Upgrading an electrical service from 100A to 200A | Clark, New Jersey

แชร์
ฝัง
  • เผยแพร่เมื่อ 28 ก.ย. 2024
  • In this video you'll see how I upgraded an electrical service, complete with the newly required EXTERIOR SERVICE DISCONNECT as required by NEC Article 230.85 and whole house surge protection as required by NEC Article 230.67. Sit back, relax, and enjoy the videos. I encourage your comments and/ or questions in the comment section below.
    Electrical Wiring is NOT a hobby. Call a licensed electrician!
    Classic Electric, LLC | Point Pleasant, New Jersey
    License & Business Permit # 16557
    (732)-770-1437
    Want to be an electrician? Start here: www.myelectric...
    Ron Pecina Jr. is a licensed electrician in the state of New Jersey since 2009.
    This allows him to apply for electrical permits, work with live conductors, remove meters, and disconnect service from the utility company.
    New Jersey observes the 2020 NEC and the Uniform Construction Code.
    The majority of the work you’ll see on my channel falls under the New Jersey Rehabilitation Sub Code (Chapter 6 of the U.C.C.) www.nj.gov/dca...
    * ALL New Jersey licensed electricians MUST complete 34-hours of continuing education units each tricentennial period.
    * This includes a mandatory 9-hour code update course and (1) hour business law class.
    * Any work above 10-volts requires an electrical license in New Jersey.
    *
    Become an NJ-IEC member here: www.nj-iec.org
    Ron is an active member of the New Jersey Independent Electrical Contractors Association.
    Contact: newjersey@ieci.org (732)-276-2295
    Since 2023, Ron has been an apprenticeship instructor at the NJ-IEC Education and Training Center, Somerset, NJ.
    IEC National: www.ieci.org
    Customer Guide for Electrical Installation; JCPL: www.firstenerg...
    Customer Guide for Electrical Installation; PSEG: nj.pseg.com/bu...
    WANT TO SEE MORE? FULL 200 AMP SERVICE UPGRADE. WATCH HERE: • TH-cam Subscriber in ...
    Classic Electric, LLC is a Generac standby air-cooled generator installer and authorized dealer.
    Ron Pecina Jr’s set up:
    Camera: Go Pro 9/ 10 w/ the Media Mod
    Microphone: DJI Wireless
    Editing software: Apple iMovie
    Animation software: Apple Keynote
    Background Music & Sound Effects by Soundstripe.com
    Like, Share, and Subscribe!

ความคิดเห็น • 248

  • @50sKid
    @50sKid 4 หลายเดือนก่อน +3

    You should save all the questions that people ask in the comments and answer them in a Q&A video, that way everyone can see the answers later and it gives you an excuse to make some extra content. If you have time, of course. Loving all the videos, man. Btw, I appreciate you putting in the callbacks to the sections of the NEC. Hope you don't stop doing that.

  • @Devsfan70
    @Devsfan70 5 หลายเดือนก่อน +3

    No critiquing from me, I just enjoy watching knowledgeable people do work that is interesting. I watch lots of videos on different fields of work and it's always informative and entertaining. This is a great video and it's very well presented and laid out for the layperson to understand. Thank you.

  • @royesmith1828
    @royesmith1828 2 หลายเดือนก่อน +1

    working with power on is all you can do to be efficent and time saving. i did as an electrician for 44 years. thanks Ron

  • @CaptainNixon
    @CaptainNixon 3 หลายเดือนก่อน

    I love the service upgrade / panel replacement videos (and the ones where you encounter knob/tube!), I'm not in the electrical trade myself but I absolutely enjoy watching and learning from an experienced professional like yourself.

  • @shan442us
    @shan442us 5 หลายเดือนก่อน +1

    1:10 glad you seem to be taking those comments lightly, most wouldn't understand line versus load much less a DC versus AC current. Electrons, neutrons and protons,, forget about it. 12:30 you're doing fine, keep doing what you are doing! Your commentary and sharing your logic has always been great and keep me coming back. I've been working with Milwaukee tools since the early 80's and am amazed at how loyal I am to that brand. If you do not buy your Milwaukee tools from Home Depot, I would strongly recommend it because they sell such high volume of Milwaukee tools the tool department mangers usually always give me a discount. They gave me $50 off that same tower light two days ago, tool only $129. Why did the electrician take so long to build his own house,, he kept using his dykes to hammer everything.

