UK Retrofit project smashes Passivhaus airtightness standard by achieving 0.48 AC/H @50Pa

แชร์
ฝัง
  • เผยแพร่เมื่อ 19 ธ.ค. 2023
  • This 1960s Lake District home was transformed from dated and draughty to modern and economical - achieving an airtightness result that beats the EnerPHit standard of 1.0 AC/H @50Pa and even surpasses the 0.6 AC/H @50Pa requirement for Passivhaus.
    Alex Burn and Certified Passivhaus Designer, Steve Mason talk about their process for challenging retrofit projects such as this one, with the impressive airtightness result measured and discussed by Certified Passivhaus Consultant, Diane Hubbard.
    #renovation #retrofit #insulation #passivehouse #passivhaus #EnerPHit #airtightness #architecture #contractor #construction #remodeling #lowenergy #greenhome #lowcarbon #homeimprovement

ความคิดเห็น • 9

  • @damianodonovan2121
    @damianodonovan2121 6 หลายเดือนก่อน +1

    Always great to see the expertise EBS put into all their projects.

  • @Jrambo51
    @Jrambo51 6 หลายเดือนก่อน +1

    This video is one of the best I've seen. I hope many people gets to know lots more about woodfibre insulation. 👍👍👍

  • @sparkyoc6766
    @sparkyoc6766 6 หลายเดือนก่อน +2

    Agree with other comments. Would love to see more detail on this retrofit. Window detailing would be good to see and how they dealt with walls. IWI or EWI? Also, the cavity spacing and routing for the air ducting. Thanks again

  • @999fugazi
    @999fugazi 6 หลายเดือนก่อน +2

    Great video. Would like to see more of the airtightness measures taken and how the roof was insulated and what products from your catalogue that were used. I am embarking on this journey myself, in the UK and this house is near identical to ours, however the information to apply these measures is scattered across the internet with sometimes conflicting information.

    • @EcologicalBuildingSystems
      @EcologicalBuildingSystems  5 หลายเดือนก่อน

      The house in the video is featured on our project gallery on our website here: www.ecologicalbuildingsystems.com/project-gallery/deep-retrofit-lake-district-cumbria All the products used are listed at the end of this page.
      On our website we also have a training section: www.ecologicalbuildingsystems.com/training-courses Here you can find a regular schedule of training and CPDs that should help with installation and theory of how it all works. If you have any questions please get in touch via our contact page on the website.

  • @videogalore
    @videogalore 6 หลายเดือนก่อน

    Very interesting to see. It would be great to get a sense of the costings here (overall and per m2) as it is such a key aspect to retrofitting?

    • @EcologicalBuildingSystems
      @EcologicalBuildingSystems  6 หลายเดือนก่อน +1

      We provided many products with full technical support for this project. But, we don't have any further details on project costings. The Passivhaus designer was SRM Building Design and the contractor was 4Site Engineering and Construction Ltd.

  • @johnhunter4181
    @johnhunter4181 หลายเดือนก่อน

    I don't see any MVHR - how is the house ventilated?

    • @EcologicalBuildingSystems
      @EcologicalBuildingSystems  27 วันที่ผ่านมา

      There is an MVHR system, as necessary for all airtight buildings. The centralised unit is located near the backdoor. All the ducting from this is hidden behind panels so you would not know it was there.