Wired a Commercial Kitchen with Another Professional Electrician

แชร์
ฝัง
  • เผยแพร่เมื่อ 20 ส.ค. 2024

ความคิดเห็น • 43

  • @ryanloop3411
    @ryanloop3411 4 ปีที่แล้ว +5

    Wow, what a nightmare, you did a great job getting everything in sync and sorting it out though...those are the kind of jobs that make you really appreciate what you accomplished.

    • @Petersonelectricllc
      @Petersonelectricllc  4 ปีที่แล้ว

      Thanks, Can't take all the credit, my wife and daughter helped and an older friend that has been in the trade for 40 yrs.

  • @afathersjournal1584
    @afathersjournal1584 2 ปีที่แล้ว +1

    Great job! I am a building contractor. It pays to hire knowledgeable electricians. So basically you had to configure the whole wiring system, on top of time for install. Bet that customer didn't like that $20k bill but at least they know there suppression systems will work in the time of need. I love when I hit complicated snags on my side. That's when you can truly test your skills. Awesome job!

  • @newill7732
    @newill7732 4 ปีที่แล้ว +5

    I just got my license and I really appreciate your vids.

  • @porfiriomagana7166
    @porfiriomagana7166 3 หลายเดือนก่อน

    Great job and thanks for sharing! I have a similar job offer current panels out of space for a shunt trip breaker‘s and electrical panel circuits breakers not marked……

  • @robertlane6675
    @robertlane6675 4 ปีที่แล้ว +2

    Nice video. I enjoy seeing how things get tied into each other.

  • @tonyyglesias7784
    @tonyyglesias7784 2 ปีที่แล้ว

    Great work Josh. Please keep making videos of specialty work like this, I'm in central Florida, just started at a fire protection company.
    Challenging jobs are the fun jobs.
    The more information, the better, keep up the good work.

  • @rocafirme1000
    @rocafirme1000 9 หลายเดือนก่อน

    Beautiful job there guys.

  • @raymorgan76
    @raymorgan76 6 หลายเดือนก่อน

    You are SUPER DOPE bro.... Respect on so many levels.

  • @stevebuchanan5773
    @stevebuchanan5773 3 ปีที่แล้ว +3

    Did i shunt trip break it all, i have seen in restaurants they would shunt the main breaker

  • @goalie2998
    @goalie2998 3 ปีที่แล้ว +2

    Did you have to tie in any co detectors?
    In Massachusetts we have a separate gas solenoid that closes if the co detector in the kitchen trips.
    Also the exhaust has to interlock to allow the solenoid to open.
    It adds another layer of cluster to the f ck. Lol
    I just did a decent job for my shop.
    The construction electricians who roughed the building had no clue.
    The hood was existing with no control cabinet.
    They basically ran a bunch of mc to one spot and labeled them poorly.
    I was sent to the site to program and test the fire alarm. But the site super started picking my brain and I ended up wiring all the hood controls .
    Fun job

  • @69vjuarez
    @69vjuarez 2 ปีที่แล้ว

    Wish i knew how to do restaurants here in Phoenix. Job well done.....

  • @ryguy11794
    @ryguy11794 4 ปีที่แล้ว +5

    quite a shit show but luckily you have the help and resources to get it done. good work

  • @infiniterecycler
    @infiniterecycler ปีที่แล้ว

    Just moved into new kitchen at a school. Gfci breakers on all 20 amp outlets in kitchen per code. Over spring break, most of the breakers tripped. Head electrician at the job told me that will happen during power outage. So he’s telling me if power goes out on weekend, then all the food in reachin coolers and freezers will be lost. Not buying that. I believe something not connected right. My understanding it could happen on a power dimming and that is a power company issue. Waiting on the electrical engineer to assess

  • @heroknaderi
    @heroknaderi 4 ปีที่แล้ว +1

    Good job 👍

  • @Electrician1988
    @Electrician1988 4 ปีที่แล้ว

    Never did a commercial kitchen but it would be nice to actually see a drawing of a basic setup.

    • @Petersonelectricllc
      @Petersonelectricllc  4 ปีที่แล้ว +1

      I showed it on one of these videos, (i think), this job was a mess.

  • @j.f.3980
    @j.f.3980 5 หลายเดือนก่อน

    How much do you charge for system like that on 12' hood and 2 1/2hp exhaust and 1 make up without power on the wall just hood lights and horn flashing emergency light

  • @deepbluewater7714
    @deepbluewater7714 3 ปีที่แล้ว +2

    It may work, Conduit and wiring is a mess. not acceptable.

  • @AngelA-zr9xm
    @AngelA-zr9xm 6 หลายเดือนก่อน

    What type of heat sensor can I use for the exhaust fan commercial venthood kitchen ??

