KATITO - AHERO INTERCHANGE LATEST DRONE VIEW

แชร์
ฝัง
  • เผยแพร่เมื่อ 18 ก.ย. 2024
  • Katito’s strategic positioning that lies on two major highways, Kisumu - Ahero - Isibania and Kisumu - Homa Bay provides it with the advantage to blossom into a new vibrant commercial hub that will change the way of doing business within the region. #Katito #Ahero #Interchange #Drone #Kisumu #Nyakach #Kendubay #Kisii #Isebania #katitotown #Aherointerchange #Aherotown
    With enough room for expansion in terms of land accessibility, major infrastructural developments resulting from the newly acquired town status are expected to unlock the economic potential of Nyakach Constituency.
    Moving forward, the town will have its own development budget from the Kisumu county exchequer and will be fit to seek for investors and development partners. According to the Governor, the County Government has already identified a contractor to improve the infrastructure of the market as a start and as a show of commitment by his administration. He said his government will continue to make deliberate allocations to improve the infrastructure of all urban centres apart from seeking partnerships with development partners.
    In addition, a detailed boundary delineation exercise for all towns within the county will soon be rolled out with the support of State Department of Housing and Urban Development and Katito town will be among those whose boundaries shall be established.
    The Isebania-Mukuyu-Kisii-Ahero Road project is approximately 172 kilometres and it traverses four counties; Migori, Kisii, Homa Bay and Kisumu. The project starts at Ahero junction on B1 road. It then moves in a southerly direction via Katito, Onyuongo, and Nyabondo to Sondu. At Sondu it takes a south westerly direction via Kabondo, Ringa, Ober to Oyugis where it meets C26.From Oyugis it moves in a southerly direction via Mosocho and Nyamataro where it meets B3 road within Kisii town where it changes direction and moves in a south westerly direction via Suneka, Gesonso, Gasero, Kamagambo, Rongo, Ranen, Awendo, Uriri, Kakrao near Mukuyu, Migori and terminates at the Isebania border (Sirare). The major market/town centres traversed in the southerly direction include Ahero, Awach, Katito, Onywongo, Sondu, Chabera, Kadongo in Kabondo-Kasipur, Ringa, Oyugis, Mosocho, Nyakoe, Kisii, Suneka, Kamagambo, Rongo, Gucha, Ranen, Sare (Awendo), Uriri, Kakrao(Mukuyu), Migori, Isebania and Nyabikaye.
    The project road condition has deteriorated over the years due to increasing transit traffic on the road. Currently, the road carriageway width measures 4-5m wide, and increasingly is becoming a major constraint for the main economic activities within the Lake Victoria basin.
    Traffic accidents have increased due to the narrow and heavily potholed road condition; most regional public transport vehicles have diverted away from this route leading to limited transport service to the populations served directly by the highway. It now requires a much stronger pavement and improved geometric features.
    The rehabilitation of the Isebania-Kisii-Ahero (172km) section of the Tanzania-Kenya-South Sudan Corridor will facilitate cross border movement of passengers and freight, and further enhance access to regional markets, and to social and economic centers as a result of the additional upgrading of the 75km of feeder roads contiguous with the main trunk road linking the project road with markets, social and administrative centers such as the: Oyugis-Kendu Bay road (19.5km), Nyachenge-Tabaka Ogembo road (15km), Sondu-Nyabondo road (6km), Oyugis-Gamba road (7km), Suneka-Rangwe road (18km), and Misambi-Ekerenyo road (11km). The road improvement project will entail 5m wide service roads on both sides of the road at major trading centers along the project corridor to enhance accessibility to businesses.
    The improved road geometrics and enhanced pavement structure will go a long way in raising the level of service for the transit traffic.
    Other components under the highway project include: establishment of Roadside Traffic Crash Trauma and Injury Recovery Centre at Nyabondo hospital consisting of: a new surgical unit, medical emergency equipment, including provision of five (5) ambulances, post-crash counseling unit, and water supply points at Nyabondo hospital and to the surrounding community.
    Project cost KSHS 19.5 billion.
    Drone shot done by: Collo Kwala
    Please SUBSCRIBE, like the video and SHARE wherever you can!
    I own the RIGHTS to this footage, DO NOT copy and re-upload this video otherwise COPYRIGHT strikes will be made.
    To make sure you don't miss any of my videos
    on this channels please :
    Subscribe here: / jarunda
    I would love to connect with you!
    Instagram: / jarunda.ke
    Facebook: / jarundake
    Twitter: / jahrunda
    📞 Call Me: 🇰🇪 +254750246969

