakthivel5924 2 หลายเดือนก่อน

      Inverter is device to convert DC to AC, IF DC Volt and DC AMPS within the range of manufacture recommendation , then no issues. for example, 3 kw inverter they will take 3 kw load , even though if input DC load is high.

  • @parthicandy
    @parthicandy 6 หลายเดือนก่อน

    Good day! Do you not recommend off grid solar even for residential purpose?

    • @DannyTechieTalks
      @DannyTechieTalks  6 หลายเดือนก่อน

      Yes it’s completely waste of money for customer . I’ll never recommend off Grid to anyone in my life. Worst system in the world is off grid only

  • @dominicsavio6029
    @dominicsavio6029 3 หลายเดือนก่อน

    5th question - why you are not doing government subsidy projects..

    • @DannyTechieTalks
      @DannyTechieTalks  3 หลายเดือนก่อน

      Because they’re not approving subsidy and money not getting credit to my customers .

  • @sharvesh.s.p8127
    @sharvesh.s.p8127 7 หลายเดือนก่อน +1

    My question is always when will yu start yur services in Coimbatore???
    Or recommend any body like you in coimbatore

    • @DannyTechieTalks
      @DannyTechieTalks  7 หลายเดือนก่อน

      Many are there in Coimbatore, I’ll speak with my solar team and let you know the vendor name soon in my video

    • @sharvesh.s.p8127
      @sharvesh.s.p8127 7 หลายเดือนก่อน

      @@DannyTechieTalks i am waiting ..

  • @sapidumsamayal
    @sapidumsamayal 4 หลายเดือนก่อน

    Sir how many days will take to ADD LOAD in my TNEB old 3 phase 3 KW TO 6KW?

    • @DannyTechieTalks
      @DannyTechieTalks  4 หลายเดือนก่อน +1

      10 to 15 days

    • @sapidumsamayal
      @sapidumsamayal 4 หลายเดือนก่อน

      @@DannyTechieTalks I have paid online fees of Rs 19,000+ . After making payment it will automatically updated in TNEB SITE ACCOUNT SUMMARY TO MY SERVICE CONNECTION or we need to give paid receipt and application to TNEB?

  • @ParanidaranVaradarajan
    @ParanidaranVaradarajan 7 หลายเดือนก่อน

    How about UTL SOLAR PANEL? why you are not recommand that indian company?

    • @DannyTechieTalks
      @DannyTechieTalks  7 หลายเดือนก่อน

      UTL is just start-up company and it’s not reputed brand. I’ll always prefer Waaree and Vikram solar who is in market more than 30 years.

  • @prabhakaranr965
    @prabhakaranr965 6 หลายเดือนก่อน

    Brother zero export meter இப்ப allow பன்றாங்களா ?

    • @DannyTechieTalks
      @DannyTechieTalks  6 หลายเดือนก่อน +1

      Officially they’re not allowing but unofficially most of the commercial users are installing.

  • @earnestjerome
    @earnestjerome 7 หลายเดือนก่อน +1

    Can we stand on the solar panel and do some work?

    • @DannyTechieTalks
      @DannyTechieTalks  7 หลายเดือนก่อน

      It’s depends no of person standing in solar panel and person weight . I’ll never recommend more than 1 person ( 60 kw weight )per panel.

    • @earnestjerome
      @earnestjerome 7 หลายเดือนก่อน

      @@DannyTechieTalks Thank you for the clarification

  • @jasirkalady7350
    @jasirkalady7350 7 หลายเดือนก่อน

    Axitec solar panels is it good?
    Made for where?

    • @DannyTechieTalks
      @DannyTechieTalks  7 หลายเดือนก่อน

      Made in Andhra, not in German

    • @basicmailid8302
      @basicmailid8302 6 หลายเดือนก่อน

      bro indha question ah axitec deal pandravanga kita ketingala ?

  • @immanuela1644
    @immanuela1644 7 หลายเดือนก่อน

    நியூட்ரல் எர்த் செய்ய வேண்டுமா?

    • @DannyTechieTalks
      @DannyTechieTalks  7 หลายเดือนก่อน

      Separate Earthing for On Grid inverter and for panel

  • @deepakduraia6501
    @deepakduraia6501 7 หลายเดือนก่อน

    U r solar system is come under subsidy

  • @9791686565
    @9791686565 7 หลายเดือนก่อน

    I have solutions for question 1

    • @Karma4all420
      @Karma4all420 6 หลายเดือนก่อน

      pls tell

    • @9791686565
      @9791686565 6 หลายเดือนก่อน

      ​@@Karma4all420 12 v or 24 v manual DC change over need to do at the power Shutdown time based on Your Home UPS & Battery Capacity.