Western Dedicate Fraight Corridor Tapi River Surat Gujarat update | WDFC progress in Gujarat

แชร์
ฝัง
  • เผยแพร่เมื่อ 2 ต.ค. 2024
  • Western Dedicate Fraight Corridor Tapi River Surat Gujarat update | WDFC progress in Gujarat #4k
    Doston Aaj hum surat me WDFC ka drone view dekh rahe hai ye vadodara Sachin section hai 135 km. lamba ye oprational hai agar apko video achhi Lage to like karna channel par naye hai to subscribe karna dhanyawad 🙏
    ______________________________________________
    #wdfc #wdfc_update
    #western_dedicate_fraight_corridore
    #4k
    #bullet_train_in_india
    #mahsrcl
    #wdfc_maharastra
    #wdfc_narmada_river
    #wdfc
    #western_dedicate_fraight_corideor
    #wdfc_gujarat_update
    _____________________________________
    WDFC Vaitarna station update
    Western Dedicate Fraight Corridor
    WDFC New update
    WDFC New update
    read this..
    The Western Dedicated Freight Corridor or Western DFC is a 1,506 km long, under-construction 1,676 mm (5 ft 6 in) freight corridor in India. It will connect Dadri in Uttar Pradesh (near Delhi) with Jawaharlal Nehru Port in Navi Mumbai, Maharashtra. The corridor is being built by the Dedicated Freight Corridor Corporation of India Limited (DFCCIL), a public-sector unit (PSU) under the Ministry of Railways and would be electrified with double-line operation. The Western DFC entails a new single-line branch from Prithla in Palwal district to Tughlakabad in Delhi, running parallel to the existing New Delhi-Faridabad-Palwal railway line.
    पश्चिमी समर्पित माल ढुलाई गलियारा या पश्चिमी डीएफसी (Western Dedicated Freight Corridor or Western DFC) भारतीय रेलवे द्वारा भारत में निर्माण के तहत एक विस्तृत गेज माल ढुलाई गलियारा है। यह भारत की राजधानी दिल्ली और आर्थिक केंद्र मुंबई को जोड़ेगा। इस गलियारे में 1506 किमी की दूरी शामिल होगी और इसे डबल लाइन ऑपरेशन के साथ विद्युतीकृत किया जाएगा। पिर्थला जंक्शन से तुगलकाबाद तक एक सिंगल लाइन शाखा का प्रस्ताव है। यह मौजूदा दिल्ली-मथुरा मुख्य लाइन के समानांतर होगा।
    Twitter Follow.. b5...
    Instagram follow Western Dedicate Freight Corridor project
    Ready
    www.instagram....

ความคิดเห็น • 12

  • @madhur3737
    @madhur3737 4 หลายเดือนก่อน +1

    93% commissioned but electrified only 80%...still work in progress.

  • @NileshPatel-qu2is
    @NileshPatel-qu2is 4 หลายเดือนก่อน +1

    Gives updates on defec from Vadodara to Ahmedabad rail

  • @plebblesrollingston
    @plebblesrollingston 4 หลายเดือนก่อน +1

    Good work. The hard work you are putting in is much appreciated. But please keep the background music's volume low. It is too high. Sometimes, one cannot hear your words when you suddenly bring up the background music. I have to constantly use volume button to lower the volume whenever the background music comes up in your videos. Thanks.

  • @polonixcoatingspeelguard
    @polonixcoatingspeelguard 2 หลายเดือนก่อน +1

    India me goods train ki average speed 25 km per hour hai
    60 nhi

  • @viralboy007
    @viralboy007 4 หลายเดือนก่อน +1

    Gift city metro ka video dikhai

  • @FFLOVER-vg8vw
    @FFLOVER-vg8vw 4 หลายเดือนก่อน +1

    Good update 😊

  • @tejassoni4619
    @tejassoni4619 4 หลายเดือนก่อน +1

    Ya kab chalu hoga

  • @khushichatterjee3025
    @khushichatterjee3025 4 หลายเดือนก่อน +1

    Awesome,

  • @navarang6177
    @navarang6177 4 หลายเดือนก่อน +1

    સરસ.

  • @tejassoni4619
    @tejassoni4619 4 หลายเดือนก่อน +1

    Shandar

  • @ganeshkale6208
    @ganeshkale6208 4 หลายเดือนก่อน +1

    बढीया व्हिडिओ 👍👍 अपडेट देने के लिये धन्यवाद

  • @dipaksonkusre5016
    @dipaksonkusre5016 4 หลายเดือนก่อน +1

    Excellent