  • @johndimitrakis520
    @johndimitrakis520 5 หลายเดือนก่อน

    Ron, It was nice meeting and talking to you. Awesome guy.. It was a little my fault that you left late that day. LOL.. as always, good job.

  • @davidfeldman7001
    @davidfeldman7001 5 หลายเดือนก่อน +1

    Is there a code exception for upgrades that allows you to use regular breakers and not GFCI and or AFCI protection?
    Very much enjoy your vids. And it’s great that you take the time to train the next generation. Keep up the good work Ron.

    • @electricianron_New_Jersey
      @electricianron_New_Jersey  5 หลายเดือนก่อน

      Yes, here in New Jersey - for existing installations - we follow the NJ Rehab sub code. There's a link to the DCA's website in the description area.

  • @rb8049
    @rb8049 5 หลายเดือนก่อน +1

    You can work live at240v. Above 240v is nuts due to arc flash risk. At 240v you just have to be really careful. All loads off greatly reduces arc risk. The risk is if you get distracted or a wire moves unexpectedly under tension. It just takes one mistake. Gloves would be a good idea.

    • @JohnThomas-lq5qp
      @JohnThomas-lq5qp 5 หลายเดือนก่อน

      Should have rated PPE long sleeve shirt, tinted face shield, rubber gloves that were tested & dated stamped less then 6 months ago plus electricians work boots ( no metal eyelets ).

  • @wizard3z868
    @wizard3z868 5 หลายเดือนก่อน +1

    The only thing I might do is use gloves for the utility conductors but thts mostly cause I'm not used to it and as I've gotten older my nerve has been diminishing too 😅

  • @spark83ify
    @spark83ify 5 หลายเดือนก่อน

    Another great video! I enjoy watching your videos. I half to use lever bypass meters and I have been using the milbank 200 amp meter disconnect which is nice because it has spaces for additional breakers if the homeowner decides to add stuff later!

    • @electricianron_New_Jersey
      @electricianron_New_Jersey  5 หลายเดือนก่อน +2

      The meter main combos are approved here for JCPL and PSEG but the additional circuit breaker spaces at the main is prohibited (I think). Now I have to check.

  • @JJGhost-b3m
    @JJGhost-b3m 5 หลายเดือนก่อน

    As a newbie, I enjoy your videos thanks

  • @mackfisher4487
    @mackfisher4487 5 หลายเดือนก่อน +23

    It's funny that some people are criticizing you for working SOME circuits hot, it's obvious that they are not electricians. Thanks for teaching the next group of apprentice electricians.

    • @electricianron_New_Jersey
      @electricianron_New_Jersey  5 หลายเดือนก่อน +12

      People leave comments like "I'm not watching you anymore" because you didn't have full PPE rated for 80,000 volts or whatever.

    • @burgessbrooks412
      @burgessbrooks412 5 หลายเดือนก่อน +3

      We work shit hot all the time!!!!
      It's what we do!!!
      We respect it, but we aren't afraid of it.
      Good work brotha🤙

    • @elpadrino9504
      @elpadrino9504 3 หลายเดือนก่อน

      Facts!!!!!

  • @GB-mw7eh
    @GB-mw7eh 5 หลายเดือนก่อน

    Hell of a job...looks great!

  • @steveg5576
    @steveg5576 5 หลายเดือนก่อน

    I'd like to say something nice...Very nice job !

  • @GlenMacNeil
    @GlenMacNeil 5 หลายเดือนก่อน

    Great work as always Ron. Really enjoy watching your videos and look forward to them. I think I mentioned before that I'm north of the border in Canada (Ontario) and we are not allowed to touch the service conductors, meter etc. to kill the power (I wish we could) You said this job took you one day to complete. How much more time would you need to add to a job when you include the local utilities to temporarily disconnect, reconnect etc.? Thanks again.

  • @jeremyjpegan
    @jeremyjpegan 2 หลายเดือนก่อน

    You seem to like the Eaton panel more than Schneider. Any particular reason. I’m gearing up to do my upgrade so any input is greatly appreciated.

  • @alexoliman3198
    @alexoliman3198 5 หลายเดือนก่อน

    Awesome video, Ron. I will be doing a similar project putting a main disconnect outside next to the meter panel and then running the se wires from the main disconnect to my breaker panel inside the house. I will be using sleeved 4/0 aluminum and I was wondering if I need to run the sleeved wire inside 2” PVC conduit. Probably not but then I’d need to use a clamp for the wire going into my breaker panel? I’d appreciate your guidance here and keep up with the awesome videos.

