HAD TO STOP THE APPRENTICE - FIRST BOARD SWAP

แชร์
ฝัง
  • เผยแพร่เมื่อ 26 ก.ย. 2024
  • APPRENTICE FIRST EVER BOARD SWAP, INCLUDING ISOLATION AND LOCK OFF
    COMMENT YOUR VIEWS BELOW

ความคิดเห็น • 59

  • @GroovyG0
    @GroovyG0 4 หลายเดือนก่อน +10

    Noticed that Ash, whilst proving dead, applied probe first to the line terminal, (5.46), leaving the other probe waving around. If the circuit were not dead, there would then be a voltage present on the unattached probe, so wouldn't it be wiser to place first probe onto earth and the second to each of the lives in turn?

    • @brightsparkmid
      @brightsparkmid  4 หลายเดือนก่อน +4

      Very good observation, you are correct, it is much better to go onto the cpc first,

    • @llVIU
      @llVIU 3 หลายเดือนก่อน

      this kid has been sticking his nose into too many books. Don't worry, you'll gain some confidence after your first few years, and you'll learn not to wave around your tools in the pannel. I mean, what if a screw falls down between 2 phases? I got a pannel at work with the plastic cover missing, exposed 3 phase terminals at foot level, no warning label, nobody knows but me. I'm waiting for an accident to happen.
      Let me teach you what is far more important than this white english crap of "put muh lead on muh earth first bla bla", you need to first test the terminals WHEN THEY'RE LIVE, which these monkeys didn't. See if you got a neutral/earth fault, see if you placed the lead correctly... many times the lead will show 0 just because the screw on the breaker has some special coating on it. If you put the lead on top of the screw, on the side, it will show 0, you need to place it inside the screw and twist the lead around, not just lightly touch it.
      But hey, theory and practice are 2 different things.

    • @alerighi
      @alerighi 2 หลายเดือนก่อน

      Would it be a dangerous current tough? Probably there is a very high impedance in the tester itself (if it's the same of a multimeter, like 10Mohm), not enough to give you any shock. Anyway better to be on the safe side.

  • @nathanbaldini8622
    @nathanbaldini8622 3 หลายเดือนก่อน +2

    It's great to see you letting your apprentice have a go and teaching him along the way. Keep up the good work mate 👍

    • @brightsparkmid
      @brightsparkmid  3 หลายเดือนก่อน +1

      I feel it’s the best way to learn, I have been doing this long enough to be able to fix anything he could possibly mess up. Thanks for the positive comment

  • @SME_Ste
    @SME_Ste 4 หลายเดือนก่อน +6

    Nice little vid. Made me chuckle though as you criticised the DB you took out as being an unknown brand then replaced it with a DB from Live Electrical. The original DB was a Lewden branded Controlgear Direct.

    • @brightsparkmid
      @brightsparkmid  4 หลายเดือนก่อน +1

      So originally we were fitting a fusebox but this is on back order from them for 8 weeks, but we were able to provide SPD and a decent link out atleast lol

    • @peterigrenyi9176
      @peterigrenyi9176 3 หลายเดือนก่อน +1

      Was gonna say not helped it with that board lol. Could use nice Hager.
      Also fitting TP+N board was a bit of a waste wasnt it. Supply cable 2 core only?
      Could have just put on Single phase board....
      What size was the supply cable? Unless it was 25mm armoured i fail to see the point of 25mm tails extending it into the board...

    • @brightsparkmid
      @brightsparkmid  3 หลายเดือนก่อน +2

      25mm SWA
      Customer wanted it to be a like for like size etc, we did what was asked,
      All well and good fitting Hagar but not when it was priced in fusebox/equivalent

    • @peterigrenyi9176
      @peterigrenyi9176 3 หลายเดือนก่อน +1

      Fair dos if it was 25mm SWA. Looked smaller in the vid.
      As for board, just price Hager to start with😊
      Switch room upgrade will be nice job.

    • @brightsparkmid
      @brightsparkmid  3 หลายเดือนก่อน +2

      @peterigrenyi9176 trust me they are tight 😂 I don’t like Hagar anyway, they make fake AFDD’s and have always been stupid money for no reason until smaller brands started to wash them out check out Dave saverys Chanel about the AFDD issue

  • @imark7777777
    @imark7777777 หลายเดือนก่อน

    Not only that but those towels go through two different holes! No I'm sure the Eddy currents are low but yeah whoever did that did a nice job < sarcasm.

