    Timeline: -
    a). 00:55 : - Introduction of excess demand penalty
    b). 01:38 : - Proposed by distribution companies
    (NBPDCL & SBPDCL)
    c). 02:42 : - Approved by the regulatory commission (BERC)
    d). 03:55 : - Pre-information to the consumers about the tariff change
    e). For updated suvidha app: - th-cam.com/video/Wts8KnVyk6A/w-d-xo.html
    f). 05:43 : - Expert advice regarding load enhancement (Why to choose 4 kW)
    g). 08:38 : - Security deposit and charges related to load enhancement

  • @RajeevKumar-vq9zt
    @RajeevKumar-vq9zt 4 ปีที่แล้ว +2

    well explained and very helpful. Thank you very much. Pls continue your good work for general public

  • @academyofcommerce1943
    @academyofcommerce1943 4 ปีที่แล้ว +1

    Again a great job
    Bahut confusion hai logo me
    Literally they are abusing co. Staff.
    Hope this will help.
    Good wishes for you 🌱

  • @fatehram4192
    @fatehram4192 2 ปีที่แล้ว

    अति उत्तम रचना भाई

  • @swapnilthali9041
    @swapnilthali9041 2 ปีที่แล้ว

    Bohot badhiya.

  • @TAKLU_BACCHA
    @TAKLU_BACCHA 2 ปีที่แล้ว

    नाइस वीडियो 🙏

  • @nifty_banknifty_trader
    @nifty_banknifty_trader 3 ปีที่แล้ว +1

    Sir advanced consumption charges kya hai

  • @PANKAJKUMAR-yv9ti
    @PANKAJKUMAR-yv9ti 4 ปีที่แล้ว +1

    Nice Video

  • @alokanand2911
    @alokanand2911 4 ปีที่แล้ว +1

    Too good

  • @alokanand2911
    @alokanand2911 4 ปีที่แล้ว +1

    Too good that help too much

  • @shahnawazkhan1950
    @shahnawazkhan1950 3 ปีที่แล้ว +1

    Sir mai Patna se ho or mera smart meter lag h bill buht aa raha h 2kw ka meter h to kya kar chahiye 4ya 5 din mai 500 hundred ka recharge karna padta hai kya Karen Khush solution de please ?

  • @rajbardhansingh5051
    @rajbardhansingh5051 4 ปีที่แล้ว +1

    Very helpful..

  • @veerchhatarashal4357
    @veerchhatarashal4357 4 ปีที่แล้ว +1

    Good job brother

  • @virendrasinghuikey6058
    @virendrasinghuikey6058 2 ปีที่แล้ว

    Mera ghar ka.0.77kw h aur metre reading 250 ka aa rha h load badhne ke liye penality lgega lgbg kitna penality lgega aur load kitna badhna chaiye urban area domestic purpose ke liye

  • @rohitpandey3234
    @rohitpandey3234 ปีที่แล้ว

    Mishra ji namaskar mera 7.5hp ka motor kitne kw ka connection lena chahiye plz bataye

  • @amankhatri9704
    @amankhatri9704 3 ปีที่แล้ว +1

    sir mere yaha vse to ac fridge washing machine sab hai
    aaj kal vo log bht chalaan karne pe nikle hue hai
    ac lage hue saal bhar ho gya to unke agar mere ghar aake chalaan karne se phle me office jake apna load badva lunga to mere office me to mere khilaf case ya chalaan to nhi banega na
    aur kya load 2 se 3 karane me bill bhi jada aaega pls reply pls sir
    im from mp

    • @Arushfundamentals
      @Arushfundamentals  3 ปีที่แล้ว +1

      Yes, aap pahle hi office se load badha lijiye.

  • @ayushkumar85
    @ayushkumar85 4 ปีที่แล้ว +1

    Is there any electrical equipment which can take the electricity from 2 phase and simultaneously pass the electricity to 2 electricity meter and further both the phase is passed through 1 stabilizer in the same house .. purpose is to lower the electricity cost .. but the problem is that if the electricity is cut in any of the 2 phase the stabilizer will pull electricity from 1 phase passing through 1 meter (extra cost will occur as passed electricity in that phase is half the house requires) .. So could you please tell me of the equipment that will take the electricity from 2 phase and if electricity is cut in any of the 2 phase the equipment will pull the electricity from 1 phase but pass it to 2 electricity meter in the house?????