  • @MiklaDfar
    @MiklaDfar 25 วันที่ผ่านมา

    Do you mark the circuits before removing the old panel? Or, how do you figure out which circuits are which on the new panel?

  • @MiklaDfar
    @MiklaDfar 25 วันที่ผ่านมา

    I see some Romex coming from the main panel to a J-box. I thought Romex outside a wall was a violation. Or is it OK in a garage?

  • @GS-lh2nx
    @GS-lh2nx 5 หลายเดือนก่อน +1

    I really appreciate your channel and content. Very well done. But what I can't figure out is not your cutting the service but the reconnection of it. I heard you explain it a little bit before but you were actually grabbing the bugs I think. Are you just that confident on a fibreglass ladder?

    • @electricianron_New_Jersey
      @electricianron_New_Jersey  5 หลายเดือนก่อน +1

      I never come into contact with anything conductive. My ratchet cutters are insulated and I never touch the open end of the "live side." If electrons have no path to flow they just won't flow.

  • @josemeza5378
    @josemeza5378 3 หลายเดือนก่อน

    Good morning Ron,
    First of all, thank you for such a good video.
    I have seen many of your videos installing the BR plug on neatral load centers, but none using arc fault breaker, ground fault breakers or dual function breakers.
    It is a cost thing ??? Standard breakers are cheaper right.

  • @AntonioGomez-l9c
    @AntonioGomez-l9c 3 หลายเดือนก่อน

    When you cut the alive service wire, which one you cut first?

  • @MiklaDfar
    @MiklaDfar 25 วันที่ผ่านมา

    What size is the equipment grounding conductor?

  • @davidmerkrebs9967
    @davidmerkrebs9967 5 หลายเดือนก่อน

    beautiful work. side question i understand csst gas flex requires bonding why doesn't flexible gas appliance connectors need bonding

    • @electricianron_New_Jersey
      @electricianron_New_Jersey  5 หลายเดือนก่อน

      Most natural gas piping is bonded to the system ground by way of the equipment grounding conductor run with the branch circuit conductors to gas-fired equipment such as a furnace. The gas line is bonded but it is to never be used as a grounding electrode.

  • @Romex_sniffer
    @Romex_sniffer 3 หลายเดือนก่อน

    Are your hands itchy from the old ladder?

  • @austintrimble2985
    @austintrimble2985 5 หลายเดือนก่อน

    looks good, only difference is i would have used 2 inch RMC and just shoot right up through the roof. then let the power company do there thing. mid west here. cheers

    • @electricianron_New_Jersey
      @electricianron_New_Jersey  5 หลายเดือนก่อน

      The truth is that would've required a lot more work, paperwork, and cost a lot more. Two sticks of 2" RMC would be required and 2-3 additional hours of labor to accomplish this. Easily a $900-$1200 upgrade.

    • @austintrimble2985
      @austintrimble2985 5 หลายเดือนก่อน

      @@electricianron_New_Jersey Im with you on that! Cheers

  • @bigtroll8249
    @bigtroll8249 5 หลายเดือนก่อน +2

    Is that duck seal oozing out from behind the washers at the mounting points for exterior panels?
    Love your videos BTW. Keep em comin.

  • @imbowser
    @imbowser 5 หลายเดือนก่อน

    i tried to do what you did but had to call someone after i got a ball busting shock. I thought everything was turned off

  • @norsk54472
    @norsk54472 5 หลายเดือนก่อน

    thanks, great content

  • @stephenie1484
    @stephenie1484 5 หลายเดือนก่อน

    Hey Ron great video. Question... my 00 aluminum wire is fastened into the meter and my main lugs I cranked the lugs to torque spec but they are still slipping a little over time. Is it safe to apply clear silicone caulk directly to hot areas safely to keep it in place? Thank you.

    • @electricianron_New_Jersey
      @electricianron_New_Jersey  5 หลายเดือนก่อน

      No, no caulk or silicone.

    • @stephenie1484
      @stephenie1484 5 หลายเดือนก่อน

      @@electricianron_New_Jersey damn ok. I don't wanna crank down any harder bc the aluminum tends to flaten out and i don't want to break it so I'll figure something out

  • @mce1919A4
    @mce1919A4 5 หลายเดือนก่อน

    Thank you.