  • @ianwarren8316
    @ianwarren8316 2 หลายเดือนก่อน

    When drilling a box you should de-burr the hole before fitting the gland.
    Makes sure you can get the gland fully screwed tight to flat metal and not stopped by burrs and less likely to cause minor injury to fingers etc if work is altered later.

    • @brightsparkmid
      @brightsparkmid  2 หลายเดือนก่อน +1

      We use accelerate cutters so the are fine tooth, causing little to no burr

  • @Alan_AB
    @Alan_AB 3 หลายเดือนก่อน

    I finished my apprenticeship in 1979. I'm retired now. Things have changed a lot since I was installing boards. My only pet hate is when electricians use impact drivers to tighten/loosen terminal screws. That is not the proper tool for that job. it is too powerful and the terminal screws are usually made of a soft material. It really riles me to see it.
    All the best for that young lad going on with his apprenticeship. Well done.

    • @brightsparkmid
      @brightsparkmid  3 หลายเดือนก่อน +1

      I think if you know the feel of your driver you can quite easily use it to just run the terminal screws up, saves some time in the long run but yes I do agree with over tightening using them,

    • @Alan_AB
      @Alan_AB 3 หลายเดือนก่อน

      @@brightsparkmid Each to their own. I just prefer not to use it. I've seen an RCBO destroyed because ot was over-tightened using one of those things.
      But enough of that. I loved the video otherwise. Reminded me so much of my younger days "on the tools".

    • @brightsparkmid
      @brightsparkmid  3 หลายเดือนก่อน +1

      @Alan_AB yes I can agree with that !
      Glad you did, there will be an interesting solar video out later today ! Take a look

    • @Alan_AB
      @Alan_AB 3 หลายเดือนก่อน +1

      @@brightsparkmid I will indeed. I'm interested in that technology. Thanks for the heads-up.

    • @AndrewStrydomBRP
      @AndrewStrydomBRP 2 หลายเดือนก่อน +1

      Nothing wrong with using it to loosen screws, but tightening is a no no.

  • @Fozzie68
    @Fozzie68 4 หลายเดือนก่อน +3

    Basic 1st step of drilling a hole even with a speed bit like Ashley used, is to DEBURE THE HOLE !!
    I NOTICED that it WASNT DONE. AS HIS IMMEDIATE BOSS , AND FILMING IT ASWEL, I THOUGHT THAT WOULD HAVE BEEN PICKED UP STRAIGHT AWAY , BUT I WAS WRONG AND DISAPPOINTED AND SAD TO SEE !! Ashley 1 word of advice from someone that has been an ELECTRICAL ENGINEER FOR 40 years, BUY YOURSELF A DE-BURRING TOOL. THEY ARE NOT EXPENSIVE, BUT GIVE YOU THE SATISFACTION OF A CLEAN HOLE FOR APPLYING A STUFFING GLAND !!

    • @brightsparkmid
      @brightsparkmid  3 หลายเดือนก่อน +1

      Found that the fine tooth of the armeg bits require virtually no deburing when complete, they are a great tool I agree but only really use them when the big set of hole cutters come out,
      But I take it on board and hold my hands up, yes I should probably be less complacent and ensure all holes are de buried,
      Thanks for your feedback

    • @rowles13
      @rowles13 3 หลายเดือนก่อน

      Lucky apprentice to have a good mentor👏👏👏

    • @tomorichard
      @tomorichard 3 หลายเดือนก่อน +1

      The fine tooth hole hole do not need to be cleaned. De bur police are getting crazy these days

  • @xxDADDYDAYCARExx
    @xxDADDYDAYCARExx หลายเดือนก่อน

    Good man Ash

  • @fionanoeljakebalzan7244
    @fionanoeljakebalzan7244 4 หลายเดือนก่อน +1

    The 7th hole in each earth bar could be used to bridge the 2 earth bars together

    • @brightsparkmid
      @brightsparkmid  4 หลายเดือนก่อน +1

      There is others labeled B for this, even if they were used for that it would be out of sync of the positions still

  • @BenCurry-x1i
    @BenCurry-x1i 2 หลายเดือนก่อน

    Nice work work but does seem mad to fit a three phase board and spd unit for a single phase supply with 4 outgoing ways

    • @brightsparkmid
      @brightsparkmid  2 หลายเดือนก่อน +1

      Customers request mate, not much I could do if that’s what they wanted to pay for then that’s what I’ll charge them

  • @imark7777777
    @imark7777777 หลายเดือนก่อน

    I've not use those particular spice connectors but most of those push in connectors have some sort of release procedure if you need to.
    Think I would've put the tails in trunking but then again they're high up out of the way they so should be OK.

