4.Cottage Crawlspace TheFootings

แชร์
ฝัง
  • เผยแพร่เมื่อ 13 ม.ค. 2025
  • The concrete for the footings had to cure for about a week before pouring the concrete for the crawlspace floor.
    The footings under the crawlspace floor will support the ICF walls, the cottage floor beams and jack posts when the cottage is lowered back down.

ความคิดเห็น •