  • @JohnThomas-lq5qp
    @JohnThomas-lq5qp 5 หลายเดือนก่อน

    Does anybody know how much more a one piece 200 amp single phase meter/ outdoor disconnect box cost. compared to a meter socket & a 200 amp outdoor disconnects like he used Years ago when I was wiring in a duplex on slab it was always way cheaper to purchase a two gang meter socket and two two pole 100 amp 2 circuit panels with 100:amp breakers. Great quality work.

    • @electricianron_New_Jersey
      @electricianron_New_Jersey  5 หลายเดือนก่อน +1

      They may be less expensive but good luck finding one for actual sale. They’re back ordered until 2026!

    • @JohnThomas-lq5qp
      @JohnThomas-lq5qp 5 หลายเดือนก่อน

      @@electricianron_New_Jersey With bad news & what thru the roof copper prices two years ago it's has to be very difficult to stay in business. Two years ago I talked to a sparky who told me it took him all morning to just get the supplies for a 100 & 200 amp service. Supply house was out of think he said 200 amp panels & something else then he had to hit two big box stores. Worst part the when he called the supply house near closing time the day before they told him they had 9 panels in stock so he didn't bother with a will call. He got there less then a hour after they opened and some contractor purchased all 9 panels. Glad that I'm retired. I had a great little supply house that would give a nice discount if you bought in bulk & paid in cash. Would purchase 100 single pole breakers and several 200' rolls of #2 SEU ( 100 amp ) service cable.Enjoy your vidios.

  • @curtisharlan9230
    @curtisharlan9230 5 หลายเดือนก่อน

    Cool electrician

  • @ashwinshaker
    @ashwinshaker 5 หลายเดือนก่อน +1

    total cost for a project like this?

  • @skiprope536
    @skiprope536 5 หลายเดือนก่อน

    Superb.

  • @brandonquig05
    @brandonquig05 5 หลายเดือนก่อน

    110.14 (D)

    • @electricianron_New_Jersey
      @electricianron_New_Jersey  5 หลายเดือนก่อน +1

      What’s that??

    • @brandonquig05
      @brandonquig05 5 หลายเดือนก่อน

      @@electricianron_New_Jersey 2023 NFPA-70

    • @electricianron_New_Jersey
      @electricianron_New_Jersey  5 หลายเดือนก่อน +1

      @@brandonquig05 and?

    • @brandonquig05
      @brandonquig05 5 หลายเดือนก่อน

      @electricalron The code is self-explanatory as far as compliance. Keep up the great videos!

  • @D2O2
    @D2O2 5 หลายเดือนก่อน

    200 Amps of power?

  • @RandallFlaggNY
    @RandallFlaggNY 5 หลายเดือนก่อน

    Not a Ranger fan this time.

  • @malikdey-nativemoor2923
    @malikdey-nativemoor2923 5 หลายเดือนก่อน +1

    In Ohio, good luck scheduling a disconnect and re-connect on the same day with the power company. 😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂
    So WE WILL DO IT LIVE!!!

  • @garycunningham8478
    @garycunningham8478 4 หลายเดือนก่อน

    What size is grounding conductor?

  • @MrJujubean
    @MrJujubean 5 หลายเดือนก่อน +3

    I love watching your videos. As far as you forgetting to turn cam back on right after battery change is no biggie I don't think. I just thank you so much for sharing you work and experience with us. I'm sure doing the video takes a lot of time to set up and make sure you get good content.its also nice that you take time out of your busy schedule to teach the new future electricians.
    Many years ago that is how I got into refrigeration. From a trade school 2 nights a week a veteran refrigeration tradesman taught the class 2 nights a week, from there I got hired at a local HVAC company for on the job training. Thank you so much for sharing your knowledge with everyone

  • @briancarlisi2224
    @briancarlisi2224 5 หลายเดือนก่อน +2

    Just found your channel. I like how you narrate after shooting your video to condense a day or so’s work into 30 minutes. Well done!

  • @jalexlivi
    @jalexlivi 5 หลายเดือนก่อน +2

    Man, I wish we were allowed to go through the back of the meter and panel in our neck of the woods. Great work as always sir, content like yours is gold for homeowners to watch. Makes it a little easier for the rest of us when they can watch a real professional in the real world.

  • @marcosmota1094
    @marcosmota1094 5 หลายเดือนก่อน +1

    Dude. Respect at minute one! Will be back for more....hello from the Bronx.

