Closing Circuit of 33 KV Outdoor GO Vaccume Circuit Breaker- Part 2: Breaker Control Circuit Series

แชร์
ฝัง
  • เผยแพร่เมื่อ 29 ม.ค. 2025

ความคิดเห็น • 68

  • @aditiajgaonkar9619
    @aditiajgaonkar9619 5 ปีที่แล้ว +4

    Please continue with such informative sessions

  • @muneeryou
    @muneeryou 6 ปีที่แล้ว +2

    How can we ensure that closing coil gets positive before antupumping relay. Because if AP relay gets positive earlier than closing coil then it will open its NC contact that is in series with closing circuit and hence the closing coil won't get any positive and breaker won't charge. Therefore it is necessary to supply positive to AP relay via two parallel paths one having auxiliary NO contact and other having NO contact of AP relay.
    PS : The overall explanation is wonderful and very easy to understand. Looking forward to your other videos.

    • @ELECTRICALFUNDAZ
      @ELECTRICALFUNDAZ  6 ปีที่แล้ว

      Yes sir I have seen that in 220 kv breaker scheme. But not in 33 kv breaker.

    • @ELECTRICALFUNDAZ
      @ELECTRICALFUNDAZ  6 ปีที่แล้ว

      Thanks for sharing with us though.

    • @rjshtk
      @rjshtk 5 ปีที่แล้ว

      I think the reason to supply parallel path for AP relay is not exactly what you meant. The 52a in the path of the AP contactor is to make sure that the Close coil is not burned out if a user keeps the TNC switch to the Close position even after the CB is closed.
      Also, the NO contact of the AP contactor which is in series with the AP contactor ckt is for preventing another closing operation if it was closed onto a fault (SOTF condition).

    • @industrialelectricaltech2977
      @industrialelectricaltech2977 5 ปีที่แล้ว

      True

  • @satya1027
    @satya1027 4 ปีที่แล้ว

    As in your circuit service limit is in NC when DC main on 1st spring charge motor will oparete and spring charge done and the contact will open how the supply pass to coil.
    Please reply if I am wrong

  • @MKP_Swami
    @MKP_Swami 4 ปีที่แล้ว

    Dhanyavad sir, khup chhan prakare aapan samjun sangitale , asech video banvat raha .... dhnyavad

    • @ELECTRICALFUNDAZ
      @ELECTRICALFUNDAZ  4 ปีที่แล้ว

      Join our FB Group, to ask your questions and start a discussion ! Hii Guys, please Join our Facebook Group 'Nitin's Community for Electrical Engineers', to ask anything related to 'Electrical' and especially about 'EHV Power Transmission System'. But please do not post silly questions like posting a photo and asking what is this what is this, its very irritating. Also, no Good Morning, Goodevening or Festival messages please. Link to join the Group is : nitinn.link/elecfbgrpefyt

  • @Abc-tm7wn
    @Abc-tm7wn 4 ปีที่แล้ว +1

    Sir,if TNC Switch is stuck both side trip and close and bkr on remote position than closing problem occur ?

    • @ELECTRICALFUNDAZ
      @ELECTRICALFUNDAZ  4 ปีที่แล้ว

      If the TNC Switch is stuck on C, then a continous pulse is given to the Breaker and if the Breaker Auxillary contact is sluggish, it will burn tge Closing Coil.

  • @muneeryou
    @muneeryou 6 ปีที่แล้ว +1

    THANKS for the video. I have some confusion. The two diagrams you have shown for remote closing. You said that in the first diagram that there is danger to personal working on breaker if breaker is closed remotely. But when switch is at remote position how can the positive be extended to closing coil. If you observe carefully Both the diagrams are correct you have just interchanged the position of TNC and remote switch. At 15:45

    • @ELECTRICALFUNDAZ
      @ELECTRICALFUNDAZ  6 ปีที่แล้ว +2

      In the first Diagram we have used Positive from the relay panel and so if the LR switch is faulty, the DC may get extended to the Breaker. But in the second Diagram , as we are using Breaker positive called as closing positive, when switch off the breaker DC, DC will not get extended.

