Kids boomerang slide

แชร์
ฝัง
  • เผยแพร่เมื่อ 23 ก.ย. 2024
  • Water park construction Steps:
    1. Feasibility Study
    2. Land Survey
    3. Planning and Concept Design
    4. Design Review and Confirmation
    5. Budget and Investment Analysis
    6. Set up the Cooperation
    7. Engineering Design and Equipment Production
    8. Transportation and Installation
    9. Equipment Commissioning and Management Training
    10.Grand Opening

ความคิดเห็น •