  • @ice4278
    @ice4278 5 หลายเดือนก่อน +1

    Great job Ron I appreciate all the time you take to make the video for us. If you get a chance would you show doing the grounding electrodes where you had to come from a brick wall on a house feeding the ground from the panel through the wall out to the to grounding rods thanks have a good one.

  • @ericr2zz
    @ericr2zz 5 หลายเดือนก่อน +1

    If you can do a video on why connect neutrals and ground wires at the panel disconnect, that would be interesting! i.e. how to avoid parallel electrical paths during a fault.

    • @electricianron_New_Jersey
      @electricianron_New_Jersey  5 หลายเดือนก่อน

      It's easy, actually. Anywhere downstream from the main disconnect, including all branch circuits and feeders.... the neutrals and grounds are isolated from each other.

  • @alexoliman3198
    @alexoliman3198 5 หลายเดือนก่อน +1

    Ron, I saw you upgraded the meter/main disconnect/breaker panel to 200 amps. But how about the utility line. Did they need to bring a new line able to deliver 200 amps?

    • @electricianron_New_Jersey
      @electricianron_New_Jersey  5 หลายเดือนก่อน +1

      That's all up to the utility which is PSEG.

    • @3beltwesty
      @3beltwesty 5 หลายเดือนก่อน

      That's up to the power companies. Here my house has a 200 amp service since 1971. The 3 other houses on the same transformer were originally just 100 amp service since tract homes. Ie not a custom house. My folks 1971 giant double over range has a 18.1 Kilowatt nameplate. That is why we installed a 200 amp service. Today 2 of the 3 houses to the same transformer have upgraded to a 200 amp service and none had larger wires installed. This is with local coop electric company. So often the power companies do not not increase the wire size unless actually needed.

  • @isoakfires
    @isoakfires 5 หลายเดือนก่อน +1

    So, I just had my meter upgrade to 200 amp. I had them add a meter with a service disconnect and 10 spots for breakers. 1 breaker for the house and 1 breaker for a new EV charger. I wondered about grounding when they installed it, but didn’t ask. There was no change to the main panel in the house, which I found from you is on of those crappy Pacific Electric red sticker panels. It’s been a few months since I have been in it, but I am pretty sure that the ground and neutral are bonded. I assume that is fine and still works, since it’s only running 3 wires between the outside disconnect and the main panel in the house. If I were to upgrade the inside panel, would I need to change the feeder line from the disconnect to 4 wires and isolate the ground and bond inside the house? Original wire was all done in ‘74. Just curious.

    • @electricianron_New_Jersey
      @electricianron_New_Jersey  5 หลายเดือนก่อน +1

      Guy, if you are using a Federal Pacific Electric panel in your home do your family a favor and have it upgraded, They have been known to fail and start fires. This is indisputable.

  • @MiklaDfar
    @MiklaDfar 25 วันที่ผ่านมา

    The other thing about live disconnect is that you are on a fiberglass ladder with no path to the ground. Also, you work on one conductor at a time, so even if you accidentally touch one of the conductors, you are very unlikely to be shocked.

  • @Melendezdj
    @Melendezdj 2 หลายเดือนก่อน

    I did call them, answered all there questions but on the email they send me in respons part of the information was missing. They did not give me the L-L AFC & the L-N AFC.

  • @MiklaDfar
    @MiklaDfar 25 วันที่ผ่านมา

    There were originally 2? circuits coming into the left side of the main panel; where did these go?

  • @ChuckPaolella
    @ChuckPaolella 5 หลายเดือนก่อน +1

    Love the fact that you go indep as to why grounding/bonding is so important. As always, great job Ron!

  • @felixmilburn4594
    @felixmilburn4594 3 หลายเดือนก่อน

    Ron, I love your content. That said, how are you about to trim the service wire without issue. I've watched several videos in which you trim the casing of the service wire. Please help--thanks.

  • @Ernest_son
    @Ernest_son 5 หลายเดือนก่อน +2

    That's why I'm a subscriber. The fact that you make mistakes and are not afraid to admit them makes you credible. Thanks for sharing.

  • @josephkhouri7028
    @josephkhouri7028 3 หลายเดือนก่อน

    Hey Ron I realy enjoy seeing all your work I am retired now did my time electrical on and off 40 years. I am so glad to here you are also instructing we always need to help the younger crowd.
    p s still think you need gloves when you disconnect just the service head.

