Sino ba ang naghahandle ng LRT-1? Ang ganda ng pagmamanage nila. Kita mo sa linis ng mga terminal at train. Kahit luma na, makikita mo na well maintained sya. Plus itong mga bagong stations, maayos din. Pero bakit yung MRT 3, parang walang improvement.. napag iwanan na ng panahon
I wish mas tinaasan nila yung ceiling as a passive way to cool down the platform area. But thanks to the team for delivering this project without much delay.
@@laaaavvv Approved and then? wala na kahit pag settle ng ROW walang nagawa. Sa buong Termino ni Pnoy ano ba ang nasimulan niyang MAJOR railway project? puro highway LOL
And remember natapos ang 6 years term ni digong walang natapos na station puro poste lang. While pbbm admin within 2 years natapos agada ang 5 station.
I give this place 3 months for the following to happen; 1. Broken elevator 2. Homeless people by the stairs 3. Broke. Foot tiles 4. Leaking ceilings 5. Dead light bulbs 6. Security staff that creates massive lines unnecessarily All because Philippine do not believe in maintenance and efficiency of commerce.
@@tootifrooti7297 hindi naman kasi bare minimum yung mga bagong gawa na design ng mga stations ng LRT ang kinagandahan nga is yung integration ng mga public transportation. No need naman ng masyadong garbo. Tingnan mo yung mga metro lines sa SEA kadalasan overdesigned yung mga stations wala narin naman utilities yung iba added aesthetics. Yung kulang lang naman is yung maintenance. Yung gamit nga na trains ng LRT lalo na sa 5 bagong bukas na stations ay di hamak na mas maganda at new model.
@ most other progressive Asian countries have a minimum of 2 escalators on their newer stations or connected to malls / commercial buildings. The elevator looks small too. :(
Sana ganyan sa lahat ng istasyon
SANA GANYAN DIN ANG MRT 7
Sino ba ang naghahandle ng LRT-1? Ang ganda ng pagmamanage nila. Kita mo sa linis ng mga terminal at train. Kahit luma na, makikita mo na well maintained sya. Plus itong mga bagong stations, maayos din. Pero bakit yung MRT 3, parang walang improvement.. napag iwanan na ng panahon
I wish mas tinaasan nila yung ceiling as a passive way to cool down the platform area. But thanks to the team for delivering this project without much delay.
Sana lahat ng escalator at elevator gumagana always. 😂
Thank you you FPRRD for making all this drafts from those former admins came into reality.
uhhh the lrt cavite extension was actually approved under the aquino admin
@@laaaavvv Approved and then? wala na kahit pag settle ng ROW walang nagawa.
Sa buong Termino ni Pnoy ano ba ang nasimulan niyang MAJOR railway project? puro highway LOL
And remember natapos ang 6 years term ni digong walang natapos na station puro poste lang. While pbbm admin within 2 years natapos agada ang 5 station.
I give this place 3 months for the following to happen;
1. Broken elevator
2. Homeless people by the stairs
3. Broke. Foot tiles
4. Leaking ceilings
5. Dead light bulbs
6. Security staff that creates massive lines unnecessarily
All because Philippine do not believe in maintenance and efficiency of commerce.
@@jakexake2940 walang ganyan sa LRT1.. next
Very simple kung e kompara mo sa mga kapitbahay nating bansa pero ok narin yan hehe
Eh naseserve naman purpose. Arte mo tsaka private naman gumastos. Pag ginandahan baka umarte ka din dahil dagdag sa pamasahe hahaha.
Mabuti nga at nadagdagan ung istasyon eh kesa sa wala. Arte mong bakla ka, chumupa ka na lang ng burat🤣
@@julesamielangeles1077 gusto ko ganitong mindset, lets settle sa bare minimum
@@tootifrooti7297 hindi naman kasi bare minimum yung mga bagong gawa na design ng mga stations ng LRT ang kinagandahan nga is yung integration ng mga public transportation. No need naman ng masyadong garbo. Tingnan mo yung mga metro lines sa SEA kadalasan overdesigned yung mga stations wala narin naman utilities yung iba added aesthetics. Yung kulang lang naman is yung maintenance. Yung gamit nga na trains ng LRT lalo na sa 5 bagong bukas na stations ay di hamak na mas maganda at new model.
@@julesamielangeles1077 hindi siya ma arte mababa lang ang standards mo
80s design ...Pinoy brain capacity
Only one escalator?
meron naman elevator
@ most other progressive Asian countries have a minimum of 2 escalators on their newer stations or connected to malls / commercial buildings. The elevator looks small too. :(
San Yan Banda sa Cavite
wala pa
hanggang sucat paranaque palang
Niog LRT Station in Bacoor City Cavite maybe in 2031
Phase 1 of the LRT-1 Cavite Extension spans 6.2 kilometers from *Barangay Baclaran* to **Barangay San Dionisio** in *Parañaque City.*
NA APPROVED KAY PINOY
SINIMULAN KAY PRRD GANGA NATAPOS TERM NYA PURO POSTE WHILE KAY PBBM WITHIN 2 YEARS NATAPOS ANG 5 STATION SALAMAT SA LAHAT .