SEPTA Broad Street Line Action at Hunting Park

แชร์
ฝัง
  • เผยแพร่เมื่อ 30 ก.ย. 2024

ความคิดเห็น • 7

  • @s.s.99
    @s.s.99 2 หลายเดือนก่อน +1

    Here’s the thing that gets me riled up about the Broad Street Line: I’m pretty sure the stations can accommodate like 8 or 10 cars, but they don’t have the ridership to justify running trains of that size.
    Outside of increased security on the trains and in stations, I wonder what major extension would increase ridership, and already has most of the infrastructure along the right-of-way built🤔

    • @ogtripplog
      @ogtripplog หลายเดือนก่อน +1

      BSL cars are 67ft 6in long. A 5 car consist is ideal enough to fit into all the mainline stops. A 6 or 7 car consist would reduce frequency and honestly it's not enough ridership or enough cars for that. However things may change once the Roosevelt Blvd Subway gets built. That would be a much needed Northeastern subway extension in over 50 years and that subway would definitely ease the heavy traffic flow on the Blvd. Last extension was in 1973 further into South Philly.

  • @3on3Genesagood35
    @3on3Genesagood35 4 หลายเดือนก่อน

    Did you know these trains are electric trains 2:01 too

  • @marcuscerdanshow4522
    @marcuscerdanshow4522 5 หลายเดือนก่อน

    Hunting Park . Routes 1 and R buses

  • @Bluvfx_
    @Bluvfx_ 5 หลายเดือนก่อน

    What was those sparks?

    • @Leopessi121
      @Leopessi121 5 หลายเดือนก่อน +1

      Third rail

    • @BobNewbie
      @BobNewbie 5 หลายเดือนก่อน

      On that side I can recall sparks from passing trains for many years, especially on the local track