  • @JohnThomas-lq5qp
    @JohnThomas-lq5qp 5 หลายเดือนก่อน

    Bet it would not cost manufacturers of smart meters no more then $20 to install a lockable lever to open the smart meter relay contacts instead of the $3 to $500 for the exterior outdoor disconnects ,ground bar and additional ground wire& labor.

  • @alexs2778
    @alexs2778 5 หลายเดือนก่อน

    Does the main breaker box outside gets a lock? I can picture someone playing a prank and leaving whole house dark by flipping that thing.

  • @OnusofStrife
    @OnusofStrife 4 หลายเดือนก่อน

    Do you generally not reuse breakers? Even here where it looks like you have some existing br breakers? I guess it probably better to just get all new anyway and they aren't that expensive.

  • @trustmebro8500
    @trustmebro8500 4 หลายเดือนก่อน

    You’re a badass bro, I just subscribed I’ll be binge watching back so expect comments and likes

  • @Dezeberbro
    @Dezeberbro 5 หลายเดือนก่อน

    I always learn from your video, I take some of your techniques to better my work. I know you been doing this for so long, but why don’t you at least wear hot gloves?

  • @justin0114
    @justin0114 5 หลายเดือนก่อน

    You're carrying a lot of weight around your belt and your body. I can't carry that many tools.

  • @donl1410
    @donl1410 5 หลายเดือนก่อน

    Why not use a meter-main instead of two pieces of equipment? That is more cost effective where I am.

  • @FrontRowOrBust
    @FrontRowOrBust 5 หลายเดือนก่อน

    Ayyyye, 20k subscribers Ron! That’s awesome and well deserved🎉

  • @Dezeberbro
    @Dezeberbro 5 หลายเดือนก่อน

    You ever do any commercial or industrial?

  • @GB-mw7eh
    @GB-mw7eh 5 หลายเดือนก่อน

    What does a job like this cost?

  • @Melendezdj
    @Melendezdj 2 หลายเดือนก่อน

    Thanks Ron, I do appreciate your excellent work and the ability to teach as well. I do have a question about 'Fault Current Avelability'. Right now I'm doing volunteer work at my place of worship and I would like to know how can I find out what is the Fault Current Avelability at the transformer so I can do a Fault Current calculation. Where do I start?
    David

    • @electricianron_New_Jersey
      @electricianron_New_Jersey  2 หลายเดือนก่อน +1

      @@Melendezdj have your account number ready and call the electric utility company.

  • @1219ess
    @1219ess 5 หลายเดือนก่อน

    Does the electric company provide 200amp to every home? Even if you have a 100amp panel?
    Basically, can I update my 100amp panel to a 200amp without having electric company involved?

    • @electricianron_New_Jersey
      @electricianron_New_Jersey  5 หลายเดือนก่อน

      In New Jersey, it is common for the POCO to provide a 50 kW transformer and connected to 3-4 houses in a residential neighborhood.

  • @luispozos2255
    @luispozos2255 2 หลายเดือนก่อน

    So even though all the power is turned off from the main panel and meter disconnected, the wires going back to the transformer on the pole, are essentially still energized?

    • @luispozos2255
      @luispozos2255 2 หลายเดือนก่อน

      So that’s a yes? Lol

  • @bigwoodrz
    @bigwoodrz 5 หลายเดือนก่อน +1

    Do you have to have every job inspected by an authority? Or only after new mains installation.

    • @electricianron_New_Jersey
      @electricianron_New_Jersey  5 หลายเดือนก่อน +1

      Permits and inspections are required for any size service upgrade.

  • @michaelbongiovi111
    @michaelbongiovi111 5 หลายเดือนก่อน

    I'm curious how you keep track of which circuit goes to which breaker after installing the new panel given that you're supposed to label all of the breakers afterwards.

    • @electricianron_New_Jersey
      @electricianron_New_Jersey  5 หลายเดือนก่อน +1

      I don’t I just go through the house and label them afterwards.

  • @zekenzy6486
    @zekenzy6486 5 หลายเดือนก่อน

    Great Video and Great Job. Thank you for sharing. May I ask, what is purpose of Disconnect switch breaker outside ?

    • @electricianron_New_Jersey
      @electricianron_New_Jersey  5 หลายเดือนก่อน

      Firemen have a way to kill power from the exterior of a burning building.

  • @bigchuck3189
    @bigchuck3189 5 หลายเดือนก่อน

    Aren't new breakers required to be AFCI or GFCI? Or did you do device protection downstream from breaker?

