ไม่สามารถเล่นวิดีโอนี้
ขออภัยในความไม่สะดวก

Type of Formwork (Shuttering) for Concrete Work & Its Measurement as Per CPWD Norms.

แชร์
ฝัง
  • เผยแพร่เมื่อ 25 ต.ค. 2020
  • #civilengineerstraininginstitute #CivilGuruji
    Type of Formwork (Shuttering) for Concrete Work & Its Measurement as Per CPWD Norms.
    Job Detective :- www.civilguruj....
    Get Brief Detail About Job Detective :-
    www.mediafire.c....
    Use Coupon Code :- GURUJI
    CALL NOW :- 9111001234
    Website :- www.civilguruj...
    Download our Latest Version App:- play.google.co....
    Corporate Training Course:- www.civilguruj....
    GURUJI Ka खजाना :- www.civilguruj....
    ABOUT THIS VIDEO
    In this video Er. Mayank Saini discuss about the Type of Formwork (Shuttering) for Concrete Work & Its Measurement as Per CPWD Norms.
    Propping and Centering : All propping and centering should be either of steel tubes with
    extension pieces or built up sections of rolled steel.
    1) (a) Centering/Staging : Staging should be as designed with required extension pieces as approved by Engineer-in-Charge to ensure proper slopes, as per design for slabs/ beams etc. and as per levels as shown in drawing. All the staging to be either of Tubular steel structure with adequate bracings as approved or made of built up structural sections made form rolled structural steel sections.
    (b) In case of structures with two or more floors, the weight of concrete, centering and shuttering of any upper floor being cast shall be suitably supported on one floor below the top most floor already cast.
    (c) Form work and concreting of upper floor shall not be done until concrete of lower floor has set at least for 14 days.
    2) Shuttering: Shuttering used shall be of sufficient stiffness to avoid excessive deflection and joints shall be tightly butted to avoid leakage of slurry. If required, rubberized lining of material as approved by the Engineer-in-Charge shall be provided in the joints. Steel shuttering used or concreting
    should be sufficiently stiffened. The steel shuttering should also be properly repaired before use and properly cleaned to avoid stains, honey combing, seepage of slurry through joints etc.
    (a) Runner Joists: RSJ, MS Channel or any other suitable section of the required size shall be used as runners.
    (b) Assembly of beam head over props. Beam head is an adopter that fits snugly on the head plates of props to provide wider support under beam bottoms.
    (c) Only steel shuttering shall be used, except for unavoidable portions and very small works for which 12 mm thick water proofing ply of approved quality may be used.
    FORMWORK DETAILS SPECIFICALLY.
    1. Timber Formwork:
    Timber Types of formwork was one of the first and still most used types of formwork in the construction industry. It is assembled on-site and is the most flexible types of formwork. However, before using timber formwork, its condition must be checked carefully, making sure it is free of termites.
    2.Plywood Formwork:
    Plywood types of formwork is an unnatural manufactured wooden sheet available in different thickness and size used in formwork for the concrete member. It is strong enough, durable and lightweight. Plywood is one of the most used materials for sheathing, decking and linings in shuttering.
    3. Steel or Metallic Formwork:
    Steel formwork includes panels fabricated out of thin steel plates fixed along the edges by small steel angles. The panel units can be held together using suitable clamps or bolts and nuts. This types of formwork mostly used in bridge construction work.
    4. Aluminum Formwork
    Aluminium types of formwork are very similar to steel formwork. The main difference is that aluminium has a lower density than steel, which makes formwork lighter. Aluminium also has a lower strength than steel, and these criteria must be considered before using it in the construction project. This formwork is economical if large numbers of repeating usage type of projects are made in Construction. The main disadvantage is that no alteration is possible once the formwork is constructed.
    5. Plastic Formwork:
    Plastic formwork is executed by interlocking panels or modular systems, made of lightweight and robust plastic. Plastic formwork works best in small projects consisting of repetitive tasks, such as low-cost housing estates. It can be used for simple concrete structures.
    6. Coffor Formwork:
    Coffor is a stay in place formwork system. It is consist of two filtering grids which is reinforced by vertical & horizontal stiffeners and linked by articulated connectors which can be folded to transport on-site. Coffor remains in place after the concrete is poured and acts as reinforcement. Coffor is transported to the site prefabricated from the factory. This types of Formwork shutter can be used for any type of structure like a house, multistory buildings etc.
    Mainly the types of formwork used in construction based on the structural components are:

ความคิดเห็น • 44

  • @faiyazalam9
    @faiyazalam9 3 ปีที่แล้ว +3

    What a class bhai jaan dil khus ho gya aur ye lifetime mind me bas jayega

  • @faiyazalam9
    @faiyazalam9 3 ปีที่แล้ว +1

    Aise hi aaplog help krte rhe student sab ko aur fresher ko

  • @siddharthshah9945
    @siddharthshah9945 3 ปีที่แล้ว +3

    Useful info sir plz make 2nd part too...🙏🙏

  • @TheSumit5555
    @TheSumit5555 3 ปีที่แล้ว +1

    Bhut Achi video sir for us and we are very thankful Mayank sir

  • @rahulrajan1864
    @rahulrajan1864 3 ปีที่แล้ว +1

    Civil guru ji is the best way

  • @vikram1111ful
    @vikram1111ful 3 ปีที่แล้ว +2

    Thanks for the important knowledge.
    Mr. Mayank

  • @Rehankhan-yj7ou
    @Rehankhan-yj7ou 3 ปีที่แล้ว +2

    The way you teach Mayank sir is very good.
    thanks for this type of knowledge (civil guruji)❤️