    • @muneeryou
      @muneeryou 6 ปีที่แล้ว

      @@ELECTRICALFUNDAZ Thanks for the clarification 👍

  • @ravikumardoraswamy6848
    @ravikumardoraswamy6848 5 ปีที่แล้ว +2

    Outstanding explanation with practical experience
    Thanks a million 👍👍👌👌💐💐

  • @3rdtesla
    @3rdtesla 4 ปีที่แล้ว

    Please explain OLTC control circuit if possible....

  • @9846102426
    @9846102426 6 ปีที่แล้ว

    Great... i am waiting for ferrule like k5 ,k21 (what is the rule for ferrule)

  • @ashishvitekar3474
    @ashishvitekar3474 3 ปีที่แล้ว

    Very nice explain and informative video's keep it up.
    Thank you

  • @amitpathria4218
    @amitpathria4218 6 ปีที่แล้ว +2

    Great...waiting for trip circuit and spring charging circuit...

    • @ELECTRICALFUNDAZ
      @ELECTRICALFUNDAZ  6 ปีที่แล้ว

      Before that you will get to see Troubleshooting Closing circuit problem

  • @ashiqueahmed9177
    @ashiqueahmed9177 4 ปีที่แล้ว

    very very helpfull video....well explained....drawing is not seen properly

  • @cricketinformationcapsule
    @cricketinformationcapsule 5 ปีที่แล้ว

    Sir we are adding antipumping relay across cc and taking its nc contact to protect the breaker hunting effect.but how it is getting continuos supply to make its contact remain open till breaker is on condition.because we are giving only one pulse on that time 94 relay pickup and remain off.how sir

    • @rajeshtk1246
      @rajeshtk1246 5 ปีที่แล้ว

      Once the CC is closed by the Close Pulse, the AP contactor will close its contact, whose NO contact is used in series with the AP contactor's coil. This will make sure that the AP contactor is kept in the energized condition until the TNC switch is released.

  • @RajeshKumarYadav-pr1yv
    @RajeshKumarYadav-pr1yv 5 ปีที่แล้ว

    Boss can I get all ansi code related circuit please give me

  • @dwaramaswani2608
    @dwaramaswani2608 6 ปีที่แล้ว +1

    सर आपका बहुत बहुत धन्यवाद यह वीडियो मेरे लिए बहुत उपयोगी है

  • @pravinkumarram8657
    @pravinkumarram8657 4 ปีที่แล้ว

    सर नमस्कार , 33 के वी CB और कंट्रोल पन्नेल का वायरिंग इंटर कनेक्सन कैसे बनाते है और इसमें क्या क्या ध्यान रखना पड़ता है

  • @rajugupta-zk8vt
    @rajugupta-zk8vt 4 ปีที่แล้ว

    Sir 132 kv circuit breaker ka closing ka dragam ka video banaye sir

  • @d.likhita2930
    @d.likhita2930 6 ปีที่แล้ว +1

    Sir your explanation is excellent thank-you sir

  • @forKnowledge123
    @forKnowledge123 5 ปีที่แล้ว +2

    Good explanation sir.

  • @forKnowledge123
    @forKnowledge123 5 ปีที่แล้ว

    Sir, please send CT Connection video
    Two core or 3core CT
    1s1, 1s2, 1s3, 1s4
    My doubt is
    I take for metering 1s1 - 1s2 then remaining 1s3 and 1s4 what to do
    Please reply and also video

    • @ELECTRICALFUNDAZ
      @ELECTRICALFUNDAZ  5 ปีที่แล้ว +2

      If 1S1 and 1S2 are used, 1S3 and 1S4 are to be kept open as Circuit is already completed through the winding between 1S1 and 1S2.