  • @tilidie5272
    @tilidie5272 2 หลายเดือนก่อน

    always enjoy watching these kind of videos, im trying to find someone to take me on for last year as an apprentice but because im an adult learner i dont think anyones interested!

    • @brightsparkmid
      @brightsparkmid  2 หลายเดือนก่อน

      Where are you based?

    • @tilidie5272
      @tilidie5272 2 หลายเดือนก่อน

      @@brightsparkmid Im in Leeds, im currently working in maintainance and doing weekends here and there with a friend for a wider range of experience but ideally an apprenticeship would be best!

  • @johndoe2769
    @johndoe2769 3 หลายเดือนก่อน +3

    There seems to be alot of experts in the comment section as per usual lol

    • @brightsparkmid
      @brightsparkmid  3 หลายเดือนก่อน

      👀 lol

    • @johndoe2769
      @johndoe2769 3 หลายเดือนก่อน

      @@brightsparkmid hand half of them a snips, they wouldn't know how to use it 😅

  • @gregcressey1791
    @gregcressey1791 3 หลายเดือนก่อน

    When drilling be aware no metal shards drop into any breakers or anything it can cause issues or potentially be dangerous if possible use the hoover to prevent it or turn it on the side and drill n clean out. Pal

    • @brightsparkmid
      @brightsparkmid  3 หลายเดือนก่อน

      No breakers in at the time for that exact reason.
      All hovered out prior to power up

  • @GrahamWoodward-ww1zf
    @GrahamWoodward-ww1zf 4 หลายเดือนก่อน

    With the Exel range I open the isolator and visually check total isolation.

    • @brightsparkmid
      @brightsparkmid  4 หลายเดือนก่อน +1

      You can, but the lad was using part of this for his portfolio so had to do it this way

  • @dannyrimmer2717
    @dannyrimmer2717 2 หลายเดือนก่อน

    I would of left room at the bottom for additional circuits in the future 🙈 no one ever cares about the next guy

    • @brightsparkmid
      @brightsparkmid  2 หลายเดือนก่อน

      Not much more that could go in there to be honest

  • @llVIU
    @llVIU 3 หลายเดือนก่อน

    but but but but what if you had a major fault and you had single phase in short circuit with neutral and earth huuuuuuuuuuh? your proving unit wouldn't do anything. My magic pen would. Or what if you had backfeed from a nearby building that only goes on at certain intervals?

    • @brightsparkmid
      @brightsparkmid  3 หลายเดือนก่อน

      That’s what the stages of testing are designed for, 3 step test on single phase
      10 step test on three phase

  • @michaeltye8853
    @michaeltye8853 3 หลายเดือนก่อน

    Did you Torque the terminals ?

    • @brightsparkmid
      @brightsparkmid  3 หลายเดือนก่อน

      Yes several ugga duggers per one, yes all was torqued up upon testing

  • @llVIU
    @llVIU 3 หลายเดือนก่อน +1

    HAD TO STOP THE APPRENTICE (GONE WRONG GONE SEXUAL) (COPS CALLED) (VIRAL)

  • @BenCurry-x1i
    @BenCurry-x1i 2 หลายเดือนก่อน

    Nice work work but does seem mad to fit a three phase board and spd unit for a single phase supply with 4 outgoing ways

  • @TechOne7671
    @TechOne7671 3 หลายเดือนก่อน

    Good job lad. Why would you replace it with a tpn board when it only has a single phase supply ? A lot of expense for three single phase circuits.

    • @brightsparkmid
      @brightsparkmid  3 หลายเดือนก่อน

      Customer request mate

  • @tomorichard
    @tomorichard 3 หลายเดือนก่อน

    Jesus I thought fusebox was bath in basement. What is that thing.
    Great work ash keep it up 👍