Hi. Thanks fotrthe video. From yout video I see that the sample size that we see on the lot is taken from the first characteristic. May I ask what happens when I have more characteristics with dufferenr sampling schemes (example first one fixed 100%, second one fixed 90%). Thanks.
Hi, is there any which way that i can re assign inspection plan to an inspection lot type 01 which already made Usage Udecision?, hence i dont want created a new lot. As my research, there is no way to cancel sample (QAC3) of inspection lot with UD status.
@@YASHTOUCH I have created the sampling scheme and also sampling procedure. However, when i try to calculate the sampling size by clicking the calculator, the sample size automatically calculate 100% inspection instead of the sample size.
@@dayangsofea5895 I think you should check your inspection plan was assigned to Inspection lot, may be the previous Inspection plan was assigned it has sample procedure use sample type 100% inspection. You also use Tcode QAC3 for cancel sample determination has assigned to inspection lot then you can assignment new inspection plan with new sampling procedure. :)
thanks so much.. You are not a friend, but a guru.. :D
Thanks
Very helpful and clearly explained. Thank you so much.
Welcome...
Very well presented. Love this channel.
Thanks
Hi. Thanks fotrthe video.
From yout video I see that the sample size that we see on the lot is taken from the first characteristic. May I ask what happens when I have more characteristics with dufferenr sampling schemes (example first one fixed 100%, second one fixed 90%).
Thanks.
Hi, could you please mail me your exact requirement, I will provide you the solution.
Nice Video. Can you please provide me inspection type excel sheet.
You are doing really good work
Thank you so much......
Valuation mode is grey out
@@YASHTOUCH can I get your number
7892125862
Reduced and tightened severity only work with DMR??
What if only normal severity is used and we are not using DMR
Hi, is there any which way that i can re assign inspection plan to an inspection lot type 01 which already made Usage Udecision?, hence i dont want created a new lot. As my research, there is no way to cancel sample (QAC3) of inspection lot with UD status.
Hello,
Could you plz send me your exact requirement with proper screenshot if possible , accordingly i will provide you solution.
very informative
Glad you think so!
Thanks for the video...could you please make a video on Dynamic modification rule???
Sure.......
I followed your steps and during the creation of inspection lot, after pressing calculate, its still inspects 100% required.
i am not getting ur point. plz explain clearly.
@@YASHTOUCH I have created the sampling scheme and also sampling procedure. However, when i try to calculate the sampling size by clicking the calculator, the sample size automatically calculate 100% inspection instead of the sample size.
@@dayangsofea5895 I think you should check your inspection plan was assigned to Inspection lot, may be the previous Inspection plan was assigned it has sample procedure use sample type 100% inspection. You also use Tcode QAC3 for cancel sample determination has assigned to inspection lot then you can assignment new inspection plan with new sampling procedure. :)
Thanks
Hi, I have subscribed and liked because its really helpful. Please upload a video for calibration process
and sample drawing.
Thanks
Hi very informative videos. Do you give one on one training as was interested in SAP QM ? Urgent reply will be highly appreciated
Kindly mail me your requirement on Email id - yashrajinamdar90@gmail.com
Nice Video. Can you elaborate more on Sampling Scheme and how C1-D1; C2-D2; ... ; Cn-Dn values work in result recording.
Sure...
Yes please!!! can you create separate video for that! :)
Sure...
Meanwhile u like ,subscribe the channel and share with your friends
Pls share videos for Dynamic Modification rule and Sampling Drawing Procedure
Will upload soon. Thank you
I have subscribed your channel, please make video on Dynamic modification rule
Thanks .sure I will make videos on all QM topics .
please make video on dynamic modification rule
Sure....
Can you please explain , Dynamic modification rule???
Sure,I will upload all PP QM videos periodically .meanwhile you like,subscribe the channel and share with friends.