Hi, i have set cyclic days to run every fourth day. Should I leave the dial on water days or turn it back to auto to ensure the cyclic days run?. Thanks
I just installed a new TM2 today. When I run a manual start, the screen show a “test” message and it cycles on and off every minute or so and very briefly activates #1 set.
Hello, I have 4 stations (Prog A) set to run sequentially for 25 mins each at 4:30, 5, 5:30 and 6am. After compelling the cycle, station 1 restarted. I have all stations in Prog B and C set to Off. can you please advise what may be the issue
Hi, i have set cyclic days to run every fourth day. Should I leave the dial on water days or turn it back to auto to ensure the cyclic days run?. Thanks
I just installed a new TM2 today. When I run a manual start, the screen show a “test” message and it cycles on and off every minute or so and very briefly activates #1 set.
Hello, I have 4 stations (Prog A) set to run sequentially for 25 mins each at 4:30, 5, 5:30 and 6am. After compelling the cycle, station 1 restarted. I have all stations in Prog B and C set to Off. can you please advise what may be the issue
Hello, you need only 1 start time on the program and all zones with time will run on that program. No need for multiple start times. Hope this helps!
wher the master valve location?
Hello, typically very close to the water source! Hope this helps
Why does zone 1 skip to zone 3 instead of zone 2
Hello, typically it would mean there is no run time on zone 2.
@@SchepersLawnSprinklingSystems Thank you
Bunun Türkçe yazılımını yapın her ülkenin diline uygun yada bir anahtar koyun hangi ülkelerin dillerine göre yapılsın