  • @shanebibby6006
    @shanebibby6006 4 ปีที่แล้ว +2

    I guess every fire martial is diff in what they want or nfpa. Ive wired these hoods in the not with the extreme shut downs they would of been going with a seperate system and have the fire alarm just monitor the ansul system. But every place is diff i guess. Good job anyways Josh.

    • @Petersonelectricllc
      @Petersonelectricllc  4 ปีที่แล้ว

      Yah, not sure myself, I think that the weight of this camp being there for over a 100 yrs give some clout.

  • @franksomarriba6719
    @franksomarriba6719 2 หลายเดือนก่อน

    Hello, do you know anyone in Louisiana that can finish the electrical connection to kill the makeup air and leave the exhaust on?

  • @Veteran1129
    @Veteran1129 7 หลายเดือนก่อน

    Just found your video because a store owner asked me to hook up an ansul system, which I've never done but I'm capable with instruction. My issue is, how is the power shut off incase of a fire

    • @GixxerJake
      @GixxerJake หลายเดือนก่อน

      If the fire suppression system is triggered it will actuate a microswitch in the control head of the system.... I'm pretty sure...

  • @TonyGOD-IS-4-LIFE8039
    @TonyGOD-IS-4-LIFE8039 10 หลายเดือนก่อน

    Hi do you have a diagram for installing regular commercial hood /fan
    Electrical part for it
    We need a switch for the light with 20am breaker
    Then sensor
    And fan switch
    Is there some kind a diagram one goes where ?any information will help this is the first time I’m doing it.
    I’m a journeyman for three years
    If you can give me some advice, I would appreciate it

  • @yellow8954
    @yellow8954 4 ปีที่แล้ว

    Nice work

  • @darrinhartford
    @darrinhartford 4 ปีที่แล้ว +1

    Looks like it was definitely a challenge to get all of that straightened out. My only concern would be the LFNC running into the dog house. It doesn't look like it's secured within 12 inches of the box and why not just route it through the existing opening instead of through the side and caulking it? Just a curious newbie, not trying to be a armchair electrician. Great work overall!

    • @Petersonelectricllc
      @Petersonelectricllc  4 ปีที่แล้ว +2

      I did not wire this box, there was three other electrical companies that gave up on this job. They did NOT WANT US to rewire eveything, just pick up the pieces and wire the next 70% that was not in and was not killing the buckeyes.

    • @darrinhartford
      @darrinhartford 4 ปีที่แล้ว +2

      @@Petersonelectricllc Ah, I see, makes sense in that regard then. Thanks for the reply and thanks for posting so much content, I know it makes every job take that much longer to do when you film it, but I do learn a ton from watching your videos!

    • @Petersonelectricllc
      @Petersonelectricllc  4 ปีที่แล้ว +2

      I'm surprised the health dept. passed the flex on the surface of the wall. I think that the State of Co DORA was wanting this passed after three years of waiting and was more concerned of the safety of the employees and the Air handlers turning off and the exhaust vent hoods staying on in three kitchens in the same areas.

  • @hoffmanfiles
    @hoffmanfiles 10 หลายเดือนก่อน

    Did u wire the appliances

  • @iRoyFitness
    @iRoyFitness ปีที่แล้ว

    Can l have you help me diagnose why my exhaust fan is not drawing enough power?

  • @I-am-AJ
    @I-am-AJ 3 ปีที่แล้ว

    U the man

  • @TCB2023.
    @TCB2023. 3 ปีที่แล้ว

    Whats the brand of control box with the relays

  • @pradumanchauhan2886
    @pradumanchauhan2886 8 หลายเดือนก่อน

    Kitchen fire suppression system installation working jobs

  • @barberhvac3438
    @barberhvac3438 ปีที่แล้ว

    I bet you could have added a couple extra contractors, and another HMI, and just created another fan zone all working off the same Captiveaire dcv. Nothing worse than having to figure out what a bunch of knuckleheads did before you got there

  • @pradumanchauhan2886
    @pradumanchauhan2886 8 หลายเดือนก่อน

    Sir vacancy hei

  • @galomendieta3658
    @galomendieta3658 3 ปีที่แล้ว

    Hi do you installed hood?

  • @Testing329
    @Testing329 2 ปีที่แล้ว

    Viva Christo Rey

  • @livell6907
    @livell6907 3 ปีที่แล้ว +1

    Hey man. I'm from denver. Really want to learn the system. Shoot me a message

    • @jesussilvadoray8187
      @jesussilvadoray8187 ปีที่แล้ว

      Hi. Does anyone know how much a hood control panel install would cost?