Hi sir . I am your subscriber sir . I saw your videos they are so good and so clear . I saw moisture correction video I have doubt sir if I want to do moistrue correction in heavy rainy 🌧 season for RMC plant . The material is too wet what I have to do sir Please explain Sir 🙏
Hi Sir I am R.Thiruvasagan Senior manager quality control From : TAMILNADU I just saw your videos 📹. It's superb fantastic 👏 I just saw Daily day moisture correction video . But one dought sir what can we do for heavy rain 🌧 how can we do moistrue correction in batching plant . Can you explain 🤔 in any videos are can you tell it about separate video Keep rocking 😎 Sir .
While evaluating surface moisture, calculation is made with respect to dry weight while u have taken with respect to ssd wt.Furthermore surface moisture of coarse aggregate shouldn't be done in this way as u calculated because it's not customary that coarse aggregate becomes oven dry after 4hrs.
Dear learner Theoriticallly you are right but in actual conditions, we have to neglect some minor things otherwise project will not be completed on time
Bdiya sir ji
Thanku sir ji🙏🏼🙏🏼
Excellent Brother 🤝🤝🤝
Good 👍
Thank you so much sir ji 🙏
Thanku sir
Nice sir ji
Very good
Thank you so much
Super thanks
Hi sir . I am your subscriber sir . I saw your videos they are so good and so clear . I saw moisture correction video
I have doubt sir if I want to do moistrue correction in heavy rainy 🌧 season for RMC plant . The material is too wet what I have to do sir
Please explain Sir 🙏
How water observation calculate??
Thanks sir
Dear sir can u just explain why i am adding the adjustment sand in the total sand quantity whats the reason behind it
Hi Sir
I am R.Thiruvasagan
Senior manager quality control
From : TAMILNADU
I just saw your videos 📹. It's superb fantastic 👏 I just saw Daily day moisture correction video . But one dought sir what can we do for heavy rain 🌧 how can we do moistrue correction in batching plant . Can you explain 🤔 in any videos are can you tell it about separate video
Keep rocking 😎 Sir .
Kon sa company mei?
TQ sirr😘😘😘😘❤️❤️❤️❤️
Sir Engineer ko feeld me kya work Karna padega
Sir koi IS code jha correction mwntiin ho batching plant ke liye
Site at admiture add dosages limits how much water add 6cum ?? QC norms
. 61 and 1.28 yah standard hai kya.
Idont understand the water observation table please give the procedure
While evaluating surface moisture, calculation is made with respect to dry weight while u have taken with respect to ssd wt.Furthermore surface moisture of coarse aggregate shouldn't be done in this way as u calculated because it's not customary that coarse aggregate becomes oven dry after 4hrs.
Dear learner
Theoriticallly you are right but in actual conditions, we have to neglect some minor things otherwise project will not be completed on time
How to found colum c
Water observation%
0.61
0.61
1.28 kaha se aaya ?
Ye standard value hai kya?
Ya different different source ke liye ye different hoga?
Plz reply me🙏🙏🙏
0.61 as per design mix h
1.28 mila h site pr
To en dono ka difference compensate krne ke liye hi to moisture correction kiya jata h
Sir admixture me koi changes karne padte hai kya ?
No
RMC bleeding , segregation concrete slump reject / redose at plant again slump ok is acceptable or rejected as QC norms M30 grade ??
How to find out in column c results.
It’s all ready mentioned in mix design
Sir aapne water obserption lia hai kya ye sirf 1 baar hi lia jata hai jab correction report banate hai
Hr roj correction kiya jata h
Summer time correction moisture content = 0 how calculated
Rainy season correction what difference sir
Please watch video carefully
You will find your answer dear..
1.28 and 1.28 kya hai
300°c to nhi karna hai ham 100 ya 105°c par karna hai
Yes
Which is code
4925
classical
Is code sir
10262
M25 k liye 410 kg !!!
Yes for M25 VDF
M-40 me chalta h 410
Wrong calculation!