  • @gouravpanwar4222
    @gouravpanwar4222 3 ปีที่แล้ว +2

    लगे रहो भाई

  • @vipinchaudhary7169
    @vipinchaudhary7169 3 ปีที่แล้ว +1

    Superb knowledge sir 👌👌
    Make a video on foundation formwork

  • @juganuchandanshive1637
    @juganuchandanshive1637 ปีที่แล้ว +1

    its स्टेजींग (stage)

  • @ManojKumar-gt4ct
    @ManojKumar-gt4ct 3 ปีที่แล้ว

    Good morning
    Very nice explaining
    Thank u very much

  • @nadeemkhan-jc3eh
    @nadeemkhan-jc3eh 3 ปีที่แล้ว +1

    Are waaa bhai good bro

  • @MDMAKhanVlogs
    @MDMAKhanVlogs 3 ปีที่แล้ว +1

    Tunnel formwork ke bare me bataye sir,🙏🙏🙏

  • @vikassaini4538
    @vikassaini4538 3 ปีที่แล้ว

    Good video provide for fresher

  • @SanjuYadav-yq3uf
    @SanjuYadav-yq3uf ปีที่แล้ว

    Stair ka suttering civil guruji please

  • @divyanshukumar4983
    @divyanshukumar4983 3 ปีที่แล้ว

    Thanks sir ,2nd part jaldi laye

  • @Yourmentors_bro
    @Yourmentors_bro 3 ปีที่แล้ว

    Bhiya ji,. Aage bdte rho 😍👍👍👍 brilliant

  • @rahulborse8480
    @rahulborse8480 3 ปีที่แล้ว +1

    Make video on latest form work, if you want i will help you.

  • @sudhakarvishwakarma7721
    @sudhakarvishwakarma7721 2 ปีที่แล้ว

    The best knowledge

  • @nilsvlogs2370
    @nilsvlogs2370 3 ปีที่แล้ว +1

    1:11 Shape 🤣🤣🤣

  • @tanusingh3547
    @tanusingh3547 3 ปีที่แล้ว +1

    Waiting for 2 part😌

  • @yogendra3016
    @yogendra3016 ปีที่แล้ว

    Thanks sir

  • @piyushbhawsar7703
    @piyushbhawsar7703 3 ปีที่แล้ว

    Sir plz bring for us deep knowledge of mivan shuttering

  • @rahularora4824
    @rahularora4824 3 ปีที่แล้ว

    Happy to see you bro..

  • @gadadharkhatua9944
    @gadadharkhatua9944 ปีที่แล้ว

    Aluminum form work

  • @rahulborse8480
    @rahulborse8480 3 ปีที่แล้ว

    Kindly upgrade, aluminium form work called monolithic form work.

  • @KishorKumar-jo8gk
    @KishorKumar-jo8gk 3 ปีที่แล้ว

    Sir mivan shuttering itam ki upper video banaiye

  • @vaibhavchavan6040
    @vaibhavchavan6040 3 ปีที่แล้ว

    Waiting for part 2

  • @rahulrajan1864
    @rahulrajan1864 3 ปีที่แล้ว +1

    Sir shuttering ka measuring kaise hota hai

    • @mayanksaini1547
      @mayanksaini1547 3 ปีที่แล้ว

      This will provided as soon as possible.

  • @9998695128
    @9998695128 3 ปีที่แล้ว

    Sir slip formwork k bare me bataye plz...

  • @kirandeepkour5799
    @kirandeepkour5799 3 ปีที่แล้ว

    Explicit Explanation sir

  • @paramkhodiyar1515
    @paramkhodiyar1515 8 หลายเดือนก่อน

    Part 2 kidhar hai yar kal exam hai mera please bata do

  • @varundevsingh5700
    @varundevsingh5700 3 ปีที่แล้ว

    Jai Hind.

  • @mohdzaid6703
    @mohdzaid6703 2 ปีที่แล้ว

    Iska part 2 kahan h

  • @pubgindia2722
    @pubgindia2722 3 ปีที่แล้ว +1

    TUKALI ENGG its staging not stacking lol

  • @Rahul-ey1oq
    @Rahul-ey1oq 3 ปีที่แล้ว

    Sir kb ayega second part?

  • @vikassaini4538
    @vikassaini4538 3 ปีที่แล้ว

    Sir pdf bhi provide kiya kro

  • @trtmaniyar6109
    @trtmaniyar6109 2 ปีที่แล้ว

    Second 🔗links send me sir

  • @kamleshkumar-ku1rz
    @kamleshkumar-ku1rz 3 ปีที่แล้ว

    Sir beam ka foam work ko kya kahte hai shuttering ya centering

    • @mayanksaini1547
      @mayanksaini1547 3 ปีที่แล้ว +1

      Side part shuttering and bottom part centering @kamlesh kumar

    • @mayanksaini1547
      @mayanksaini1547 3 ปีที่แล้ว +1

      Beam Bottom Area ke Lie Centering and beam sides shutteirg... Make Every thing Short and Simple. Good Luck Kamlesh Ji..

  • @rahulborse8480
    @rahulborse8480 3 ปีที่แล้ว

    Hi if you want any help for form work , i will help you.