    • @forKnowledge123
      @forKnowledge123 5 ปีที่แล้ว

      Thanks sir

    • @forKnowledge123
      @forKnowledge123 5 ปีที่แล้ว

      If, any axillary contact along with 1s1, 1s2, AX, 1s3
      What we do auxiliary terminal

    • @industrialelectricaltech2977
      @industrialelectricaltech2977 5 ปีที่แล้ว

      We use 1s1 and 1s2 for metering and 2s1and 2s2 for proction

  • @prashantsuradkar9056
    @prashantsuradkar9056 6 ปีที่แล้ว

    Very nice explain.please make same video for ACB

    • @ELECTRICALFUNDAZ
      @ELECTRICALFUNDAZ  6 ปีที่แล้ว

      Sir if you can provide us with the acb bkr drawing, we will make a video.

  • @anurag6379
    @anurag6379 4 ปีที่แล้ว

    Very informative video 👌👌Sir...marshalling box to CR Panel, RTCC Panel wiring pe bhi video banaiye please.(40 mva xmer )

  • @kaiserdar2552
    @kaiserdar2552 5 ปีที่แล้ว

    Can you please explain TCH

    • @ELECTRICALFUNDAZ
      @ELECTRICALFUNDAZ  5 ปีที่แล้ว

      Dear Sir, please watch this video on TCS/TCH th-cam.com/video/CYLK06GeDyM/w-d-xo.html

  • @Gtdajdpgjtmdp
    @Gtdajdpgjtmdp 6 ปีที่แล้ว

    Sir,
    Aap jo ye slide banaye h usko website pe upload kr dijiye please.
    And thank you sir for your affort to make us knowledgeable towards electrical wiring.

  • @jithvt7188
    @jithvt7188 5 ปีที่แล้ว +2

    Thanks your dedication Amazing

  • @surendrakverma555
    @surendrakverma555 4 ปีที่แล้ว

    Very good

  • @biswajitnath1921
    @biswajitnath1921 5 ปีที่แล้ว

    Sir please added trip circuit control video

    • @ELECTRICALFUNDAZ
      @ELECTRICALFUNDAZ  5 ปีที่แล้ว

      Sir we have a video on TCS please search in our channel

  • @dipankarbarman3514
    @dipankarbarman3514 5 ปีที่แล้ว

    Bhai pls 650 relay n.a. video banau

  • @dbengineers5605
    @dbengineers5605 4 ปีที่แล้ว

    Thankyou very much sir.

  • @ksroat6128
    @ksroat6128 5 ปีที่แล้ว

    Nice video for us

  • @shrutikaushik8086
    @shrutikaushik8086 5 ปีที่แล้ว

    Very informative

  • @siyaramsharan1122
    @siyaramsharan1122 4 ปีที่แล้ว

    Bhai thank you so much

  • @ajayyadav-xq7yv
    @ajayyadav-xq7yv 4 ปีที่แล้ว

    Thanks a lot bro

  • @prashantsuradkar9056
    @prashantsuradkar9056 6 ปีที่แล้ว

    Nice explain

  • @pradipmandal9868
    @pradipmandal9868 6 ปีที่แล้ว

    sir, electro- mechanical O/C and E/F relay par ak video banaye...

  • @pradipmandal9868
    @pradipmandal9868 6 ปีที่แล้ว

    excellent

  • @dhrupadsaha4171
    @dhrupadsaha4171 5 ปีที่แล้ว

    Love this video..

  • @prashantsonar4334
    @prashantsonar4334 3 ปีที่แล้ว

    Nice

  • @guriyaroy8276
    @guriyaroy8276 6 ปีที่แล้ว

    Excellent ..

  • @dwaramaswani2608
    @dwaramaswani2608 6 ปีที่แล้ว +1

    सर लोकल रिमोट स्विच में प्रैक्टिकल वीडियो बनाएगा प्लीज सर

  • @pradipmandal9868
    @pradipmandal9868 6 ปีที่แล้ว

    waiting for elecrical BAHUBALI part-3

  • @ranjan1436
    @ranjan1436 5 ปีที่แล้ว

    Your explanation needs little elaboration in detail, need to restrict current in TNC switch

  • @pandithalgare
    @pandithalgare 2 ปีที่แล้ว

    मराठीत बनवा की व्हिडिओ