MRUV 134: Roundhouse Area Work- Scenery & Details

แชร์
ฝัง
  • เผยแพร่เมื่อ 29 ก.ย. 2024
  • Happy New Year! Since I posted a Christmas Day update, I thought it was only proper to also post one on New Year's Day.
    I continued working in the Roundhouse area. I installed Shorty's machine shop, which I show and also describe the modifications/additions I made to the structure. The area behind the roundhouse was made ready for scenery and the initial layer of ground covering is in place.
    I also took a leap of faith and decided to paint/weather the Walther's turntable bridge. I very carefully masked all critical areas and gave it a quick coat of a Rustoleum "grimy black" Primer. I then weathered with chalks and after adding a figure installed the operator shed. For possible future use I did add a means to connect to the top of the arch for electric power lines.
    I did some other detailing and scenery items, slowly working down the engine service area.
    I again want to thank everyone for watching these babble-filled updates throughout 2018 and I look forward to a productive 2019.
    Thank you for watching. If you enjoyed, please Like, Share and if not a subscriber please Subscribe so you don't miss any future updates, Product Information Videos, and other Model Railroading related videos!

ความคิดเห็น • 214