MARINI modiFALT Polymer Modified Bitumen (PMB) Plant Animation

แชร์
ฝัง
  • เผยแพร่เมื่อ 26 ก.ย. 2024
  • Marini Makina's modiFALT is one of the most successful polymer modified bitumen plant in the market so far. Here in the video you can watch and learn the basics of the modiFALT that brought its significant success.
    For more info,
    please visit www.marini.com.tr & www.tekfalt.com.tr,
    or directly reach us via mail; info@marini.com.tr,
    or by phone; +90 312 386 33 22.

ความคิดเห็น • 14

  • @osamaelheshani9978
    @osamaelheshani9978 ปีที่แล้ว

    Very good improvement of additives with special devices and this required .

  • @mohamedahmed-bc6ww
    @mohamedahmed-bc6ww ปีที่แล้ว

  • @Aibovec
    @Aibovec ปีที่แล้ว

    I have a technological question, after the sbs granules are mixed with the bitumen, how long does it take for the pmb to be ready to use? 1h or 6-8h?

  • @erayunver123412
    @erayunver123412 6 ปีที่แล้ว

    Çok güzel öğretici bir animasyon olmuş.

  • @tahseensaad7860
    @tahseensaad7860 2 ปีที่แล้ว

    how could the PMB is stored in the bitumen for long and short time?
    what is the process for this? to avoid segregation?

  • @enoelgallardo602
    @enoelgallardo602 4 ปีที่แล้ว

    Dibujo en vista planta