    • @electricianron_New_Jersey
      @electricianron_New_Jersey  5 หลายเดือนก่อน

      This is an existing electrical system. Only need AFCI/ GFCI for any NEW branch circuits. This is the NJ Rehab sub code.

  • @DTzant
    @DTzant 5 หลายเดือนก่อน

    I’m one of those old journeyman and appreciate your videos. My only critique is I would’ve just used side cutters to cut the old SE conductors. Ha. But who cares.

  • @toolsandtactics
    @toolsandtactics 5 หลายเดือนก่อน

    Quality Craftsmanship As Always!

  • @FernandoGomez-rs2pd
    @FernandoGomez-rs2pd 5 หลายเดือนก่อน

    Another one of those great videos never get tired of watching ur work. I wanted to ask you if I purchased a 120 plug in water heater rated at 2000 watts what breaker would I need single 20 or double pole any info is greatly appreciated

    • @electricianron_New_Jersey
      @electricianron_New_Jersey  5 หลายเดือนก่อน

      For water heater conductors and circuit breakers, they must be sized 125% of the rated load. So, 2000 watts x 125% (2000 x 1.25) equals 2500 watts. 2500/ 120 = 20.833333. So 10/2 wire and single pole 30 amp circuit breaker. Good luck.

  • @UnsoughtDevil0451
    @UnsoughtDevil0451 5 หลายเดือนก่อน

    Meter pan and disconnect height? Just looks a little high (I don’t know what your local power company permits)?

  • @phillyelectric7043
    @phillyelectric7043 3 หลายเดือนก่อน

    Y would u work without a decent helper at experience level and age. This way u won’t have to do all that unnecessary grunt work and clean up ?

  • @gibby2727
    @gibby2727 4 หลายเดือนก่อน

    Ron love the videos, If you are doing a service upgrade and there is an existing 3 wire range feed, you would need to bond the neutral and ground at the main panel cause if we were to separate them techically the range wire wouldnt be grounded.

    • @electricianron_New_Jersey
      @electricianron_New_Jersey  4 หลายเดือนก่อน

      A 3-wire range circuit doesn’t have a neutral. A 4-wire does have a neutral, a ground, and two hots.

  • @RiseOrRelinquish
    @RiseOrRelinquish 5 หลายเดือนก่อน

    Hi Ron,
    Why is there a disconnect between the meter and panel? Why is it also outside?

  • @tomaszwida
    @tomaszwida 4 หลายเดือนก่อน

    I see u did disconnect but where is that surge protector u installed? somehow i missed it?

  • @BackwoodsLaw
    @BackwoodsLaw 5 หลายเดือนก่อน

    That is why you are trained and experienced Ron. Live work is fine if you have the training and experience and sometimes necessary like you said. We were not technically authorized to pull meters as Firefighters, but when you have guys inside of a burning building with water, we had line workers teach us how to do it properly to protect our crews. The electric company appreciated us working with their line crews to learn the right way to do it. Prior to that, we did it the firefighter way and would destroy the meter and tear it out with NY poles and halligan bars....🤣

  • @RandomTechWZ
    @RandomTechWZ 5 หลายเดือนก่อน

    I see you didn't trim the neutral wire on the surge suppressor. I didnt either when I installed mine and think it'll be okay as the path is still much shorter than anything else in the panel.

  • @jeffmoss26
    @jeffmoss26 5 หลายเดือนก่อน

    Nice work! Hope you scrapped the old riser :)

  • @rodolfovesga979
    @rodolfovesga979 หลายเดือนก่อน

    Cool video Ron another great job!!❤

  • @spree1948
    @spree1948 หลายเดือนก่อน

    Is the service disconnect necessary?

    • @electricianron_New_Jersey
      @electricianron_New_Jersey  หลายเดือนก่อน

      Yes it is necessary. It's for first responders who might be asked to save your life. NEC 230.85

  • @fernandoprieto2865
    @fernandoprieto2865 3 หลายเดือนก่อน

    Is there a reason you did not tape the last/3rd overhead cable?