    • @Arushfundamentals
      @Arushfundamentals  4 ปีที่แล้ว +1

      According to Indian electricity act and distribution supply codes of different states, only three phase and single phase connections are allowed with separate three and single phase meter respectively. Further, output of any two meters shouldn't interface with each other and should not supply any common electrical load.

  • @sourabhmazumder8610
    @sourabhmazumder8610 3 ปีที่แล้ว

    In Assam the maximum limit for Single Phase connection is 4.99kW. Is there any problem if I opt for 4.99kW or 4.95kw? I am ready to bear the fixed charges i.e ₹50 (50×5=₹250), thats not a problem. Any other problems?

  • @rakesh.bestdrverma7982
    @rakesh.bestdrverma7982 3 ปีที่แล้ว

    Thank sir

  • @Rehanz_p9t
    @Rehanz_p9t ปีที่แล้ว

    Hello sir mai Lucknow se hu or mere ghar me 1 kw ka meter laga h or mai. 1.5 ton ka a.c or ghar me jo bhi zaruri home appliances hote h refrigerator Washing machine etc use hote h to mai kitne kw tak ka meter lagau kyuki electricity bil bht zada ata h plz rply

  • @gursharansingh2911
    @gursharansingh2911 3 ปีที่แล้ว

    Sir m punjab se ho mann lo m 4kw kar leta ho lodd or mara 2 munth ke bil me koe vi unet nahe h to mara ketna bill Ae ga

  • @sumitraj5300
    @sumitraj5300 7 หลายเดือนก่อน

    Sir mera bpl connection hai, usmein ham load badhana chahte Hain kaise hoga suvidha app se nahin hota hai, smart metre mein bahut jyada bil banaa deta hai

    • @Arushfundamentals
      @Arushfundamentals  7 หลายเดือนก่อน

      लोड बढ़ाने पर category change होगा और आप APL में आ जाएंगे। बिजली ऑफिस से कराना होगा।

  • @Satishkumar-o6s2u
    @Satishkumar-o6s2u ปีที่แล้ว

    What is the max limit in single phase connection

  • @sarkaricafe
    @sarkaricafe ปีที่แล้ว

    Pay kab karna hota hai load ka kyuki app se load badhate waqt to nhi manga

    • @Arushfundamentals
      @Arushfundamentals  ปีที่แล้ว

      Next बिल में चार्ज होगा।

  • @neyazahmad6785
    @neyazahmad6785 3 ปีที่แล้ว

    Sir meter defect hai aur billing 2 sal se MD pr hi ban rha h rural area me...meter change karwana jaruri hai kya?

  • @dhamalmusicalgroup5895
    @dhamalmusicalgroup5895 2 ปีที่แล้ว +1

    स्मार्ट मीटर का जो एप्लीकेशन है उसमें लोड कैसे बढ़ा सकते हैं

    • @Arushfundamentals
      @Arushfundamentals  2 ปีที่แล้ว

      सुविधा App से load बढ़ाएं।

  • @deepankaryadav547
    @deepankaryadav547 3 ปีที่แล้ว

    Sir mere 2 kw load ha,jisma 1.5 ton spliit ac ,1 ton ac,washing machine,mixer grinder,ro,5 light 4 fan ??Kya mujha badvana hoga load

    • @Arushfundamentals
      @Arushfundamentals  3 ปีที่แล้ว +2

      Han. Total 4 kW karwa lijiye

    • @deepankaryadav547
      @deepankaryadav547 3 ปีที่แล้ว

      @@Arushfundamentals thank you

    • @viveksinghrajput1710
      @viveksinghrajput1710 2 ปีที่แล้ว

      Load increase krwana better option h
      Ya alg 1.5 ton ac ka alg s 2 kwh ka metre le lu

    • @Arushfundamentals
      @Arushfundamentals  2 ปีที่แล้ว

      Load increase करवाना बेहतर है।

  • @rahulroy1808
    @rahulroy1808 2 ปีที่แล้ว

    Mera currently 1 kw connection hai bihar me, smart prepaid meter, excess demand 1.06 ka aa rha hai garmi me aur kabhi nhi aata hai, mujhe load kitna increase karna chaiye

    • @Arushfundamentals
      @Arushfundamentals  2 ปีที่แล้ว +1

      1 kW और बढ़ा लीजिए।

  • @sunilsrivastava8129
    @sunilsrivastava8129 3 ปีที่แล้ว

    अगर मैं single phase से 3 phase करता हूं तो क्या मेरे बिजली के बिल में भी कोई अंतर आएगा जो यूनिट चार्ज अभी लग रहा है क्या वही यूनिट चार्ज 3 phase के बाद लगेगा।

    • @Arushfundamentals
      @Arushfundamentals  3 ปีที่แล้ว

      Electricity unit rate me koi antar nahi aayega.