ความคิดเห็น • 26

  • @emilynatoh8433
    @emilynatoh8433 11 หลายเดือนก่อน +1

    Katito my home

  • @bilgramaranda6810
    @bilgramaranda6810 11 หลายเดือนก่อน

    From Kisii to Ahero with love

  • @mercelinearemo
    @mercelinearemo 11 หลายเดือนก่อน +1

    Nice coverage...Rest well Wuod Mbita Rusinga

  • @violetakinyionyango570
    @violetakinyionyango570 11 หลายเดือนก่อน

    This is awesome. Jarunda I have a cousin who does everything videography. Can you help him get known?

  • @willymarenya1067
    @willymarenya1067 11 หลายเดือนก่อน

    These was great work rip COLLO KWALA

  • @EdmundSylvanObumba
    @EdmundSylvanObumba 11 หลายเดือนก่อน

    This is so calming.

  • @mulageophrey2533
    @mulageophrey2533 2 ปีที่แล้ว +1

    Nice video...just saw my home

  • @joesafe7094
    @joesafe7094 2 ปีที่แล้ว

    Thank you. That's my home. Now keep us updated on this project.

  • @melixwonder7051
    @melixwonder7051 2 ปีที่แล้ว

    Nice coverage

  • @axebleed8221
    @axebleed8221 2 ปีที่แล้ว

    💎💎

  • @mercylineauma9145
    @mercylineauma9145 11 หลายเดือนก่อน

    Good job ja Malaria!

  • @vincentogola8776
    @vincentogola8776 2 ปีที่แล้ว

    Nice one, just saw AFA past ahero junction

  • @phenwicksasher5099
    @phenwicksasher5099 11 หลายเดือนก่อน

    Ahero Dala

  • @ongoradhiang
    @ongoradhiang 11 หลายเดือนก่อน

    May He rest well with the angels.

  • @davidodhiambo4841
    @davidodhiambo4841 2 ปีที่แล้ว

    Ayueyo rc on your way to ayueyo canteen

  • @shulestuff
    @shulestuff 2 ปีที่แล้ว +1

    KNHA should pay you

  • @annea5781
    @annea5781 ปีที่แล้ว

    Still looking for the interchange 😳🙈

  • @treezerkochieng9629
    @treezerkochieng9629 11 หลายเดือนก่อน

    😭😭😭😭😭😭😭😭Nind gi kwe nyakewa.

  • @jaameh
    @jaameh 2 ปีที่แล้ว

    Ber ndii Mano pacho dala

    • @bawuonda79
      @bawuonda79 2 ปีที่แล้ว

      The worst mistake they have done is to ignore putting culverts along misambi chabera stretch leading to people's homes and churches

  • @musanasulaiman1027
    @musanasulaiman1027 2 ปีที่แล้ว

    And where is Ringa

  • @stmonicaschurchdandora
    @stmonicaschurchdandora 2 ปีที่แล้ว

    The place looking good. Can I get a piece of land to buy around this place

    • @hochiminh9884
      @hochiminh9884 2 ปีที่แล้ว

      Are you Luo?

    • @barrythetraveller102
      @barrythetraveller102 2 ปีที่แล้ว

      @@hochiminh9884 this is irrelevant...what if he is not and a prospective Investor?

  • @JAREDOUMA-pc6pz
    @JAREDOUMA-pc6pz ปีที่แล้ว

    Aneno ndara ouom ndi

    • @Jarunda
      @Jarunda  ปีที่แล้ว

      Ndara lich