  • @hoyte44
    @hoyte44 5 หลายเดือนก่อน

    Great video as usual. ignore the hater’s

  • @skiprope536
    @skiprope536 5 หลายเดือนก่อน

    That a problem with vinyl siding. Great

  • @Lanceb131
    @Lanceb131 5 หลายเดือนก่อน

    Absolutely fascinating video as always! Watched it all the way through as always. As always I loved you & your videos! A question if I may please that I thought about after I watched the video when it was 1st released. Why Don't you just use a outdoor shutoff with a few places for breakers incase they ever need to wire something outside in the future (ie, well pump, external building like a shed, pool, hot tub, ect)? My parents had a well put in for irrigation several years ago & it was lucky that whoever put in the outdoor shutoff on there home put a shutoff with a cupple of breaker slots on it even though, at the time, there was absolutely nothing that needed it at the time! Just curious please so I came back to ask you. Thank you & please keep the great videos coming! PS, please give your pets a good scratch from me & I wish we could see them more often please?!

  • @garretcasey6261
    @garretcasey6261 4 หลายเดือนก่อน

    How come you don’t use a meter combo?

  • @jontnoneya3404
    @jontnoneya3404 5 หลายเดือนก่อน

    Your vids are awesome. Don't let other comments get ya down. Just know there are plenty of us out here that enjoy watching your videos!! It's so relaxing watching you work and often I feel like I learn something. I do get a little anxious when you're cutting on live utility wires and reconnecting them but that's only because I'm not the professional, you are and you know how to do it safely.
    I particularly like your discussion on aluminum vs copper. My mom's house was built in the 70s and never has had a service upgrade. However when working to get a new bathroom ceiling heater installed, the electrician took a thermal imaging picture of breaker box while the AC was on.....later summer last year. The thing showed a LOT of heat and he said "It's aluminum wire coming in from the meter and we recommend copper. Also you should upgrade from 125 amp to 200 or 250 amp" I can't remember which he suggested. He said it was a fire hazard having aluminum but the house has been running this way for 50 years so it seems a little odd that we need up upgrade it now. Would you care to share your thoughts on that? We live in Oklahoma by the way with 100+ degree summer days and AC runs all the time.

  • @JohnThomas-lq5qp
    @JohnThomas-lq5qp 5 หลายเดือนก่อน

    Good Info on Sawzall . Often thought they were around years before WW 2. Back in the 1960's seemed like only plumbers owned them. Did not get my first Sawzall untill late 1970's. Was fun cutting unistrut with a hacksaw. Almost as much fun as having my dad make me use star drills first couple of years to drill anchor holes.

  • @vince6829
    @vince6829 5 หลายเดือนก่อน

    As always, great workmanship. Your apprentices have a great teacher. Thank you for sharing your knowledge.

  • @mrears9335
    @mrears9335 5 หลายเดือนก่อน

    I really like how you explained this video, thank you for your honesty.Would you be able to explain how to install a 2 pole switch for a heating board.

  • @BillTeague-o6y
    @BillTeague-o6y 5 หลายเดือนก่อน

    Hey Ron always watch your videos , keep on trucking. In my part of Canada we are authorized to cut live services/ pull meters to do service or panel changes/ repairs like you are but we take a short course ( renew every 2 years ) with the utility and have to use required safety gear when doing it such as arc flash suit , visor but most importantly in my opinion 1000 volt rated rubber gloves ( with leather covers ). Ive been doing this for 38 years and am competent and confident , as you are , working with live equipment but would love to see you use a pair of gloves when doing these cuts , you just never know . All the best Brother !

  • @TheTubejunky
    @TheTubejunky 5 หลายเดือนก่อน

    Working hot is very dangerous. If I have to I use my 1000Vac gloves. Not to say I haven't without them it's just my piece of mind. another great install.

  • @JohnThomas-lq5qp
    @JohnThomas-lq5qp 5 หลายเดือนก่อน

    An inspector broke a friend's balls when he used bathroom silicone ( better for preventing mold growth ) because it's not listed for that. After inspector told him to use inferior duct seal my friend said that silicone would not harm any wire insulation and his ice cube tray and some kitchen utensils are made of silicone.

  • @DjJfader201
    @DjJfader201 4 หลายเดือนก่อน

    Great video. Well detailed and very clean work. I have to get this service done and this was super informative. A+

  • @thatguy4320
    @thatguy4320 5 หลายเดือนก่อน

    You definitely have given me a ton of great information that’s really helped me become a better electrician so thank you so much for your uploads Ron! Keep up the amazing work

  • @rorysalarms8110
    @rorysalarms8110 5 หลายเดือนก่อน

    Really nice job Electrician Ron you are a professional also when i do a outlet hot i am very careful and i use Klein insulated screw drivers so i don't cause a short and i love Klein tools i think they are awesome also i hope you had fun in Las Vegas.