I have gained best knowledge from this video, nicely explained each thing, can you explain about height restrictions during construction n expanding existing airport facilities, during working close to brownfield airpirt n it's operational live runway
hello Mr. Otu, sir how to deal with existing obstacle on Rwy strip for example a concrete building for operational requirement within a 140m (80m) in precise ?
Hello, the action to be taken depends on several factors. But generally 1. Remove the obstacle 2. Conduct Risk assessment to Determine operational significance against the risk posed and mitigate 3. Based on 2, either seek CAA exemption or remove the obstacle.
Thank you for this presentation 🙏🏽
I just loved 😍 that
Thank you so Mr Otu
Thanks for watching. Kindly invite more people to subscribe
I have gained best knowledge from this video, nicely explained each thing, can you explain about height restrictions during construction n expanding existing airport facilities, during working close to brownfield airpirt n it's operational live runway
Thank you Sir.
hello Mr. Otu, sir how to deal with existing obstacle on Rwy strip for example a concrete building for operational requirement within a 140m (80m) in precise ?
Hello, the action to be taken depends on several factors. But generally
1. Remove the obstacle
2. Conduct Risk assessment to Determine operational significance against the risk posed and mitigate
3. Based on 2, either seek CAA exemption or remove the obstacle.