  • @vakilahmed4165
    @vakilahmed4165 3 ปีที่แล้ว

    🙏 नमस्कार सर 🙏
    मे दिल्ली में रहता हूं मेरा एनडीपीएल कनेक्शन है कमर्शियल एक किलो वाट का मेरे बिल में ADJUSTMENTS = rs 7760 जुड़ कर आ गए हैं इने केसे हटवाए एनडीपील से please reply me 🙏🙏

  • @RajendraAheer
    @RajendraAheer 10 หลายเดือนก่อน

    Sir mera bricks ka kaam h abhi mere. Pass 5 kg ka single phase transformer h muje load 10 se 15 krvana h ab kya krna hoga

    • @Arushfundamentals
      @Arushfundamentals  10 หลายเดือนก่อน

      किस जगह का बिजली कनेक्शन है?

    • @RajendraAheer
      @RajendraAheer 10 หลายเดือนก่อน

      @@Arushfundamentals Rajsamand Rajasthan

    • @RajendraAheer
      @RajendraAheer 10 หลายเดือนก่อน

      Btao na sir

  • @mondaltechnology9061
    @mondaltechnology9061 2 ปีที่แล้ว

    सर एक बात बताइए अगर हम मीटर परचेस कर लेते हैं तो उसका कितना चार्ज लगेगा क्योंकि मीटर का रेंट हर महीने ₹30 करके लगता हैं

    • @Arushfundamentals
      @Arushfundamentals  2 ปีที่แล้ว

      बिहार में मीटर rent नहीं लगता है, ये fix charge है।

  • @dkvlogs4152
    @dkvlogs4152 3 ปีที่แล้ว

    In UPPCL fixed charge is 90 rs for rural in 1Kw connection.

    • @Arushfundamentals
      @Arushfundamentals  3 ปีที่แล้ว

      In this video, I have taken the example of Bihar.

    • @ShubhamSahu-wz1bm
      @ShubhamSahu-wz1bm 3 ปีที่แล้ว

      Sir up me gaanv ka fix charge kitna hota hai

    • @Arushfundamentals
      @Arushfundamentals  3 ปีที่แล้ว +1

      Lifeline consumer ka Rs 50 per month other ka Rs 90 per kW per month.

    • @dkvlogs4152
      @dkvlogs4152 3 ปีที่แล้ว

      @@ShubhamSahu-wz1bm mere yaha 90 rs fixed charge

    • @Arushfundamentals
      @Arushfundamentals  3 ปีที่แล้ว

      Lifeline ke liye 1 kW load and maximum 50 unit per month hi allow hai. Isse jyada hone per rural area me Rs 90 per kW per month hi lagega.

  • @rajgupta-gd8je
    @rajgupta-gd8je 8 หลายเดือนก่อน

    Can i inhance my electricity load from 2 kilowatt to 55 kilowatt.

    • @Arushfundamentals
      @Arushfundamentals  8 หลายเดือนก่อน

      Yes. It's possible. The department would check the infrastructure status and will act accordingly.

  • @SabaNaaz1103
    @SabaNaaz1103 8 หลายเดือนก่อน

    Sir mera new smart prepaid meter lga hai (Bihar)
    Message aya tha k apna load badhayiye
    Toh maine 2 se 4 apply kr dya suvidha app se. Aur approve ho gya.
    Phle fixed charges 5rs per day tha. Par ab 10rs per day ho gya.
    Kya yeh 10rs per day hamesha katega ?

  • @kulveermann9397
    @kulveermann9397 4 ปีที่แล้ว

    Punjab me app nhi chal rha

    • @Arushfundamentals
      @Arushfundamentals  4 ปีที่แล้ว

      Ye app Bihar ke electricity consumers ke liye hai. Agar aapka Bihar me koi connection hai to aap Suvidha app use kar sakte hain.

  • @lovemix3645
    @lovemix3645 2 ปีที่แล้ว

    Sbpdcl me abhi 1phase wala 3kw or 4kw ka fixed charge daily kitna hai?

    • @Arushfundamentals
      @Arushfundamentals  2 ปีที่แล้ว

      घरेलू कनेक्शन का Rs 40 प्रति kW है।

    • @AbhishekRaj-ho3mk
      @AbhishekRaj-ho3mk 2 ปีที่แล้ว

      @@Arushfundamentals mera connection 3kw hai pr 136rs charges ho rha h fixed charge kyo??

