you probably dont care at all but does anyone know a method to get back into an instagram account?? I was dumb forgot the account password. I appreciate any tips you can offer me!
@Merrick Christian Thanks so much for your reply. I found the site through google and Im trying it out atm. I see it takes quite some time so I will get back to you later with my results.
It depends on the formation. We drilled over 15,000 feet in a single run in the Eagle Ford shale in 2014. I'm sure there's been longer runs. On a six well drilling pad, we drilled all six surface hole sections with one BHA and bit, for nearly 24,000 feet. The bit looked new except for the worn paint. The surface hole section in south Texas is like drilling through a snow bank.
What sizes are available? 4 3/4'' with 5 7/8'' to 7'' bit size 6 3/4'' with 8'' to 11 5/8'' bit size, 8'' with 12'' to 14'' bit size and 9 1/2'' body with 14'' - 17 1/2'' bit size. What pad sizeas are available? Stabilizer above is always 1/8'' undergauged? How to measure ROP - is depth downlinked from surface? Does the tool need specific differential pressure from bit to have enough power for the pads? Means in case losses occur and planned flowrate has to be reduced, POOH and change configuration. Can this be done by changing an internal ring on the rigsite or only in the workshop? What happens in case a nozzle is plugged and pressure drop below iCruise increases above planned range - will that damage the internal parts of the iCruise and toll has to be POOH? With that Superflex what is the maximum DLS to be drilled with 4 3/4'' and 6 3/4'' tool? This Superflex can cause vibrations, so in case planned DLS is moderate, is there different flex designs available?
Hey Peter! I wish I could answer your questions man, but I would just suggest reaching out to someone at Halliburton. They could answer your questions better.
i also looking a project 500 km area its need 100 nos ro water source may be help me on thath project well driling at at least 100 stn.well water to the Land craft logestic project
Thank you! Finally an understandable and clear description of how to bend an oil string. Well done.
you probably dont care at all but does anyone know a method to get back into an instagram account??
I was dumb forgot the account password. I appreciate any tips you can offer me!
@Hunter Jameson instablaster ;)
@Merrick Christian Thanks so much for your reply. I found the site through google and Im trying it out atm.
I see it takes quite some time so I will get back to you later with my results.
@Merrick Christian it did the trick and I finally got access to my account again. I'm so happy:D
Thank you so much, you really help me out :D
@Hunter Jameson Glad I could help :D
Does this fit on a Milwaukee drill?
very good explanation, thanks a lot, great job!
Saya teringat masa kecil saya, sewaktu tinggal diwilayah Merak - Banten ada perusahaan Santa Fe.
Can't wait till they have a DIY kit.
Some one said it worked with slower ROP compared with SLB PD Archer or orbit. Is that true?
I worked in Halliburton and Schlumberger and I can say that slb equipment is the best.
Sounds similar to The Improved TunnelVision Mole.
how long can that bit work before it need to be replaced
It depends on the formation. We drilled over 15,000 feet in a single run in the Eagle Ford shale in 2014. I'm sure there's been longer runs. On a six well drilling pad, we drilled all six surface hole sections with one BHA and bit, for nearly 24,000 feet. The bit looked new except for the worn paint. The surface hole section in south Texas is like drilling through a snow bank.
What sizes are available? 4 3/4'' with 5 7/8'' to 7'' bit size 6 3/4'' with 8'' to 11 5/8'' bit size, 8'' with 12'' to 14'' bit size and 9 1/2'' body with 14'' - 17 1/2'' bit size. What pad sizeas are available? Stabilizer above is always 1/8'' undergauged?
How to measure ROP - is depth downlinked from surface? Does the tool need specific differential pressure from bit to have enough power for the pads? Means in case losses occur and planned flowrate has to be reduced, POOH and change configuration. Can this be done by changing an internal ring on the rigsite or only in the workshop? What happens in case a nozzle is plugged and pressure drop below iCruise increases above planned range - will that damage the internal parts of the iCruise and toll has to be POOH?
With that Superflex what is the maximum DLS to be drilled with 4 3/4'' and 6 3/4'' tool? This Superflex can cause vibrations, so in case planned DLS is moderate, is there different flex designs available?
Hey Peter! I wish I could answer your questions man, but I would just suggest reaching out to someone at Halliburton. They could answer your questions better.
now make a cutaway display model to show exactly what's going on inside
Let’s go Halliburton!!!
Looooongah Haaardaaah and quickaaaah! Drill it baby!
Someone's had a little too much caffeine. :P
Still AutoTrak-Baker Hughes in different area 😊😊😊
Do y’all know where I could get a job in pipeline HDD I know how to calculations and I am a fast learner
Thanks for the question, but unfortunately we don't work with any staffing agencies or job boards at the moment.
Oilfield Basics okay well if anyone ask I’m willing to relocate, my number is 281.759.0921
A copy of Schlumberger power drive push the bit system
There is no information to suggest that Halliburton has copied technology from Schlumberger.
Anyone knows the how much is it?
More than a dollar
Hope the new addition of RSS will improve Halliburton performance in GeoMarket for search of HC
mic is death
i need to make drill to make a duct to more electric cabel duct
It would rock better with a Ulterra Bit 🤷🏾♂️
I like it! ;o)
The bit should steer. No, or minimal, Bit to Sensor= zoro projection ahead.
i also looking a project 500 km area its need 100 nos ro water source may be help me on thath project well driling at at least 100 stn.well water to the Land craft logestic project
Neat
Did he say "doddgy software" ?? 😁
They should call it i-Copy.. right at 4:49 he almost said AutoTrak 🤣😂🤣😂
“No one will notice that we copied it if we paint it red and change the name.” Lol
@@affliction337 🤣🤣😂😂🤣🤣😂🤣😂 Xeroxburton .. @ 1:00 Superflex...OMG... Looks exactly like the Baker AutoTrak Flex Sub
Fascinating! Renewables is such a bland industry in comparison.
Haha! Well said.
It really is. It's a scam tbh. Nuclear is the only viable replacement for fossil fuels. Solar and wind are about 30 years too young.
FYI this kind of drilling is used for renewables too (deep geothermal)
@@Jennaehill true. Geothermal is very interesting. About the only form of renewable energy that we may rely on.
Fully Automated drilling
Hmmmmm...is that Hal or just SLB PD knockoff ?
similar as atk
Looks like a fish waiting to happen
Junk compared to what Baker Hughes Inteq has
You got it bro 👌
My english is terryble!
800 people lose job at Reno Halliburton - thedailyjobcuts.com - good riddance