ProjectLibre: View Free, Total, and Zero Slack or Float

แชร์
ฝัง
  • เผยแพร่เมื่อ 8 ก.ย. 2024
  • Difference between Total Float, Free Float, and Zero Float (or Slack): TH-cam link: • What is Zero float, Fr...
    19 TIPS for setting-up the perfect project: • How to prepare, setup ...
    ProjectLibre: Setting-up a Project: • ProjectLibre: Setting-...
    ProjectLibre: Tracking Project Progress: • ProjectLibre: Tracking...
    ProjectLibre: Ahead/Behind Schedule or Over/Under Budget: • ProjectLibre: Ahead/B...
    ProjectLibre: Setting Country Currency: • ProjectLibre: Setting ...
    ProjectLibre: How to Identify Overallocated Resource: • ProjectLibre: How to I...
    ProjectLibre: Practical Ways to View Task Bars: • ProjectLibre: Practica...
    ProjectLibre: Multiple Tasks - Indenting and Outdenting: • ProjectLibre: Multiple...
    ProjectLibre: Multiple Tasks - Changing Task Type and Efffort Driven: • ProjectLibre: Multiple...
    Microsoft Project: How to view Total Float, Free Float, and Zero Float (or Slack): TH-cam link: • MS Project: View Free,...
    / @pieterrademeyer1 (Visit my Channel for Project Management topics and videos)
    This video shows how to view Free Slack (or float), Total Slack (or float), and Zero Slack (or float) in ProjectLibre.
    1. Free Slack (or float) = the amount of time a task (or activity) can be delayed without delaying a successor task.
    2. Total Slack (or float) = the amount of time a task can be delayed without delaying the project.
    3. Zero Slack (or float), also known as the Critical Path = if any of the tasks (or activities) are delayed the project will be delayed. The critical path is the sequence of tasks with the longest path through a project.

ความคิดเห็น •