6 Big Losses in Manufacturing | TPM 6 BIG LOSSES | How to Eliminate 6 BIG LOSSES BY TPM (हिंदी में)

แชร์
ฝัง
  • เผยแพร่เมื่อ 25 ก.ค. 2024
  • TPM SERIES VIDEO-03
    6 Big Losses in Manufacturing | TPM 6 BIG LOSSES | How to Eliminate 6 BIG LOSSES by TPM (हिंदी में)
    Developed in 1971 at the Japanese Institute of Plant Maintenance, the Six Big Losses in manufacturing have been used as a way to categorize equipment-based losses and maximize overall equipment effectiveness. The six big losses can be split into three general categories- Availability, Performance and Quality losses. The Six Big Losses are a very effective way to categorize equipment-based losses.
    , to see how to identify & Eliminate 6 Big Losses Please watch the complete Video.
    1971 में जापानी इंस्टीट्यूट ऑफ प्लांट मेंटेनेंस में विकसित, विनिर्माण में छह बड़े नुकसान का उपयोग उपकरण-आधारित नुकसान को वर्गीकृत करने और समग्र उपकरण प्रभावशीलता को अधिकतम करने के लिए किया गया है। छह बड़े नुकसानों को तीन सामान्य श्रेणियों- उपलब्धता, प्रदर्शन और गुणवत्ता के नुकसान में विभाजित किया जा सकता है। छह बड़े नुकसान उपकरण-आधारित नुकसान को वर्गीकृत करने के लिए एक बहुत प्रभावी तरीका है।
    6 बड़े नुकसानों को कैसे पहचानें और कैसे दूर करें, यह जानने के लिए कृपया पूरा वीडियो देखें।
    Our Website: www.aytindia.com
    ----------------------------------------------
    For more details and other videos check Following:
    MyTH-camChannel: / @aytindia
    Lean Manufacturing Training Videos: • LEAN Manufacturing
    7 Quality Control Tools | 7 QC TOOLS | 7 Basic Quality Tools or Problem Solving Tools (हिंदी में) : • 7 Quality Control Tool...
    What is TIMWOOD 7 Waste in Lean Manufacturing in Hindi (हिंदी में)| TOOL for COST REDUCTION by 50% : • What is TIMWOOD 7 Wast...
    What is KAIZEN CONCEPT of LEAN: Continuous Improvement in Hindi (सीखे काइजन निरंतर सुधार हिंदी में) : • What is KAIZEN CONCEPT...
    Howto Install, Use AAROGYA SETU APP आरोग्य सेतु APP क्या है और इसे कैसे इस्तेमाल करे FIGHT CORONA : • Howto Install, Use AAR...
    ---------------------------------------------------
    Music: www.bensound.com
    -------------------------------------------------------
    About Myself: Shakir Mohd (B.TECH)
    • I am a B.Tech in Mechanical Engineering
    • I have total working Experience of Around 7 Years in Training, Execution and Implementations of Various Lean Tools and Techniques (such as VSM, KAIZEN, TPM, 5S, Visual Management, Poka-yoke, SMED etc.) in approx. 100 Units.
    • I have a wide exposure for Implementation of Lean Manufacturing Tools & Techniques to different industries like Automobile, Engineering, Food Industries, Leather Handicrafts, Leather Garments, Garments, Printing, Packaging, Shoes Industries, Plastic Injection Moulding, Aluminum Die Casting, CNC Machining, Conventional Machining, Tool Room, Press Shop, Fan Industry, Bicycle Industry, Fabrication & Sheet Metal etc. for improving their Productivity, Reducing Manufacturing cost & Rejection, 5S Levels, Employees Trainings with proper resource utilization and Implementation of various Kaizens (Improvements).
    Key Skills:
    • Value Stream Mapping (VSM), TIMWOOD (Seven Wastages), PQCDSME (Seven Benefits) Productivity Improvement, Time & Motion Study,
    • TPM (Total Productive Maintenance), FUGAI Tags, 8 Pillars of TPM , Elimination of Six Big Losses (SSSMCB) through TPM
    • 5S, KAIZEN, 7 QC Tools, VA/NVA Activities, Root cause analysis, SMED, Safety Improvements, Visual Management, etc.
    ----
    SOME OF MY ONSITE PROJECTs OF TRAINING & CONSULTANCY, COMPLETED/ UNDER-PROCESS ARE:
    Ultratech Cement (4 Plants)- Truck Turn Around Time (TAT) Prject
    Combit Shoes, Bahadurgarh (HR)- Plant Layout Setup Project
    Printsmith (Infinity Advertising Pvt. Ltd.),Faridabad
    MSME- Faridabad Engineering Cluster No.1 (9 Units)- LMCS Cluster
    MSME- Faridabad Engineering Cluster No.2 (6 Units)- LMCS Cluster
    MSME- Faridabad Engineering Cluster No.4 (7 Units)- LMCS Cluster
    MSME- Yamuna Nagar Engineering & Fabrication Cluster (9 Units)- LMCS Cluster
    MSME- Ludhiana Cycle Parts Cluster No.2 (7 Units)- LMCS Cluster
    MSME- Manesar, Leather Handicraft Cluster No.1 (7 Units)- LMCS Cluster
    MSME- Bahadurgarh Footwear Cluster (6 Units)- LMCS Cluster
    MSME- GZB Food Cluster (9 Units)- LMCS Cluster
    Raga Engineers- Core Pins Productivity Improvement Project, Faridabad (HR)
    Raga Engineers- Crack Toyota Project, Faridabad (HR)
    Technomech Industries, Faridabad (HR)
    Woodpecker Systems, Faridabad
    Falcon Vacuum Pumps, Faridabad
    Welcome Footwear, Bahadurgarh
    RKP Packers, Delhi
    Presto Stantest Pvt., Faridabad
    United Cores Private Limited, Faridabad
    PMT Engineers, Faridabad
    UD food Products Pvt. Ltd., Ghaziabad
    GK Industries, Faridabad
    Durga Engineering Works, Faridabad

