Process Accident - Inadequate Isolation during Reactor Cleaning

แชร์
ฝัง
  • เผยแพร่เมื่อ 7 ม.ค. 2025

ความคิดเห็น • 17

  • @FayeVert
    @FayeVert ปีที่แล้ว +27

    Anybody else here because the cravings for another CSB video have just gotten too strong?

  • @GTR_KSA
    @GTR_KSA ปีที่แล้ว +3

    Thanks a lot its reall give us an indications to prevent such as slip blind install before start a hot work activity. The isolation plan was not verified well and is not identified. Require more attention and risk assessment before start this activities. Pray to god to safe life for everyone

  • @saifsumra6803
    @saifsumra6803 ปีที่แล้ว +2

    But why was cutting activity conducted. What equipment was to be installed

  • @stevejones9062
    @stevejones9062 ปีที่แล้ว +1

    once again incompetence at the management level kills.

  • @mohdzulakbar8987
    @mohdzulakbar8987 29 วันที่ผ่านมา

    Dear sir, kindly need your permission to download your video for my presentation.. Thanks in advance

  • @doxielain2231
    @doxielain2231 ปีที่แล้ว

    Where did this incident happen?

  • @Samuel-yz1sm
    @Samuel-yz1sm 8 หลายเดือนก่อน

    Top videos

  • @safetylnw5480
    @safetylnw5480 ปีที่แล้ว

    Thanks for this. Great content 🎉

    • @uprocess4927
      @uprocess4927  ปีที่แล้ว +1

      Glad you enjoyed it!

    • @saifsumra6803
      @saifsumra6803 ปีที่แล้ว

      But why was cutting activity conducted. What equipment was to be installed

  • @Samuel-yz1sm
    @Samuel-yz1sm 8 หลายเดือนก่อน

    Yea