    • @Arushfundamentals
      @Arushfundamentals  2 ปีที่แล้ว

      34 दिनों का बिल बना होगा।

    • @AbhishekRaj-ho3mk
      @AbhishekRaj-ho3mk 2 ปีที่แล้ว

      @@Arushfundamentals ooo i didnt notice that yes billing days is 34

    • @AbhishekRaj-ho3mk
      @AbhishekRaj-ho3mk 2 ปีที่แล้ว

      @@Arushfundamentals mere name pe ek domestic connection already h dushra domestic connection hm le skte h kya??

  • @nagendralal1199
    @nagendralal1199 2 ปีที่แล้ว

    Sir ,Please clarify. My online request to enhance the load from 1kv to 2kv by the executive engineer, nbpdcl,supaul, bihar.you replied to recharge the prepaid meter for payment of application fee of rs 89.00.my querry is if i have sufficient balance in smart meter prepaid balance, will they deduct this amount from my balance or I will have to deposit the amount of 89.00 rs separately either online or cash in their office. Thanks,nagendra Kumar lal

    • @Arushfundamentals
      @Arushfundamentals  2 ปีที่แล้ว

      The amount bill be added in the monthly billing as "other charge". It may be different amount because in other charge rebate will also be added. You needn't to do any thing. Just wait for the next monthly bill after this adjustment will be given in credit/ debit/ deferment section.

  • @nagendralal1199
    @nagendralal1199 2 ปีที่แล้ว

    I had applied to enhance load from 1 kw to 2kw,which has been approved by the executive engineer ,nbpdcl,supaul, bihar has approved in the system.now there it is mentioned to deposit 89.00rs as application fee.how I can deposit ,I have prepaid smart meter.

  • @runway4comedy
    @runway4comedy 2 ปีที่แล้ว

    Sir अगर हमने Main लाइन पर 5 किलो वाट का स्टेबलाइजर लगाया है और हमारे घर का का लोड 2 किलो वाट है तो क्या अब यह लोड 5 + 2 =7 मीटर पर Show होगा
    क्या अब हम पर विद्युत विभाग की ओर से पेनल्टी लगेगा
    जब कि हमने मीटर 3 किलो वाट का लगवाया हुआ है
    Please Reply

    • @Arushfundamentals
      @Arushfundamentals  2 ปีที่แล้ว

      Stabilizer मीटर पर कुछ ज्यादा load नहीं देता है।

  • @surendrakhatri56
    @surendrakhatri56 3 ปีที่แล้ว

    राजस्थान में कैशे होगा

  • @praveenkumarvlogs6288
    @praveenkumarvlogs6288 4 ปีที่แล้ว

    1 kilowatt kitne units jala sakte hain

    • @Arushfundamentals
      @Arushfundamentals  4 ปีที่แล้ว

      यूनिट का कोई लिमिट नहीं है। बस आपका एवरेज लोड किसी भी आधे घंटे के पीरियड में 1 किलोवाट रहना चाहिए।

    • @Arushfundamentals
      @Arushfundamentals  4 ปีที่แล้ว

      किसी भी महीने में आधे घंटे का एवरेज मैक्सिमम लोड आपके सैंक्शन लोड से ज्यादा (5% से ज्यादा) होने पर बिल में एक्सेस डिमांड पेनेल्टी लग सकती है।

  • @6254nicu
    @6254nicu 4 ปีที่แล้ว

    1kw se 4kw karwane par security money kitna lagega bihar me,reply soon

    • @Arushfundamentals
      @Arushfundamentals  4 ปีที่แล้ว

      Kindly watch at 8:40 minute of the video for the amount.

  • @jyotiverma6842
    @jyotiverma6842 2 ปีที่แล้ว

    Sir mne kuch din phle ac lagwaya h..2 kilo watt ka meter laga h ..4 kg ke liye application di h ..waha unhone 2000 rupay le liye h..sahi hua kya ??

    • @Arushfundamentals
      @Arushfundamentals  2 ปีที่แล้ว

      बिहार का है क्या?

    • @jyotiverma6842
      @jyotiverma6842 2 ปีที่แล้ว

      @@Arushfundamentals no sir ji m up se hu. .