ความคิดเห็น • 31

  • @waseemahmad3777
    @waseemahmad3777 4 ปีที่แล้ว +1

    Nice Information

  • @Ronduck7
    @Ronduck7 ปีที่แล้ว

    Good information sir

    • @aytindia
      @aytindia  ปีที่แล้ว

      Thank you !!! Keep Watching and sharing

  • @obendrayadav3099
    @obendrayadav3099 2 ปีที่แล้ว +1

    Nice sir

  • @ankit_450
    @ankit_450 4 ปีที่แล้ว +1

    Good

  • @madanlalkalia7646
    @madanlalkalia7646 3 ปีที่แล้ว +1

    Great Sir , nice and knowledgeable

    • @aytindia
      @aytindia  3 ปีที่แล้ว

      Thanks for your feedback. Keep watching and sharing

  • @DeepakKumar-123.
    @DeepakKumar-123. 3 ปีที่แล้ว

    aap bahut hi acche tarike se samjhate ho very nice .sir...

  • @saurabhsingh9316
    @saurabhsingh9316 4 ปีที่แล้ว +1

    thanks for making every topic easy.......thanks sir...plz make more videos......

    • @aytindia
      @aytindia  4 ปีที่แล้ว

      Thanks and Sure..

  • @Aashishthakur11
    @Aashishthakur11 3 ปีที่แล้ว +1

    Its nice, very easy to understand

  • @SKsinghania95
    @SKsinghania95 2 ปีที่แล้ว

    Nice Knolage sir

  • @tkpicture9495
    @tkpicture9495 3 ปีที่แล้ว

    Sir ppap and msa 5 core tool ke bare me v btaye

  • @hamidraza4958
    @hamidraza4958 ปีที่แล้ว

    Sir,16 losses in Production ka v video banaye plz...

  • @M.E.786
    @M.E.786 ปีที่แล้ว

    Great Sir, sir you look like shoaib akhtar of pakistan

    • @aytindia
      @aytindia  ปีที่แล้ว

      Thanks and Keep Watching

  • @AkashDixit-ik1ez
    @AkashDixit-ik1ez 3 ปีที่แล้ว +1

    Sir OEE par bhi ek separate video baniye.

    • @aytindia
      @aytindia  3 ปีที่แล้ว +1

      th-cam.com/video/PD-TPL-5nEc/w-d-xo.html

    • @aytindia
      @aytindia  3 ปีที่แล้ว +1

      th-cam.com/video/PD-TPL-5nEc/w-d-xo.html

  • @somnathbhand7258
    @somnathbhand7258 2 ปีที่แล้ว

    1 unplanned stop me 1 galti lag rahi hai aap bol rahe hai maintenance vale aaye aur bole Humein maintenance karna hai machine khadi kardo yes kaise hota hai , company ka planning hoga na ke kab machine maintenance karni hai
    Har machine ka mentainance plan schedule hota hai

  • @kpeditingcreator6331
    @kpeditingcreator6331 2 ปีที่แล้ว

    Me ek company me kam karta hu mene ek consept nikala he manager model machine karke , so jo TPM, oee , etc.. aap ke sab video dekhe mene or mujhe esi bare me aap se bat karni he sir

    • @aytindia
      @aytindia  ปีที่แล้ว

      Pl send mail on smohd@aytindia.com

  • @NationalTV552
    @NationalTV552 ปีที่แล้ว

    👇👇👇👇👇👇👇👇👇👇👇👇👇👇👇👇👇👇
    👉MHRA (medical and health products regulatory Agency) sir is pr bhi video bnaye
    👆👆👆👆👆👆👆👆👆👆👆👆👆👆👆👆👆👆

    • @aytindia
      @aytindia  ปีที่แล้ว

      sorry iske baare me abhi jankari nhi h

  • @trickymathematics..6036
    @trickymathematics..6036 2 ปีที่แล้ว

    Pdf provide kra do

  • @kishornagare5853
    @kishornagare5853 ปีที่แล้ว

    Display found blurr sir

    • @aytindia
      @aytindia  ปีที่แล้ว

      check your net speed please

  • @kpeditingcreator6331
    @kpeditingcreator6331 2 ปีที่แล้ว

    Sir mujhe aap se ek kam he kya aap ka number mil sakta he sir

    • @aytindia
      @aytindia  2 ปีที่แล้ว

      7011382316