tarrace Waterproofing IPS flooring

แชร์
ฝัง
  • เผยแพร่เมื่อ 16 ต.ค. 2024
  • Construction Process of IPS flooring
    clean floor by water wash and application of brush
    after cleaning, level mark are done by spirit leveling at 2-3 meter interval on surrounding wall
    after proper level setting, concrete dummy dote are constructed at a 2 to 3 square meter area.
    now concrete in specified mixed should be pour in panel.
    after pouring of concrete, surface to be leveled with A straight edge and surface with wooden float or trowel.
    cement punning 2 to 3 mm thicker is spread over IPS flooring to archive glossy look of floor.
    curing period of minimum 15 day is required after construction.
    other fiber may be use to prevent cracks.
    sometime vacuum dewatering machine also use to get very hard surface of concrete floor.
    AdPushupReport this ad
    1 Share
    nikeetasharma Guru
    Added an answer on December 3, 2020 at 1:48 pm
    IPS flooring generally stands for Indian Patent Stone which is also considered as a cheap flooring. The constituent of this type of flooring is cement, admixture, down 10mm coloured/white chips mixed with required water of around 35-50 mm thick on rcc/pcc surface. It is done through panel system making by glass trip/aluminium strip. Flotter can be used to surface smooth.
    IPS floor can be used for all types of floors.
    1 Share
    Dhanya Beginner
    Added an answer on August 2, 2020 at 9:02 am
    Indian Patent Flooring (IPS) is a normal type of concrete flooring.
    Construction procedure:
    Make reference level on the wall. It is transferred across all the floor area.
    Flooring thickness to be marked and also dummy level dots should be provided in every 1 to 2m
    After proper setting, concrete of desired mix should be poured in panels to minimize shrinkage cracks.
    After pouring level the surface with trowel.
    Allow it to harden for about 36 hours
    For gloosy and smooth IPS flooring, neat cement pinning, 2 to 3 mm thick is spread over the concrete surface and allowed to soak.
    For curing of IPS flooring surface pond or wet Hessian cloths are spread over the surface for 15 days.
    0 Share
    You must log in to add an answer.
    Join for free or log in to continue reading...
    AdPushupReport this ad
    Continue with Facebook
    Continue with Google
    or use
    Username or email*
    Password*
    Captcha*
    Remember Me!Forgot Password?
    Need An Account, Join Here
    Sidebar
    Popular Articles
    Gopal Mishra
    Types of Foundation for Buildings and their Uses [PDF]
    Gopal Mishra
    Compressive Strength of Concrete -Cube Test [PDF], Procedure, Results
    Sadanandam Anupoju
    16 Types of Heavy Equipment Used in Construction
    Padmanabhan G
    Methods of Rainwater Harvesting [PDF]: Components, Transport, and Storage
    Gopal Mishra
    Calculate Quantities of Materials for Concrete -Cement, Sand, Aggregates
    Recent Articles
    Neenu S K
    How to Choose Tiles for Construction of Pools?
    Madeh Izat Hamakareem
    What is Relative Humidity of Concrete?
    Neenu S K
    How to Deal with Leaking Ceilings?
    Madeh Izat Hamakareem
    Effects of Unrepaired Early-age Cracking in Concrete Structures
    Madeh Izat Hamakareem
    What is Internal Curing of Concrete?
    Recent Questions
    jkshah
    Which is the code used for the design of the RCC Bridge?
    1 Answer
    AKM59
    What is the tolerance for compression test results of concrete, according to the standards?
    1 Answer
    Gopal Mishra
    What must be the maximum dry density of Granular Sub Base & Wet Mix Macadam used ...
    1 Answer
    Gopal Mishra
    What is the Safe Bearing Capacity values for Different Soils?
    1 Answer
    Gopal Mishra
    What are the different types of handrails used in bridges?
    1 Answer
    Footer
    Home
    About Us
    Contact Us
    Privacy Policy
    Terms & Conditions
    Ask Questions
    Write for us
    Popular Questions
    Facebook
    Inst

ความคิดเห็น •