  • @okokk796
    @okokk796 3 ปีที่แล้ว

    I have 2kw Load
    And
    Home load
    1hp moter
    Washing machine
    Tv led 43 inch
    4 fan celling
    19 bulb 10 Watt
    Ac 1.5 ton
    Mixer grinder
    RO water purifier
    Mujhe load enhancement karna chahiye ya nahi abhi 2kw h

    • @Arushfundamentals
      @Arushfundamentals  3 ปีที่แล้ว +1

      Considering heavy load like AC and motor, please enhance your load from 2 kW to 4 kW.

    • @okokk796
      @okokk796 3 ปีที่แล้ว

      @@Arushfundamentals thanks 😊😊😊

    • @sonukumarchoudhary2772
      @sonukumarchoudhary2772 2 ปีที่แล้ว

      @@Arushfundamentals my home load
      1 hp moter
      1 tv simple TV
      13 fan hai
      15 buld hai led 9watt wala
      Mujhe load increase karana chahiye ki nhi abhi mere miter ka load 1kw h

    • @Arushfundamentals
      @Arushfundamentals  2 ปีที่แล้ว

      1 kW sufficient है।

    • @sonukumarchoudhary2772
      @sonukumarchoudhary2772 2 ปีที่แล้ว

      @@Arushfundamentals to sir mere electronic miter se jo wire MCB me connect kiya hai wo bar bar jal jata hai kyu electrician se dikhaya to wo bol rhe hai load ki wajah se yesa ho rha hai

  • @travelfreak06
    @travelfreak06 4 ปีที่แล้ว

    2 kw se 3kw kie to kitna parega. Sbpdcl mai

    • @Arushfundamentals
      @Arushfundamentals  4 ปีที่แล้ว

      DSIID category me Rs 2488.50 - Previously deposited Security amount.

    • @shahidkaleem902
      @shahidkaleem902 4 ปีที่แล้ว

      Lekin maine jab 1 se 4 KW badhaya to mujhse ek bhi rupiya nhi lia office me NBPDCL me, lekin aap keh rhe hai paisa lagega. Mai confuse hu please reply

    • @Arushfundamentals
      @Arushfundamentals  4 ปีที่แล้ว

      1 January se New connection, load enhancement me application fee, security amount etc ab first bill/ next bill me hi jodkar aata hai.

  • @ashishkumar4153
    @ashishkumar4153 4 ปีที่แล้ว

    DS2D me aisa nhi hota hai
    Ki 75% se kam load rahne par fixed charge 75%ka hi lagega..

    • @Arushfundamentals
      @Arushfundamentals  4 ปีที่แล้ว

      Fixed charge hamesha recorded load ko next higher digit me round off kar ke liye jane ka pravdhan hai. Agar aapka sanction load 4 kW se kam hai to uska 75% nikal kar round off karne par sanction load ke barabar hi ho jata hai. I mean, you would get benefit of 75% minimum billing demand only if your sanctioned load is 4 kW or more and that's why you should choose 4 kW instead of 3 kW.

  • @kundankumar-ig4bk
    @kundankumar-ig4bk 3 ปีที่แล้ว

    Sir सुविधा app se 3kwh load बढ़ाने पर, सिक्योरिटी money ek hi month me आएगा या installment me

    • @Arushfundamentals
      @Arushfundamentals  3 ปีที่แล้ว

      Ek hi month me, next bill ke sath.

    • @Arushfundamentals
      @Arushfundamentals  2 ปีที่แล้ว

      Smart मीटर में सिर्फ़ 88.5 रुपये। सामान्य मीटर में अतिरिक्त सिक्युरिटी amount भी लगेगा।

    • @Arushfundamentals
      @Arushfundamentals  2 ปีที่แล้ว

      हाँ, बिल में ही charge होगा।

    • @Arushfundamentals
      @Arushfundamentals  2 ปีที่แล้ว

      30 minutes का average load md hota hai. Bill में excess demand पेनल्टी लगेगा। For MD: -
      th-cam.com/video/Ia7R6vne49o/w-d-xo.html

  • @abhishekpandit3689
    @abhishekpandit3689 3 ปีที่แล้ว

    Sir mera BPL ka connection tha par ab load 2kw badha diya or penalty vi lagane ko bola h to kitna bill aa sakta h please bataye

    • @Arushfundamentals
      @Arushfundamentals  3 ปีที่แล้ว

      Agar aap apna load badha liye aur maximum demand 2 kW ya usse kam rahega to penalty kyaun lagega.

    • @abhishekpandit3689
      @abhishekpandit3689 3 ปีที่แล้ว

      @@Arushfundamentals sir maine cyber chalate h eske liye penalty lagane ko bol rha tha

    • @abhishekpandit3689
      @abhishekpandit3689 3 ปีที่แล้ว

      @@Arushfundamentals sir mera BPL ka connection tha but jee aya or load 2kw badhaya or mai computer chalata hu to eske liye penalty lagane ko bola ye penalty kitna ho sakta h mera Bill 381rupees tha please bataye

    • @Arushfundamentals
      @Arushfundamentals  3 ปีที่แล้ว

      Bina inspection under 126 ke penalty alag se koi nahi laga sakta. Load bhi ab Suvidha app se hi apply kar badhta hai.

    • @abhishekpandit3689
      @abhishekpandit3689 3 ปีที่แล้ว

      @@Arushfundamentals sir jee aya tha mera connection bpl ka h or mai computer ka shop vi chalata hu usne 2kw load badha diya or penalty vi laga diya mera Bill 380 rupees dues tha to ab penalty k sath kitna bill a sakta h maximum please bataye

  • @vimalkumarchitranjankumar8004
    @vimalkumarchitranjankumar8004 4 ปีที่แล้ว

    Subh dha apps see load badhane par dusra bill mai bhi sem load hai 1kv

    • @Arushfundamentals
      @Arushfundamentals  4 ปีที่แล้ว

      Might be in process. Sub division office me sampark kijiye.

  • @yaduvanshiamarjeet9763
    @yaduvanshiamarjeet9763 4 ปีที่แล้ว

    Sbosha app se load घटने और बढ़ाने के ऊपर क्लिक करने से service unebaldikha rha hai

    • @Arushfundamentals
      @Arushfundamentals  4 ปีที่แล้ว

      सुविधा एप से लोड बढ़ाने - घटाने बनाने का वीडियो देखने के लिए नीचे क्लिक करें।
      th-cam.com/video/Wts8KnVyk6A/w-d-xo.html

    • @Arushfundamentals
      @Arushfundamentals  4 ปีที่แล้ว

      प्लेस्टोर से सुविधा ऐप डाउनलोड करने के लिए नीचे क्लिक करें
      play.google.com/store/apps/details?id=bsphcl.suvidha.org

  • @sumeetkalwani5828
    @sumeetkalwani5828 2 ปีที่แล้ว

    Agar meri factory me sanctioned load 23kw hai par mera maximum demand 9kw aata hai har baar ..
    Par actually me mera poora machine ka load 30kw hai par maximum demand 9kw hi aata hai ...to kya fine lagega kya ...ya fine bas tab lagta hai jab maximum load .. sanctioned load se jyada ho ??
    Please reply

    • @Arushfundamentals
      @Arushfundamentals  2 ปีที่แล้ว

      It depends upon maximum demand. Fine नहीं लगेगा। कहाँ का कनेक्शन है?

    • @sumeetkalwani5828
      @sumeetkalwani5828 2 ปีที่แล้ว

      @@Arushfundamentals madhya pradesh ...
      Actually mujhe new Machines lena hai factory me .. par me soch raha hu abhi se load increase nahi karwau ..kyuki saari machines ek saath nahi chalegi ... Ek baar ek month ke bill me dekh lu ki maximum demand load kitna aa raha hai ... Agar maximum demand load jyada aaya to fir increase Kara lunga ...abhi se karwaunga to zabardasti deposit dena padega and har month fixed tariff b badega ... To mera ye question hai ki ye legal hai na ki agar suppose aapke pass Jo machines hai uska total load sanctioned load se jyada hai ... Par maximum demand sanctioned load se kam hai ...to ese rakh sakte hai na ..isme koi fine ya penalty to nahi hai ??

    • @Arushfundamentals
      @Arushfundamentals  2 ปีที่แล้ว

      मध्यप्रदेश में industrial connection मांग आधारित है। मीटर के maximum demand के अनुसार और sanctioned load के अनुसार ही बिल बनेगा। आप निश्चित रूप से नया machine रख लीजिए, कोई fine नहीं लगेगा।

  • @nkhan683
    @nkhan683 3 ปีที่แล้ว

    2kw se 3 kw load krne me approx bill Kitna badh jata h

    • @Arushfundamentals
      @Arushfundamentals  3 ปีที่แล้ว +1

      Bill me sirf fixed charge badhega. Domestic rural: - Rs 20
      Domestic urban: - Rs 40
      NDS-IID: - 180